Loading...
HomeMy WebLinkAbout2015 02 03 Informational 201 Parks and Recreation Department 2014 "List of Accomplishments" PARKS AND RECREATION ADVISORY COMMITTEE AGENDA Informational X Consent ITEM 201 Public Hearings Regular February; 2015 Mgr. / Dept. Regular Meeting Authorization REQUEST: The Parks and Recreation Department wishes to inform the Parks and Recreation Advisory Committee about the 2014 Accomplishments and Improvements made in the Parks. CONSIDERATIONS: • The Parks and Recreation Department created a plan for 2014 to make improvements in the parks. • The goal of the plan was to improve safety and make upgrades in the parks that would benefit the residents. RECOMMENDATION: The Parks and Recreation Department requests the Parks and Recreation Advisory Committee receive and review information provided in this Agenda Item. ATTACHMENTS: Attachment A—2014 Accomplishments City of Winter Springs Parks and Rec Department Accomplishments and Improvements for 2014 Civic Center o Kitchens and bath remodel o Repainted exterior of building Senior Center o Increased revenue by 20% (rate reclassification) o Repainted exterior of building o Installed new senior center sign o Increase programming at Senior Center  Dance Cardio, Cardio Fit, Zumba Gold o Replaced 2 a/c systems o Upgraded all safety lights Therapy Pool o Increased revenue by 35% (rate reclassification) o Replaced all shower valves in pool showers o Tint windows on therapy pool entry door o Installed new safety equipment Sunshine Park o Removed old concrete basketball gooseneck poles, installed new steel gooseneck poles, backboards, rims and nets Torcaso Park o Splash Pad- removed old, built up acrylic texturing on splash pad surface. o Installed 100 yards of mulch for safety surfacing on playgrounds o Refurbished existing shade cover structure and repainted, install new shade cover fabric on to shade covers o Replaced all old and rusted exterior electrical panels Moss Park o Install new camera o Removed old falling down fence at creek Winding Hollow Park o Installed 300 lf playground containment border, removed broken play feature, adjusted slide location so not to slide into parking lot, installed 75 yds of playground mulch for safety surfacing Trotwood Park o Resurfaced tennis courts, installed new wind screen, installed plants around tennis courts, found old irrigation system and revamped and added red mulch o Installed new concrete craw-through log play feature, install 140 yards of mulch for safety surface in playgrounds o Installed new backboards and rims on basketball court o Installed new entry sign o Painted exterior of racquetball court wall o Removed and replaced 150 lf of damaged sidewalk Sam Smith Park o Removed old saucer play feature, installed new oodle swing play feature, installed 100 yards of mulch for safety surfacing in playgrounds Central Winds Park o Killed off old multi-variety turf grass, brought in 625 tons of organic/sand mixture, laser leveled field and hydro seeded field with princess 77 Bermuda grass o Installed over 1000 ft of playground containment borders, installed over 200 yds of playground mulch for safety surfacing on both playgrounds, refurbished existing playground shade structure and repainted, installed new shade cover fabric, replaced all swings with new attachments, chains and seats o Installed new water line to expansion for highland games use o Upgraded all electrical panels in amphitheater for special event o Removed old add a phase power hog unit that runs fountain behind amphitheater, ran new power to existing location and added new electrical service o Isolated and added expansion area directly to reclaim plant for irrigation o Paved passive area road o Tinted windows and admin office o Demo old shade structure and started construction of new shade structures o Removed lockers in restrooms o Remove old rusted grills, poured new concrete pads and installed new grills o New water fountain by baseball fields o Installed new landscape wall at Lallathin memorial, added new plants and lava rock o Painted exterior of maintenance shop o Replaced all bulbs and ballasts on Soccer field lights Parks & Recreation Department o Replaced all city logos at park entrances o Took over and revamped banner program from urban beautification o Setup, maintain and teardown of 4 off-site and 2 major onsite city events o Perform 4 community events with no cost to taxpayers o Setup and tear down Christmas tree o Increase sponsors at events by 2 Oviedo Wellness, Lach Orthodontics o Signed 10 year agreement to host CF Highlands Games o Increase Camp Sunshine enrollment by and average 20% per week o Increase Camp Sunshine revenue by $11,000 (18%) o Increased partnership revenue by $15,000 o Hosted Jamaican Women’s National Soccer team practice o Hosted commercial shoot for Academy Sports o 2014 Seminole County CVB Event of the Year (Highlands Games)