HomeMy WebLinkAboutSubdivision Checklist-1972 J
•
OillIVIJ. 1 vlXi.i..► i1 ' /,
1•
I N,V„L0.t: .P11 PL\N3 - 30 days prior to regular Planning & Zoning
. Meeting. 1
1
1. Scale 1" = 100' or other appropriate scale
2. Tentative street layout '
3. Approximate RAI width .
4. Lot arrangement •
5. . Drainage and utility easements ••
6. - Existing structures
7. Canals and waterways ••
8. Approximate number of. acres devoted to each use
9. Total acreage
10. Average lot size
11. Ap proxirate• number of lots
12. Existing zoning . l •
+ 3. • P. _.,, .,••/ 5.,-.,,e cc• 0," ..v=i 9 $:.wr L .
II •PR LIEIi1aY PLAT - 30 days prior to regularly scheduled .
Planning and Zoning Ieeting .
1. One (1) reproducible of plat •
• 2. five (5) copies of plat and five (5) copies of required exhibits
•
•
A. Preliminary Plat Information •
1
1. Scale 1" = 100' •
• 2. Boundaries with bearings, distances, closures, •
bulkhead lines •• • ••
3. Location, width and depth of .canals and waterways
• • 4. Names of adjoining subdivisions and/or property .
owners •
• 5. Zoning classification of property and surrounding _
property .
6. Proposed streets and names
7. Fights-of-way .and pavement widths . • .
• 8. Location of existing water and sewer systems
9. Easements location, widths and purposes •
•. 10. Lot lines • •
11. Lot dimensions and block numbers
. 12. .Public open space and reservation • - :
. 13. Title and date .
• 14. North point and graphic scale : . • .
15. Owners rate, engineer, surveyor or land planner • : .
16, ,Other proposed uses, if any _ •
.17. Acreage in total tract and each use � ,
18. Average lot size . i •
19. Total number of lots •
20. Lineal feet in streets .•
• 21. Vicinity map •
•
B. Topographic map. (see page 8, Subdivision Regulations)
• C. Preliminary Engineering Plans
• 1. Typical cross-section and sidewalks
2. Water system / .
3. Sewer system ,
• 4, Drainage system /� - / `�"•� "' ~, •
"7� J I .► L�'f' ..,e;i.i. L Qr•1_LI.•'f A A L v t..S e:et-‘...., 4�wi. t.,.../ i•3. Two (2.) filcw.:(( L !i.L4.` fl1.;; d(::;cribing propof3Ud use ol. the •1 nd
and a draft of any protective covenants to be applied to the
subdivision
II . Yhr, or 4X1.00 or ! ) .00 irrt'!•' lout whi.c11rjvcr In creator
III FINAL •
1. One (1) original of final plat (1" = 100' ) on linen ' .
• 2. Five (5) copies of final plat
A. Final Plat Info�•�� tion ' • •
+1 . i(i 1'iii ii-•f7.f'--;tw 1.a.tlr3 i ,
2.. Namos of s Lvoots aad roads , .
. 3. Lot lines , lot and bloc; numbers •
• 4. Location, width and depth of all canals and waterways
•
I
♦ i ,
•
•
5. Geometry for right-of-ways, boundary (with error of
closure) , bloc'•; lines tied to required monuments.
. •G. Radius , central r.U1[1 e , ;point of tnnf:,ecit, tangent
distance, ;uv1 area and chords of all street and
• property line curves.
• 7. Legal description tied to required monuments '
• ' 8. • True north point and accurate location and description
• of monu::;onts and marker3
9. Names and locations of adjoining subdivisions and
• . streets ; and location of adjoining unsubdivided
property.
10. Title, date , name and location of subdivisions and
gc'ra;)hi.c scale.
. ' 11. Certificates on plat as required by Chapter 177,
Florida Statutes : owner showing dedication, surveyor
confirming correctness , and space for Planning and •
• Zoning Commission, Board of Commissioners and Clerk. •
. 12.• Consent and approval by mortgagee. • •
•
B. EnRineeri.»c Dra:rinrs .
• • 1. 6torm sewers
• • 2. Bulkheads, if any ' .
3. Sidewalks . . ' •
4. . Streets ' .
5. All other drainage facilities . •
• C. Bonds
.Performance Bond - 110% of paving and drainage cast •
• 2. Mnirtf;on.anco Bond, •
• • 3. Sidewalk performance bond - 110% of construction cost
to continue for two (2) years after 'acceptance of
• streets by county. . •
•• D. Protective Deed Covenants •
• • • E. Certificate of Title S'horrinr;-
L.—Owners of property -
• 2. Mortgages, leins and other encumbrances
3. Taxes and assessments paid
4. •Description on plat is correct _
. P. Recording fees must be paid to clerk of circuit court when
final approval is received. - • .
. .3. Plat must be properly signed and executed by subdivider and his :
. . agents.
.
•
•
•
•
, .. . ~ • •
F,t?1)J:'.1 I1 CW:C1: LIZT
:Name of I'lot
Date Rec./Li/ad �Date 4l-roved
1. DI:V2I.CIV:-.TT FLAN Date Received
Plat Review Committee Date
r--IFlanninc & Zoning- Committee Date
►!! I ) Board of Commiecionern Date
Comments and Variances
•
2. PRELIMII.ARY PLAT Date Received
Eiat Review Committee Date
flPlenning & Zoning Committee Date
L_J Board of Commiasioaern Date
Comments and Variances
3. FINAL PLAT Date Received
LIIPlat Review Committee Date
1--IPlanning & Zoning Committee Date
LIBoard of Commissioners Date
Attorney Date
County Engineer Date
Comments
"A
FINAL PLAT PROCEDURE
In order to have a final plat presented to the Board of County
Commissioners for approval , certain procedures must be followed .
1 . Preliminary must be approved .
2 . Final Plat must be presented twenty ( 20) days prior to
a regularly scheduled meeting of the Planning and Zoning
Commission .
3 , Final Plat linen and five ( 5 ) copies of the linen and
appropriate engineering drawings must be submitted .
4 . All signatures must be on the linen before it is presented .
If all signatures are not on the linen , it will not be
• accepted .
5 . Before the plat can be presented to the Board of
Commissioners , the County Engineer will present a signed
check sheet to the Planning Department .
6 . Bond( s ) and Certificate of Title (see Subdivision Regulations
p . 12 "c" and "e " ) must be presented before 12 : 00 Noon
Friday in order to present a plat to the Board on the
following Tuesday .
7 . Contractor ' s estimates for paving , drainage and sidewalks
shall be presented with the bond .
• 8. All final plats will be presented during the County
Planner ' s report before the Board of Commissioners between
3 : and 4 : 00 P . M . , on Tuesdays . The Developer or his
representative must be present during this presentation .
9. Final Plats will be turned over to the Clerk ' s Office
immediately after approved by the Board of Commissioners
and will not be removed from the Clerk ' s Office without his
written permission .
NOTE : Once a Final Plat is presented to the Planning Department ,
it will not be removed without the County Planner ' s approval .
David T . Farr
Seminole County
Planning Department
•
•
•
I
SUBDIVISION CHECK LIST
Name of Plat
Status Date Submitted
Developer
Zoning_ No . of Lots
Average Lot Size Acreage in Plat
Improvements Required :
1 . Water
2 . Sewer
3. Sidewalks
4 . R/W
5 . Pavement
General Conditions :
1 . Drainage
2 . Flooding
3 . Soil Types
4 . Surrounding Zoning
5 . Cul -de-Sacs
Recommendations and Dates Approved :
1 . Planning Department
2 . Plat Review Committee
3. County Engineer
4 . Utility Control
. .
5 . Planning and Zoning Commission
6 , Cntsn4 AttornPv
____Date Bond Received Date Approved
Additional Comments :