Loading...
HomeMy WebLinkAbout2018 02 26 Consent 302 Sanitary Sewer Line RehabilitationCOMMISSION AGENDA ITEM 302 REQUEST: Informational Consent X Public Hearings Regular February 26, 2018 KS LR Regular Meeting City Manager Department The Utility Department requesting City Commission approval to award a contract to Layne Inliner, LLC in the amount of $243,819.50 plus a 2% contingency to perform Sanitary Sewer Line Rehabilitation, piggybacking off of the City of Orlando Contract (No. IFB 16- 0007) for Cured -in -Place Pipe (CIDP) Rehabilitation. SYNOPSIS: The purpose of this Agenda Item is to request authorization to piggyback off of the City of Orlando Contract No. IFB 16-0007 with Layne Inliner, LLC for relining of sanitary sewer lines at a cost of $243,819.50 plus a 2% contingency. CONSIDERATIONS: This project is needed for the on-going maintenance and rehabilitation of the City's sanitary sewer collection system. The Utility Department budgets annually for sewer line rehabilitation. The Cured -In -Place Pipe (CIPP) process, a trenchless technology, is the preferred method of rehabilitating the sewer lines by the City. The CIPP process is a folded, resin impregnated fabric that is pulled through the existing sewer line and expanded and cured in place. No excavating, digging, or restoration is required, which minimizes any inconvenience to residents. The amount of sanitary sewer lines planned for rehab at this time is as follows: 5,582 linear feet of 8" pipe and 322 linear feet of 21" pipe. The cost of CIPP lining per linear foot is $35.00 for 8" pipe and $90.00 for 21" pipe. Additional costs include cleaning and TV inspection. Consent 302 PAGE 1 OF 2 - February 26, 2018 The total cost for this sanitary sewer rehabilitation and televising project will be $243,819.50. The locations are on Sable Ct., Deer Run, Tarpon Cir., N. Hawthorne Cir., S. Hawthorne Cir., Cottonwood Dr., Locust Ct., Holly Ct., Spoonwood, the easement between Lift Station 7W and Mosswood Rd., and Augusta National Blvd. between E. Winged Foot Cir. and portion of W. Winged Foot Cir. These pipes and structures average 35 to 40 years old and are clay pipe, which makes them subject to cracking and groundwater infiltration. FISCAL IMPACT: Funding is appropriated in the Utility Enterprise code for sewer and manhole relining for FY2018 paid from this fund. COMMUNICATION EFFORTS: Fund Construction in Progress (CIP) line . The project cost of $243,819.50 will be This Agenda Item has been electronically forwarded to the Mayor and City Commission, City Manager, City Attorney/Staff, and is available on the City's Website, LaserFiche, and the City's Server. Additionally, portions of this Agenda Item are typed verbatim on the respective Meeting Agenda which has also been electronically forwarded to the individuals noted above, and which is also available on the City's Website, LaserFiche, and the City's Server; has been sent to applicable City Staff, Media/Press Representatives who have requested Agendas/Agenda Item information, Homeowner's Associations/Representatives on file with the City, and all individuals who have requested such information. This information has also been posted outside City Hall, posted inside City Hall with additional copies available for the General Public, and posted at six (6) different locations around the City. Furthermore, this information is also available to any individual requestors. City Staff is always willing to discuss this Agenda Item or any Agenda Item with any interested individuals. RECOMMENDATION: Staff recommends the City Commission authorize piggybacking off of the City of Orlando Contract No. IFB 16-0007 with Layne Inliner, LLC for the rehabilitation of sanitary sewer lines at a cost of $243,819.50 plus a 2% contingency, and authorize the City Manager and City Attorney to prepare and execute any and all applicable documents. ATTACHMENTS: 1. Layne Inliner, LLC Sewer Relining Proposal (1 page) Consent 302 PAGE 2 OF 2 - February 26, 2018 iV` iner c.., DATE: January 24, 2018 SUBMITTED TO: City of Winter Springs Utility 400 Old Sanford Oviedo Road Winter Springs, FL 32708 Attn: Paul Morrison JOB LOCATION: Winter Springs Sanitary 2017-2018 We propose hereby to furnish material and labor - complete in accordance with specifications below, for the sum of Two Hundred Forty -Three Thousand Eight Hundred Nineteen dollars and Fifty cents ($243,819.50) Payment terms -100% within thirty (30) days upon completion and acceptance. All material is guaranteed to be as specified. All work to be completed in a workmanlike manner according to standard practices. Any alteration or deviation from specifications below involving extra costs will be executed only upon written orders, and will become an extra charge over and above the estimate. All agreements contingent upon strikes, accidents or delays beyond our control. Owner to carry fire, tornado and other necessary insurance. Our workers are fully covered by Workman's Compensation insurance. Note: This proposal may be withdrawn by us if not accepted within thirty days. We hereby submit specifications and estimates as follows: Layne Inliner, LLC shall supply all equipment, materials and labor to install Inliner''14 as follows: PIvil LIN 1. Proposal based on pricing contained in a contract between Layne Inliner, LLC and the City of Orlando, Contract No. 1171316-0007. 2. Inliner to be installed as per ASTM & manufacturer's specifications. 3. Payment shall be based on actual field measurements from center of inlet to center of outlet. 4. This proposal is subject to pre -TV inspection by Layne Inliner, LLC indicating that line conditions are acceptable for installation of Inliner. 5. Price quoted does not include point repairs if required prior to installing Inliner. 6. Layne Inliner, LLC shall furnish the City of Orlando with a final inspection CD of the rehabilitated sewer lines. Signature .z �c�° 4 - To my Roberts iBranis Msfrager Acceptance of Proposal - The above prices, specifications and conditions are satisfactory and are hereby accepted. You are authorized to do the work as specified. Payment will be made as outlined above. Date of Acceptance ,.................. Authorized Signature 253V Jewett Lane, Sanford, FAL 32771 1 Office: 407.472.0014 Fax: 407,472,0097 1 layne,com