HomeMy WebLinkAbout2015 10 21 Regular 602 Status Of The Tuscawilla Fountains and Wall RepairTUSCAWILLA LIGHTING AND
BEAUTIFICATION DISTRICT
ADVISORY COMMITTEE
AGENDA ITEM
ITEM 602
October
Regular Meeting
REQUEST:
Informational
Consent
Public Hearings
Regular
I X
The Public Works/Utility Departments — Urban Beautification Division Requests That The
Tuscawilla Lighting And Beautification District Advisory Committee Receive Information On
The Status Of The Tuscawilla Fountains And Wall Repairs.
ATTACHMENT(S):
A. Fountain Upper And Middle Waterfall Re- Grouting Proposal From
Alternative Wall Systems Inc. (1 page)
B. North And South Fountain Sump Pump Discharge Piping Extension Proposal
(1 page)
C. Aerial Photographs Of Fountains (2 pages)
Fountain Upper and Middle Waterfall Re- grouting Proposal from AWS - Attachment A
PROPOSAL
Alternative Wall Systems Inc.
1117 Seafarer Lane
Winter Springs, FL 32708
Mike Masters
407 - 765 -0038
October 9,2015
Submitted to:
City of Winter Springs
For regrout and waterproof brick walls of waterfalls of 2 fountains at Tuskawilla
and Winter Springs Bluvd.
Scope of work:
Prep brick by accordance of product ( clean,sand ext.)
Regrout brick with Spectralock Pro Pemium Grout product per label directions.
Waterproof walls with 3M Polyester Resin product witch is in liquid form and is
applied like paint.
Total $3,200.00
North and South Fountain Sump Pump Discharge Piping Extension Proposal - Attachment B
407 -366 -5847
www_EastwoodT�� jT! urJ ti � ��:
Landscape Division Field Proposal
Property / Client
City of Winter Spring- TLBD
Main Entrance Drainage Repairs
Date
9/29/2015
Problem Description:
Drainage Repairs
South Side- fountain drainage repairs
Option 1- 2" SCH 40 (320ft) to storm drain on sw corner
Option 2- 2" SCH 40 (80ft) and 4" NDS drainage pipe (240ft) to storm drain on sw corner
Option 3- 2" SCH 40 (80ft) to blvd gutter curb
North Side- fountain drainage repairs
2" SCH 40 (100ft) to storm drain on sw corner
Materials Needed for Enhancement:
Unit Price
Quantity
Extended Price
South- option 1 (2" SCH 40 installed)
$ 4.00
320
$ 1,280.00
0
$ 3.25
407 -366 -5847
www_EastwoodT�� jT! urJ ti � ��:
Landscape Division Field Proposal
Property / Client
City of Winter Spring- TLBD
Main Entrance Drainage Repairs
Date
9/29/2015
Problem Description:
Drainage Repairs
South Side- fountain drainage repairs
Option 1- 2" SCH 40 (320ft) to storm drain on sw corner
Option 2- 2" SCH 40 (80ft) and 4" NDS drainage pipe (240ft) to storm drain on sw corner
Option 3- 2" SCH 40 (80ft) to blvd gutter curb
North Side- fountain drainage repairs
2" SCH 40 (100ft) to storm drain on sw corner
Materials Needed for Enhancement:
Unit Price
Quantity
Extended Price
South- option 1 (2" SCH 40 installed)
$ 4.00
320
$ 1,280.00
South- option 2 2 SCH 40 & 4 drainage)
$ 3.25
320
$ 1,040.00
South- option 3 (2" SCH 40 installed)
$ 5.50
80
$ 440.00
North- (2" SCH 40 installed)
$ 4.00
100
$ 400.00
Total Estimated Cost TBD
ETT Manager Ian Eastwood Authorizing Agent
ISignature 1 9. Isignature
Date 9/29/2015 Date
N
U
Q
n
N
V/
C7
r�
V
r
M.
0
(1)
^\V,
^W
V
1
n�
V