HomeMy WebLinkAboutBuilding Permit Fees •
3U1:.Li-G PERPMIT FEES
?1h e.e the valuation does not exceed 2103. 00 no fee shall be required,
on inspection is necessary, in which ease there shall be a fee
of $2. 00.
For a valuation over $100.00 up to and including $15,000 the fee shall be 73. 00 per $1,000 or fraction thereof,
pors.it fee is $5.00.
100. to 1 ,030,
2,000. 6. 00
3,000 6, Go
4,003 9. 00
-1
$,600 2. 00
x ,000 15. 00
v x,00 1J, 00
3,000 21 .00
9, 000 24.00
10 000 27. 00
r, ,00,E 30. 00
' 2,000 33. 03
13,000 39, 00
OG0 39.00
15,000 42. 00
45.00
yof a valuation over 15, 300 up to and including $100,000. 00 the fey,
shall be $45. 00 for the first $15,000 n '
thousand or fraction thereof. plus w2. OC for each additions
1~„o00
49.00
9
51 . 00
,300
0
2 _ 0
0,000
21 ,000 7>. 3G
22, 000
23,000 >3.00
21;.,303 51 . 00
2;, 000
3. 00
,000 h5. 00
,000 A7. 00
2/,000 x'9. 00
71. 00
29,000
73. 00
30,030
75. 00
?or b valuation over $1002000 up to and including $500 000 the fee shall
or b 1015, 00 for the first $100,000 plus $1 , 00 for each additional thousand
fraction thereof.
r'cr a valuation over $500,000 up to and including $1 ,000,000 the
"1 0e 0615 for the first five hundred thousand 1 fec
additional. thousand or fraction thereof. Pus 40� for eac'.
'o: a valuation over $1 , 000,000 the fee l for
uJil '' ion plus 1.5% for each additional. thousand or fraction thereof,irst