The Public Works Department requesting authorization to issue a purchase order to Traffic
Control Devices, Inc. for replacement of a damaged traffic signal pole at S.R. 434 and
Hayes Road in the amount of $71,483.22 plus a 10% contingency, piggybacking off
Seminole County contract #IFB- 602346- 15 /GCM.
SYNOPSIS:
A traffic signal pole and mast arm at S.R. 434 and Hayes Road was recently damaged in a
car accident and must be replaced. This agenda item is to award the construction work to
Traffic Control Devices, Inc. in the amount of $71,483.22, to be reimbursed by the driver's
insurance company.
CONSIDERATIONS:
On December 22, 2015, a vehicle traveling westbound on S.R. 434 went off the
roadway and collided with the traffic signal pole at the northwest corner of S.R. 434
and Hayes Road. The traffic signal pole and mast arm were knocked down and
damaged beyond repair. The driver did not suffer any major injuries. Seminole
County responded immediately and installed an operational temporary traffic signal
within five hours after the accident.
. The permanent replacement traffic signal required the preparation of engineering
plans and obtaining a permit from the Florida Department of Transportation (FDOT).
The City's engineering consultant, Pegasus Engineering, has completed the plans, and
the FDOT permit was issued in May 2016.
Consent 302 PAGE 1 OF 2 - June 13, 2016
. Traffic Control Devices, Inc. (TCD) is under contract with Seminole County (Bid
#IFB- 602346 -15 /GCM) for traffic signal construction and maintenance. TCD's price
to install the replacement traffic signal per the approved plans is $71,483.22, based on
the unit prices in TCD's Seminole County contract.
The construction cost of $71,483.22, plus costs previously incurred for design,
permitting, the temporary traffic signal, and other related items, will be submitted for
reimbursement by the driver's insurance company.
FISCAL IMPACT:
The project cost is $71,483.22 plus a 10% contingency, funded by reimbursement from the
driver's insurance company.
COMMUNICATION EFFORTS:
This Agenda Item has been electronically forwarded to the Mayor and City Commission,
City Manager, City Attorney /Staff, and is available on the City's Website, LaserFiche, and
the City's Server. Additionally, portions of this Agenda Item are typed verbatim on the
respective Meeting Agenda which has also been electronically forwarded to the individuals
noted above, and which is also available on the City's Website, LaserFiche, and the City's
Server; has been sent to applicable City Staff, Media/Press Representatives who have
requested Agendas /Agenda Item information, Homeowner's Associations/Representatives
on file with the City, and all individuals who have requested such information. This
information has also been posted outside City Hall, posted inside City Hall with additional
copies available for the General Public, and posted at six (6) different locations around the
City. Furthermore, this information is also available to any individual requestors. City Staff
is always willing to discuss this Agenda Item or any Agenda Item with any interested
individuals.
RECOMMENDATION:
Staff recommends the City Commission approve issuing a purchase order to Traffic Control
Devices, Inc. for replacement of a damaged traffic signal pole at S.R. 434 and Hayes Road
in the amount of $71,483.22 plus a 10% contingency, piggybacking off Seminole County
contract #IFB- 602346 -15 /GCM., and authorize the City Manager and City Attorney to
prepare and execute any and all applicable documents.
ATTACHMENTS:
1. Exhibit A - Photo of Damaged Traffic Signal Pole (1 page)
2. Exhibit B - TCD Proposal (2 pages)
Consent 302 PAGE 2 OF 2 - June 13, 2016
i
EXHIBIT
zoo
"
Y � � -' '•r1 = \ F } —
1�
fib , �.�.r� r.{' ,� }�.
1
i{,�1��� ii
i
Ads
?��-••
•�if. �/_c_'
_ _... � rte-. � i I{ �
/�
�;',
Yom:-
'
tr. '_�" tFrw�- i'.��;�•
�� .�.,�:.,''•q�:'-'
.
i
TRAFF1O
19 CONTROL
rr DI -vIOE , INC-
EXHIBIT B
Corporate Office
242 North Westmonte Drive
Altamonte Springs, Fl 32714
Phone - 407.869.530D
Fax - 407.682.0076
-www.TC D- USA.com
Local Offices
Altamonte Springs. FL
Clerniont, FL
Deland, FL
Jacksonville, FL
Pompano, FL
Punta Gorda, FL
Rockledge. FL
Sarasota, FL
Tampa, FL
Dallas, TX
Houston, T
San Antonio, TX
Salisbury. NC
To:
City Of Winter Springs
Contact:
Brian Fields, P.E.
Address:
110 Flamingo Avenue
Phone:
407 - 327 -1800
Grounding Electrode F&I
Winter Springs, FL 32708 USA
Fax:
Conduit, Underground F&I
Project Name:
701 -16 - City Of Winter Springs - SR434 At Hayes Rd
Bid Number:
IFB- 602346- 15 /GCM
Project Location:
SR434 At Hayes Rd, Winter Springs, FL
Bid Date:
5/13/2016
Line # Item #
Item Description Estimated Quantity
Unit
Unit Price Total Price
1 -Mob & MOT
0101 1 Mobilization (5 %)
0102 1 Maintenance Of Traffic (1 %)
2- Contract Items
4
522 -1
Concrete Sidewalk 4" F&I
401
690 -95
Sidewalk Removal
9
620 -1 -1
Grounding Electrode F&I
11
630 -2 -11
Conduit, Underground F&I
14
630 -2 -12
Conduit, Directional Bore F&I
16
632 -7 -1
Signal Cable F &I
399
690 -90
Conduit And Cabling Remove
402
690 -100
Signal Equip Misc. Remove
41
635-2-1 la
Pull & Junction Box, Ground Mounted W /apron F&I
104
643 -600
Strain Pole Wood, Remove
105
646 -1 -11
Aluminum Signal Pole & Pedestal F &I
108
647 -c
Pre - excavation (per Structure) Furnish Only
111
647 -f
Foundation Inspection Furnish Only
113
647 -h
Inspection Tube For Foundations Per FDOT F &I
115
648 -1b
48" Conc. Found. For Mast Arms, PF F &I
233
648 -99E
M/A Decorative Base Single Arm Under 60' Furnish
Only
155
648- 11 -50F
Mast Arm Steel Single Arm (Fluted) Sem. Co. Std.
F &I
261
649 -36 -300
Mast Arm Remove Shallow Foundation, Bolt On
Attachment F&I
290
650 -1 -1311
Traffic Signal 12" Std 3S1W F &I
313
650 -1 -551
Signal Head 12 Std 5S1W STD F&I
318
653 -1 -11
Pedestrian Signal LED Countdown, Int Sym F&I
373
665 -1 -11
Pedestrian Detector (Bulldog) F &I
407
700 -5 -22B
LED Illuminated Street Sign 8'X 19" F &I
426
715 -11 -113
Luminiare Acorn Pole Top F &I
398
69080
Span Wire Assm Remove
387
690 -10
TSA Remove
3- Non - Contract Items
** *527 -2 Detectable Warnings
1.000 LS $3,371.85 $3,371.85
1.000 LS $674.37 $674.37
Total Price for above 1 -Mob & MOT Items: $4,046.22
12.000 SY
12.000 SY
40.000 LF
285.000 LF
180.000 LF
1.000 INT
1.000 INT
1.000 INT
4.000 EACH
2.000 EACH
1.000 EACH
1.000 EACH
1.000 INT
16.000 LF
16.000 LF
1.000 EACH
1.000 EACH
1.000 EACH
1.000 EACH
1.000 EACH
1.000 EACH
1.000 EACH
1.000 EACH
1.000 EACH
1.000 EACH
2.000 EACH
$78.00
$49.50
$10.75
$7.50
$17.50
$6,250.00
$261.00
$210.75
$484.00
$1,025.00
$841.00
$335.00
$4,130.00
$36.25
$906.00
$2,585.00
$14,631.00
$2,540.00
$935.00
$1,472.00
$669.00
$240.50
$2,312.75
$1,430.50
$280.00
$37.00
Total Price for above 2- Contract Items Items:
$936.00
$594.00
$430.00
$2,137.50
$3,150.00
$6,250.00
$261.00
$210.75
$1,936.00
$2,050.00
$841.00
$335.00
$4,130.00
$580.00
$14,496.00
$2,585.00
$14,631.00
$2,540.00
$935.00
$1,472.00
$669.00
$240.50
$2,312.75
$1,430.50
$280.00
$74.00
$65,507.00
16.000 SF $47.50 $760.00
5/12/2016 10:43:04 AM Page 1 of 2
Line # Item #
Item Description
Estimated Quantity Unit
Unit Price
Total Price
** *659 -99
Confirmation Light (F&I)
1.000 EACH
$550.00
$550.00
** *670 -5 -400
Modify Traffic Controller Assembly
1.000 AMBY
$620.00
$620.00
Total Price for above 3- Non - Contract Items Items: $1,930.00
Total Bid Price: $71,483.22
Notes:
• This proposal is a unit price proposal. The total sum is an approximate sum based on the estimated quantities on the attached proposal (which is an
integral part of this proposal) at the unit prices depicted thereon. The final contract amount of any contract resulting from this proposal shall be
based on the quantities actually installed and field verified by the Owner's architect /engineer at these unit prices.
• This proposal is per the Seminole Co. Contract. Items * * ** are non - contract items.
Payment Terms:
Payments are to be made to us by the tenth day of the month for all work installed and materials placed on the job site during the preceding month.
Final Payment including retainage, if any, will be due not more than thirty (30) days after completion and acceptance of the work. Any contract
resulting from this proposal shall be on the terms and conditions mutually acceptable to the Purchaser and Traffic Control Devices, Inc.
ACCEPTED:
The above prices, specifications and conditions are satisfactory
and hereby accepted.
Buyer:
Signature:
Date of Acceptance:
CONFIRMED:
Traffic Control Devices, Inc.
IVAuthorized Signature:
Estimator: Rob Rebert
407 - 869 -5300 r.rebert @tcd- usa.com