HomeMy WebLinkAbout2015 07 15 Other - Documents Provided by StaffDate: July 15, 2015
The attached documents were referenced by
Staff and discussed during the July 15, 2015
Tuscawilla Lighting and Beautification District
Advisory Committee Regular Meeting.
TROTWOOD ENTRANCE WALL PRESSURE WASHING -SOUTH WALL
BEFORE
AFTER
TROTWOOD ENTRANCE WALL PRESSURE WASHING -NORTH WALL
BEFORE
AFTER
exa
lo0 ��
28= 4U'43.2L" II 81=15'L3.42" %: e1ev 52 k z alt 64 k
, .r 11•
-"Nunn
.� Now.-_
OL
�� � fxlt5treet Vlew
M
a
Goode -earth
28 =40'92 99" f! 81= 15'17.52" V. elev 58 k e,e alt 64 k
TLBD YTD Monthly Expenditures
Account Description Vendor Date Amount Description
Fountains Beginning Balance $23,255.00
Tom Evans 02/17/2015 $502.00 Replace north fountain pump-partial
05/13/2015 $3,363.28 Replace north fountain pump-paid in full
CPH 04/01/2015 $600.00 Engineering report for fountains
Fountain
Doctors 11/04/2014 $650.00 Basic maintenance Oct
11/17/2014 $650.00 Basic maintenance Nov
12/09/2014 $160.00 Oct additional fountain repair
01/05/2015 $650.00 Basic maintenance Dec
01/13/2015 $650.00 Basic maintenance Jan
02/25/2015 $650.00 Basic maintenance Feb
2/25/2015 $532.60 Repair S fountain waterfall pump
04/01/2015 $650.00 Basic maintenance Mar
04/21/2015 $650.00 Basic maintenance Apr
05/20/2015 $650.00 Basic maintenance May
06/24/2015 $650.00 Basic maintenance June
04/13/2015 $30.00 Replace 2 lightbulbs North fountain
YTD Total YTD Expense Total $11,037.88
Encumbered $10,042.40
End Balance $2,174.72
Grounds Beginning Balance $105,000.00
Power
Exterminators 11/04/2014 $868.00 WSB chemical maintenance Oct
11/17/2014 $868.00 WSB chemical maintenance Nov
12/12/2014 $868.00 WSB chemical maintenance Dec
01/05/2015 $868.00 WSB chemical maintenance Jan
02/25/2015 $868.00 WSB chemical maintenance Feb
04/21/2015 $868.00 WSB chemical maintenance Mar
104/29/20151 1 $868.00 IWSB chemical maintenance Apr
A Budget Tree
Service 05/01/2015 $5,125.00 Removal of trees behind fountains
Eastwood 11/04/2014 $5,477.40 WSB regular maintenance Oct
11/17/2014 $5,477.40 WSB regular maintenance Nov
Replaced various broken heads and repaired
11/17/2014 $337.82 solenoid median 14
12/09/2014 $25.98 Replaced broken sprinkler heads
12/12/2014 $5,477.40 WSB regular maintenance Dec
01/05/2015 $21.75 Dyson broken sprinkler heads
01/13/2015 $5,477.40 WSB regular maintenance Jan
01/28/2015 $3,023.72 Large irr. repair on WSB at Sam Smith
02/25/2015 $5,477.40 WSB regular maintenance Feb
Addtl landscape maintenance for sight
03/05/2015 $2,000.00 distance
03/11/2015 $2,205.00 Install Sylvester near Georgetowne
Replaced broken heads on 8 zones, repaired 2
valves near Sam Smith, replaced valve at zone
03/20/2015 $480.65 64
04/01/2015 $480.04 Repair broken sprinkler heads on 19 zones
04/13/2015 $5,477.40 WSB regular maintenance Mar
Repaired leak on 1/2" line on zone 4,
04/21/2015 $355.33 replaced irr timer at Tuscora
04/21/2015 $5,477.40 WSB regular maintenance Apr
05/20/2015 $5,477.40 WSB regular maintenance May
05/20/2015 $85.00 Repaired valve stuck on median 22
Repair backflow at Tuscora entrance,
replaced solenoid zone 7, replaced decoder
06/09/2015 $1,596.43 zones 52-55
06/24/2015 $5,477.40 WSB regular maintenance June
Landscaping at Howell Creek, Deer Run, and
106/24/20151 1 $1,546.48 ITrotwood. Replaced duranta near 7-11.
YTD End Balance 1 $72,655.80
Encumbered $23,627.09
End Balance $8,717.11
C D
Grounds Signs/Walls Beginning Balance $12,745.00
Lightscapes 11/24/2014 $425.00 Oct basic maintenance
12/09/2014 $425.00 Nov basic maintenance
12/09/2014 $425.00 Dec basic maintenance
2/25/2015 $425.00 Jan basic maintenance
Replace 28 spot lights at fountain entrance
and 12 replacement photocells at small
02/25/2015 $3,528.50 monuments
04/08/2015 $425.00 Feb basic maintenance
5/12/2015 $425.00 Mar basic maintenance
05/12/2015 $425.00 Apr basic maintenance
06/24/2015 $425.00 May basic maintenance
YTD End Balance $6,928.50
Encumbered $3,096.50
End Balance $2,720.00
0
Contract Admin Beginning Balance $9,900.00
NBS 01/05/2015 $1,755.02 Quarterly bill for admin of TLBD
03/20/2015 $1,755.02 Quarterly bill for admin of TLBD
YTD End Balance $3,510.04
Encumbered $5,585.26
End Balance $804.70
0
Utilities Beginning Balance $51,500.00
Seminole Co 10/15/2014 $53.90 irr. at Howell Creek/Deer Run Oct
11/12/2014 $50.75 irr. at Howell Creek/Deer Run Nov
12/16/2014 $53.37 irr. at Howell Creek/Deer Run Dec
01/21/20151 $53.90 lirr. at Howell Creek/Deer Run Jan
02/18/20,151 $52.15 lirr. at Howell Creek/Deer Run Feb
03/16/20151 $47.60 lirr. at Howell Creek/Deer Run Mar
04/10/2015 $49.00 irr. at Howell Creek/Deer Run Apr
05/15/2015 $46.55 irr. at Howell Creek/Deer Run May
06/15/2015 $43.75 irr.At Howell Creek/Deer Run June
City of Winter Irr Vistawilla/Tuscora/Fountain
Springs 10/21/2014 $345.58 Potable/Trotwood-Oct
Irr Seneca/Shetland/Medians 21-
10/22/2014 $2,096.00 23/Fountains reclaim/Dyson-Oct
Irr Vistawilla/Tuscora/Fountain
11/14/2014 $277.08 Potable/Trotwood-Nov
Irr Seneca/Shetland/Medians 21-
11/19/2014 $1,101.07 23/Fountains reclaim/Dyson-Nov
Irr Vistawilla/Tuscora/Fountain
12/10/2014 $258.68 Potable/Trotwood-Dec
Irr Seneca/Shetland/Medians 21-
12/17/2014 $534.06 23/Fountains reclaim/Dyson-Dec
Irr Vistawilla/Tuscora/Fountain
01/14/2015 $310.28 Potable/Trotwood-Jan
Irr Seneca/Shetland/Medians 21-
01/22/2015 $278.18 23/Fountains reclaim/Dyson-Jan
Irr Vistawilla/Tuscora/Fountain
02/18/2015 $297.97 Potable/Trotwood-Feb
Irr Seneca/Shetland/Medians 21-
02/18/2015 $217.72 23/Fountains reclaim/Dyson-Feb
Irr Vistawilla/Tuscora/Fountain
03/11/2015 $323.87 Potable/Trotwood-Mar
Irr Seneca/Shetland/Medians 21-
03/18/2015 $224.64 23/Fountains reclaim/Dyson-Mar
Irr Vistawilla/Tuscora/Fountain
04/15/2015 $1,787.30 Potable/Trotwood-April
Irr Seneca/Shetland/Medians 21-
04/22/2015 $3,511.55 23/Fountains reclaim/Dyson-April
Irr Vistawilla/Tuscora/Fountain
105/13/20151 1 $1,445.63 1 Potable/Trotwood-May
Irr Seneca/Shetland/Medians 21-
05/22/2015 $1,025.01 23/Fountains reclaim/Dyson-May
Irr Vistawilla/Tuscora/Fountain
Potable/Trotwood-June *Leak adjustment
06/10/2015 $8,304.16 pending.
Irr Seneca/Shetland/Medians 21-
06/17/2015 $577.45 23/Fountains reclaim/Dyson-June
Duke Energy 10/21/2014 $2,453.34 Duke entrance lighting Oct
11/18/2014 $2,373.99 Duke entrance lighting Nov
12/22/2014 $2,216.33 Duke entrance lighting Dec
01/29/2015 $2,669.92 Duke entrance lighting Jan
02/23/2015 $2,242.07 Duke entrance lighting Feb
03/23/2015 $2,463.59 Duke entrance lighting Mar
04/21/2015 $2,601.34 Duke entrance lighting Apr
05/19/2015 $2,257.98 Duke entrance lighting May
06/23/2015 $2,389.85 Duke entrance lighting June
YTD End Balance $45,035.61
Encumbered $0.00
End Balance $6,464.39
0
Streetlights Beginning Balance $234,500.00
Duke Energy 10/21/2014 $19,559.23 Duke Energy streetlight October
11/18/2014 $19,279.18 Duke Energy streetlight November
12/22/2014 $19,279.18 Duke Energy streetlight December
01/29/2015 $19,291.39 Duke Energy streetlight January
02/23/2015 $19,277.67 Duke Energy streetlight February
03/23/2015 $19,277.67 Duke Energy streetlight March
04/21/2015 $19,277.67 Duke Energy streetlight April
05/19/2015 $19,259.83 Duke Energy streetlight May
06/23/2015 $19,259.83 Duke Energy streetlight June
YTD End Balance $173,761.65
Encumbered $0.00
End Balance 1 $60,738.35