HomeMy WebLinkAbout2015 01 12 Informational 200 Current Planning Projects COMMISSION AGENDA
Informational X
Consent
ITEM 200 Public Hearin s
g
Regular
January 12, 2015 KS RS
Regular Meeting City Manager Department
REQUEST:
Community Development Department is advising the City Commission of the status of
various current planning projects.
SYNOPSIS:
The projects listed below are those with some consistent activity, although not every project
has additional activity for every update report. Items listed below that have changed since
the last update are shown in bold type. Items which have not and do not appear likely to
generate any change are periodically dropped from this agenda item with prior notice to the
City Commission.
CONSIDERATIONS:
Bart Phillips/419 Auto &Metal— This project remains on hold pending the outcome of the
CSX railroad crossing and the trail right-of-way swap. Construction of the wall along SR
419, east of Wade Street is underway with inspections on-going.
Big Citv Catering - Staff is in receipt of a building permit application for a commercial
alteration for 1120 Orange Avenue. The building is 19,648 square feet in area and is
proposed to be a destination wedding and banquet facility. The commercial
alternation will allow a change of use for the building from a residential to commercial
classification. The property is zoned Town Center T3 (Suburban Zone) and the
proposed use is a permitted use.
Cross Seminole Trail- The Cross Seminole Trail has a missing link from Layer
Elementary to the west end of Old Sanford/Oviedo Road. Seminole County's planned
Informational 200 PAGE 1 OF 10-January 12,2015
connection will continue from the current terminus at Layer northerly adjacent to SR
419. IT will then turn under the power easement in unimproved City right-of-way,
cross the CSX railroad tracks and then connect to the existing trail end in the poser
easement. Additional property along SR 419 and Layer Elementary is being donated
by Bart Phillips to complete this section of the trail corridor that is needed. The
trail/railroad crossing agreement between Seminole County and the CSX was finally
approved on September 23, 2014 and funds for the construction of the crossing have
been remitted to CSX. The State can now certify that a viable corridor exists which
will allow the appraisals for the donated land to proceed. Once approved by the
Governor and Cabinet in the second quarter of 2015, the real estate closings should
occur in mid 2015. Seminole County has the trail construction plans complete and
they plan on proceeding with construction shortly after the land conveyances are
completed.
Dunkin Donuts - A site plan has been submitted for a proposed Dunkin Donuts with three
(3) associated retail areas. This project went to the Planning and Zoning Board in
November 2014 and was approved by the City Commission on December 8, 2014.
Grandeville at Town Center (The RiZE�—Construction of the proj ect has commenced. The
foundation permit is under staff review. Inspections are on-going. Staff is working with the
applicant to schedule a formal ground-breaking ceremony. The ground breaking ceremony
was held on October 29, 2014. The foundation permit for the buildings was issued on
September 26, 2014 and construction is underway. Permits for two of the apartment
buildings have been issued.
HaVes Road Plaza— The grand opening for the 7-11 was held on June 23, 2014. The sign
along SR 434 has been installed. Staff has negotiated for the finished exterior coating
for the rear six-foot wall to be applied, giving the wall a stucco finish. Additional
tenants are beginning to enter the permitting review process.
Jesup's Landing — Upon completion, this project will consist of 171 townhome in 30
buildings units on 17 acres of land located on the south side of Orange Avenue, behind
Winter Springs High School. The subject property is located in the T4 transect (General
Urban Zone) of the Town Center. As of July 12, 2013 five (5) buildings are in various
stages of construction representing approximately 30 units. A permit for the clubhouse has
been submitted. As of December 31, 2013, no additional permits have been issued. Units
are beginning to sell and six buildings are in various stages of construction. Staff is working
with the developer on various allowable advertisement methods. Construction on the
clubhouse and pool area is nearing completion. Six buildings are complete or nearing
completion and units are being sold. The developer has presented an option for a two-story
unit with the same architectural detailing. This option represents a minor aesthetic
modification as the buildings will look the same and have the same architectural detailing.
The proj ect layout remains exactly the same as approved. Twenty-Two (22) permits were
processed during the month of August. Construction on three (3) new buildings is on-
going. A permit application has been submitted for a seven (7) unit building. A permit
application has been submitted for a four (4) unit building.
Magnolia Park — The construction of the Magnolia Park Amphitheater is tied to the
Cross Seminole Trail property conveyances timeline with real estate closings
anticipated to be completed by mid 2015. The City plans on purchasing from the
State approximately 0.44 acres of trail right-of-way adjacent to the City property.
Informational 200 PAGE 2 OF 10-January 12,2015
This adjacent trail right-of-way is needed because the amphitheater building
encroaches into the State's trail right-of-way. The encroachment will allow maximum
utilization of this facility given the constraints of the site. The State Acquisition and
Restoration Council (ARC) unanimously approved the request at their February 14,
2014 meeting. The property has been preliminarily appraised at $106,000 and the
City Commission approved Resolution 2014-03 in April 2014 formalizing the City's
intent to purchase the property. It is anticipated that the conveyance will be to the
Governor and Council in the second quarter of 2015 and the real estate closings should
occur in mid 2015. Construction will begin shortly thereafter with a completion date
of March 2016.
Northern Oaks - Staff is in receipt of an application for annexation, rezoning, large-
scale future land use amendment and Preliminary Subdivision Plan for a 20.48 acre
parcel of land located on the north side of SR 434, approximately 1,000-feet east of SR
417. The applicant is proposing to rezone the property to R-1 (One-family dwelling
district) and designate of future land use of Low Density Residential in order to
develop a 49 unit single-family residential subdivision on the property. On January 7,
2015, the Planning & Zoning Board will consider the annexation, rezoning and future
land use amendments on the property. The PSP will be presented at a later date.
Pinch a PennV - A Final Engineering Plan and Aesthetic Review application has been
submitted for a 4,400 square foot building with a Pinch a Penny pool supply store and
additional retail space located on the northeast corner of the intersection of SR 434 and
Central Winds Parkway. This project was presented to the City Commission for final
approval in 2008 but was not constructed. Staff held a Development Review Committee
(DRC) meeting with the applicant on June 10, 2014 to address comments that were
generated. The plans are expected to be resubmitted soon. This item was unanimously
approved by the Planning & Zoning Board at the July 2, 2014 meeting. This item is
scheduled to be presented to the City Commission at the July 28, 2014 meeting. Final
engineering for this item was approved at the July 28, 2014 City Commission meeting. The
contractor has informed the City that the owner is considering changes to the building and
site engineering. Staff will provide updates as they become available. (This item will be
removed from the next update)
Plante Propertv (Tuskawilla Pointe� - Second reading and adoption of the future land use
amendment and rezoning ordinances as well as the pre-annexation agreement were
approved by the City Commission at their May 12, 2014 regular meeting. Resolution 2014-
10 will be presented to the City Commission on July 28, 2014 which proposes to ratify and
designate real property comprising part of the Plante property as a brownfield area,
consistent with Seminole County's findings when the property was in the County. The City
Commission designated a portion of this development as a brownfield area at the July 28,
2014 meeting. This brownfield area is the same as the one designated by Seminole County.
Staff has been advised that the buyer and seller have been in negotiations over language
involving the brownfield transfer. It is staff s understanding that these negotiations are
nearing an end and the project should be moving forward. The applicant is in the process
of vacating the paper roadway easements on the southern portion of the property.
Pollack Shores Apartments - Staff is in receipt of a preliminary site plan submittal for a
338 unit apartment complex located on the northeast corner of the intersection of SR 434
and Michael Blake Boulevard. This project is located within the TS (Urban Center Zone) of
the Town Center. The plan is currently under staff review. A Development Review
Informational 200 PAGE 3 OF 10-January 12,2015
Committee (DRC) meeting was held on April 22, 2014. As a result of this meeting, a plan
addressing staff s concerns will be re-submitted in the near future. The applicant has re-
submitted the preliminary site plan (PSP) which was reviewed by staff and scheduled for
the August 6, 2014 Planning & Zoning Board meeting and the August 25, 2014 City
Commission meeting. A community meeting was held with the developer on August 21,
2014. As a result of the community meeting, the developer considered certain modifications
to the plans based upon the suggestions that were generated from members of the public at
the community meeting. The PSP for the Pollock Shores apartment complex will be placed
on a future City Commission meeting. The date of that Commission meeting will be
determined at such time as City Staff is made aware these changes have been incorporated
into the design of the project. The Planning & Zoning Board unanimously recommended
approval of the Preliminary Site Plan (PSP) subject to the City Commission continuing the
project to a date certain to permit a workshop to be held with concerned citizens in order to
permit their concerns to be heard prior to the PSP being approved by the City Commission.
The applicant and concerned citizens met for a workshop on December 2, 2014 and
discussed the remaining design concerns related to the project. Based on the outcome of this
meeting, several design changes have been made to the project. The PSP, along with a
development agreement is currently scheduled to be presented to the City Commission
at their January 26, 2015 meeting.
Primrose School - Primrose School is a proposed daycare center on the commercial
parcel adj acent to the Heritage Park townhome development. Site work has
commenced. Construction continues on the building. Conditional site acceptance
was presented to the City Commission and approved at their December 8, 2014
meeting.
RaceTrac (former Hess station site� - Staff is working with the RaceTrac Company to
redevelop the abandoned Hess station site located at the intersection of SR 419 and
U.S. Highway 17-92. The project will involve the annexation of three (3) additional
parcels of land south of the existing site. The applicant has submitted an application
requesting the annexation, rezoning, and small-scale future land use map amendment
for three (3) parcels of land south of the former Hess gas station site. This application
requests annexation, rezoning of the parcels to City of Winter Springs C-2 (General
Commercial), and small-scale future land use amendment to City of Winter Springs
Commercial. These items will be presented to the Planning & Zoning Board on
February 6, 2013, and to the City Commission for first reading on February 25, 2013,
and second reading on March 11, 2013. On January 30, 2013, City Staff inet with
representatives of RaceTrac to discuss details of an Annexation Agreement which will
be presented to the City Commission for approval. On February 6, 2013, the Planning
& Zoning Board unanimously approved the Annexation, Small-Scale future land use
amendment, and Rezoning. These items will be presented to the City Commission for
first reading on February 25, 2013, and second reading on March 11, 2013. At the
February 25, 2013 meeting, the City Commission unanimously approved first reading
of the Annexation, Small-Scale Future Land Use Amendment and Rezoning request.
Second reading will be on March 11, 2013. At the March 11, 2013 meeting, the City
Commission unanimously approved second and final reading of the Annexation, Small-
Scale Future Land Use Amendment and Rezoning of the property. The applicant is
now going through staff review of the Final Engineering Plans and Aesthetic Review.
On March 28, 2013, the applicant resubmitted the Final Engineering Plans and
Aesthetic Review for review and approval. If all outstanding staff concerns are
satisfied, these items would be scheduled for the May 1, 2013 Planning & Zoning
Board meeting and, potentially, the May 13, 2013 City Commission meeting. Staff
review of the second submittal is currently on-going. The RaceTrac is tentatively
scheduled for the Planning and Zoning Board on May 1, 2012 and for the City
Informational 200 PAGE 4 OF 10-January 12,2015
Commission on May 13, 2013. The Planning & Zoning Board unanimously
recommended approval of the Final Engineering Plans and the Aesthetic Review at the
May 1, 2013 meeting. This item will be presented for consideration by the City
Commission approval at their May 13, 2013 meeting. The Final Engineering Plan and
Aesthetic Review were approved at the May 13, 2013 City Commission meeting. An
agenda item to approve Resolution 2013-11 to modify the City's off-premise sign
inventory to add the off-premise sign on the recently annexed property for the
RaceTrac facility will be considered by the Commission at their June 10, 2013 regular
meeting. Staff has been in contact with the project representative from RaceTrac.
RaceTrac intends to submit building plans in the fall and begin construction in the first
quarter of 2014. The representative of RaceTrac has contacted the City and would like
to meet with Staff in order to discuss potential revisions to the Final Engineering Plans.
On February 6, 2014, Staff inet with the representatives of RaceTrac to discuss minor
changes to the Final Engineering Plans. According to RaceTrac, construction is
anticipated to begin in the first quarter of 2015. Because of State regulations,
modification of the on-site billboard will occur prior to the RaceTrac construction. This
item has been reviewed and coordinated with the City Attorney. The applicant has
requested an extension of the approved Final Engineering Plan and Aesthetic Review.
These requests will be placed on the October 27, 2014 City Commission agenda. At the
October 27, 2014 meeting, the City Commission approved the extension of the Final
Engineering Plan and Aesthetic Review for eighteen (18) months. The property has
been cleaned up with the removal of the graffiti scheduled within a couple of weeks.
Seven Oaks (fka the Dittmer Property)— Staff is in preliminary discussions with the
engineer relative to a potential new proposal for this property. Staff has not received any
plans as of November 29, 2012. On January 3, 2013, staff inet with a potential developer of
the property. Staff has been working with an applicant to solidify an acceptable layout for
the property which meets the City's land use requirements. The project engineer has
indicated that the preliminary site plan should be submitted by March 8, 2013. As of March
14, 2013 staff has not received a preliminary site plan for this project. On March 27, 2013, a
Preliminary Subdivision Plan and PUD Master Plan amendment were submitted for staff
review. On April 9, 2013 a Development Review Committee (DRC) meeting was held with
the applicant to discuss the comments that were generated by staff for the first review of this
project. This item was unanimously approved by the Planning & Zoning Board at the May
1, 2013 meeting. The PUD master plan and preliminary subdivision plan will be presented
for the Commission's consideration at their May 13, 2013 meeting. The PUD master plan
and preliminary subdivision plan were approved at the May 13, 2013 City Commission
meeting. Final subdivision plans have been submitted and are under review. On July 2,
2013, a Development Review Committee (DRC) meeting was held with the applicant to
discuss the comments that were generated by staff for the Final Engineering Plans. The
Final Subdivision Plans and Aesthetic Review will be presented to the Planning & Zoning
Board at the August 14, 2013 meeting. The Final Subdivision Plans and the Aesthetic
Review were unanimously approved at the August 14, 2013 Planning & Zoning Board
meeting and were also approved by the City Commission at their August 26, 2013 meeting.
The applicant is in the process of preparing the Final Plat for submittal. The final plat has
been submitted and is currently under review. The Plat should be recorded later in October
2013 or November 2013. The final plat is scheduled to be presented to the City Commission
at the November 18, 2013 meeting. The final plat was approved at the November 18, 2013
City Commission meeting. The plat will be recorded in the Seminole County public records
at such time the City receives a bond from the developer for the coverage of infrastructure
improvements. Plans for the first model home are currently undergoing review by the
building division. The plat was recorded in the public records of Seminole County on
December 5, 2013. Construction on the entranceway wall has started. Permits for several
Informational 200 PAGE 5 OF 10-January 12,2015
homes in the development have been submitted for review. The permit for the model home
has been issued and permits for an additional eight (8) units have been submitted and
building department review is underway. Permits for additional units have been submitted
and are under review. Construction of the model home and entry wall/features is nearing
completion. A second home is now under construction. Approximately ten (10) permits
have been issued. Approximately eight (8) additional permits have been submitted for
review. Approximately three (3) additional permits have been submitted for review.
Approximately five (5) additional permits have been submitted for review. Eleven (11)
permits have been submitted for review in the past month. The developer is submitting a re-
plat to address issues with several lots adjacent to Boat Lake. Six (6) permits were
processed during the month of August. Five (5) additional permits have been processed as
of September 12, 2014. A re-plat for the expansion of lots 8-13 is currently under staff
review. Three (3) additional permits have been processed as of September 26, 2014. Three
(3) additional permits have been processed as of October 17, 2014. On November 11, 2014;
Veteran's Day, Meritage Homes gave a home in the Seven Oaks subdivision to a military
veteran. Three (3) additional permits have been processed as of November 24, 2014. Five
(5) additional permits have been processed as of December 30, 2014.
Southern Oaks (Weaver/Toledo properties)- American Land Investments of Central
Florida, LLC has submitted a Preliminary Subdivision Plan for Southern Oaks, a 92-
unit single-family residential subdivision that is proposed for construction on portions
of the Weaver and Toledo properties, and on portions of adjacent properties which are
located in the City of Oviedo. Of the 92-units, approximately 52 are proposed for
constructed in the City of Winter Springs. The proposed subdivision is approximately
55.55 acres, of which 33.27 acres are located in the City of Winter Springs. Staff is
currently in the process of reviewing the Preliminary Subdivision Plan. A Development
Review Committee (DRC) meeting is scheduled with the applicant on March 5, 2013
to discuss comments related to the submittal. On March 5, 2013, a Development
Review Committee (DRC) meeting was held with the applicant to discuss comments
related to the submittal. A revised Preliminary Subdivision Plan based on the outcome
of this meeting is anticipated to be submitted for review soon. As of March 29, 2013,
the revised Preliminary Subdivision Plan has not been resubmitted. The revised
Preliminary Subdivision Plan was submitted on April 10, 2013 for staff review. Staff is
working with the applicant to address staff review comments including the design of
the lots around the existing cell tower. As of May 3, 2013, the revised Preliminary
Subdivision Plan has not been submitted. The Preliminary Subdivision Plan and three
waiver requests are scheduled to be presented at the June 5, 2013 Planning & Zoning
Board meeting. At the June 5, 2013 meeting, the Planning & Zoning Board
unanimously approved the Preliminary Subdivision Plan and three waiver requests.
This item will be presented to the City Commission following approval of the
annexation of the Mermel property into the City. Since the applicant has requested a
continuance of second reading of the Mermel property to the August 26, 2013 City
Commission meeting, this item is scheduled to be presented to the City Commission
for approval at the August 26, 2013 meeting. The City Commission's consideration of
the annexation and the preliminary subdivision plan may need to be continued to a later
date dependant upon the date of the County's Commission's final actions relative to
Mermel property. Second reading of the Mermel property annexation as well as the
preliminary subdivision plan will be presented to the City Commission for
consideration at their September 9, 2013 meeting. The preliminary subdivision plan
and three associated waiver requests were approved at the September 9, 2013 City
Commission meeting. Final Engineering Plans will be submitted in the near future.
Staff inet during the week of January 6, 2014 to discuss proposed modifications to the
project's stormwater management system. The property has been sold to Taylor-
Morrison Homes of Florida. Final Engineering Plans are currently being prepared for
Informational 200 PAGE 6 OF 10-January 12,2015
submittal. Staff must negotiate a final agreement for the pond modification. This
agreement will be considered for approval by the City Commission at the March 10,
2014 meeting. The City Commission approved the northern pond modification
agreement at the March 10, 2014 meeting. Final Engineering Plans have been
submitted for review. Public hearing dates will be scheduled at such time all staff
review comments have been satisfied. A Development Review Committee (DRC)
meeting was held with the applicant on September 16, 2014. A resubmittal addressing
staff review comments is anticipated soon. The applicant has resubmitted the plans. A
City Commission date will be scheduled at such time staff comments have been
satisfied. A pre-application meeting was held with the developer on November 5,
2014 to discuss incorporating a property located to the east into the overall
development. Staff will provide updates as they are made available.
Starlight Baptist Church - Starlight Baptist Church has submitted a Final Engineering Plan
for an 18,158 square foot sanctuary building that will contain approximately 565 seats. The
Final Engineering Plan proposes additional paved and grass parking. The plan will be
presented to the Planning & Zoning Board on October 2, 2013 and to the City Commission
on October 14, 2013. At the October 2, 2013 Planning & Zoning Board meeting, the Final
Engineering Plan was unanimously approved. The applicant has requested this item be
considered by the City Commission at the October 28, 2013 meeting. At the October 28,
2013 City Commission meeting, the Final Engineering Plans were approved. At the
November 6, 2013 Planning & Zoning Board meeting, the Aesthetic Review was
unanimously recommended for approval. This item will be presented to the City
Commission at the November 18, 2013 meeting. The aesthetic review was approved at the
November 18, 2013 City Commission meeting. It is anticipated that construction of the new
sanctuary building will begin in the first quarter of 2014. Building plans are under review
by the Building Division. The sanctuary building is now under construction. Site
acceptance and the issuance of a certificate of occupancy is expected to occur in the
next several months. Staff continues to monitor the progress.
Town Center Phase I (previouslV referred to as JDC Calhoun I� — Staff continues to
monitor activity and to meet with potential occupants on vacant retail/office space within
Phase 1 of the Town Center. Quest Diagnostics has entered into a lease to be located in
Building 8 in the Town Center. Wendy's last day of operation will be June 30, 2012. Staff
has provided as-built drawings for the old Beef O'Brady's and Bijoux Jewelers locations for
use in working on an interior build-out plan for a new restaurant. No formal plans have been
submitted to the City. Quest Diagnostics is underway with an interior build-out in Building
# 8 (1132 East State Road 434). Completion of the Quest Diagnostics build-out is nearing
completion. Staff is discussing the location of a pizzeria/take out restaurant in the former
Uncle Al's location. Quest Diagnostics has received a Certificate of Completion. The build-
out for Mango Spice restaurant is currently under review. Mango Spice will have their
grand opening celebration on December 1, 2012. The owner of the Zoo Fitness Club has
submitted plans for expansion into the tenant spaces of the former Barnie's Coffee and
Cristiano's. Wine Styles has changed its name to "Spillovers." A new hair salon called iHair
has submitted an application for a sign permit. A tenant build-out has been submitted for
Eckel Engineering. This firm's activities are concentrated in the petroleum terminal and
pipeline industry. A tenant build-out has been submitted for South & York restaurant,
located in the former Hollywood Bistro space. Staff has received a building permit
submittal for an interior build-out for a GNC Nutrition Center. Staff conducted a
design "kick-off' meeting with our consultants of August 28, 2013. This design effort is
centered around the Market Square area of the Town Center. The Eckel Engineering offices
have opened for business. The South & York Restaurant has opened for business.
Informational 200 PAGE 7 OF 10-January 12,2015
Repainting of nine buildings in the Town Center is complete. Mikki V's restaurant is
currently completing renovations to the former Mango Spice restaurant tenant space.
According to the owner, an opening date of mid-May is scheduled. The Integrity Dance
Center is finalizing an interior build-out in the Town Center, Phase I. Mikki V's restaurant
has opened for business. According to the owner, a grand opening celebration is planned
soon on June 20th, 21 st, and 22nd, 2014.
Town Center Phase II— Staff inet with a potential developer for part of Phase II in late
March 2012. No plans or concepts have been submitted to date. Staff has provided
engineering information on Phase II of the Town Center to a potential developer but has not
received any development proposals as of February 28, 2013. On March 6, 2013, Staff is
meeting with a developer about a potential mixed use project for the Phase II property. Staff
met with a potential developer of the Phase II property on March 6, 2013. Staff continues to
field questions relative to the possible development of a portion of the Phase II property.
The owner has contacted the city relative to meeting in January 2014 about an apartment
development in Phase II. A pre-application meeting is scheduled for February 4, 2014 with
a potential developer of an apartment complex/mixed use development in Phase II of the
Town Center. A pre-application meeting was held on February 4, 2014 with a potential
developer of a proposed apartment complex in Phase II of the Town Center. Additional
information will be provided as it becomes available. A second pre-application meeting has
been requested by the potential developer of a proposed apartment complex on March 18,
2014. On March 18, 2014 a pre-application meeting was held with a potential developer of
an apartment complex on the northeast corner of the intersection of SR 434 and Michael
Blake Boulevard. The proposal is for 12 apartment buildings with a total of 342 units. A
submittal of a Conceptual Development plan is expected soon. A Conceptual Development
plan for 342 apartment units has been submitted for review under the working title "Pollack
Shores". A separate update has been created for this project.
The Greens at Tuskawilla - A building permit has been issued for the sales trailer. Permit
applications have been received for two buildings (8 units) in this development and have
proceeded through the first review. Comments have been issued and the applicant delivered
their response to comments on January 17, 2012. On January 25, 2012, the plat was
recorded in the public records of Seminole County. The building permit for the first 4-unit
building is ready for issuance as of February 12, 2012. Construction of the first building (4
townhome units) is underway. An official groundbreaking ceremony is scheduled for April
18, 2012 at 3:00 PM. The official groundbreaking ceremony was held on April 18, 2012 at
3:00 PM Construction on the townhome units continues. Final site acceptance is scheduled
for the Commission's June 25, 2012 meeting. On June 29, 2012, the developer submitted
building permits for the second building consisting of four (4) townhome units.
Construction of the second building is nearing completion. A Certificate of occupancy has
been issued for the second building. Staff has received a building permit for one additional
townhome building. A third building is under construction. A permit for a fourth building
has been issued. Permits for two additional buildings have been submitted and are under
review. Permit applications for five (5) additional units have been submitted and are under
review. Four (4) units are currently under construction. Permits for eight (8) additional
units have been submitted and are under review.
�nding Hollow O�ce Buildings - The final engineering and aesthetic review package for
this project were considered by the Planning and Zoning Board on April 3, 2013. This
meeting resulted in a recommendation of approval. The City Commission will consider the
final engineering and aesthetic review at their April 22, 2013 meeting. This item was
Informational 200 PAGE 8 OF 10-January 12,2015
approved at the April 22, 2013 City Commission meeting. Staff is awaiting the scheduling
of a pre-construction meeting. Staff held a pre-construction meeting with the applicant on
June 10, 2013. The plat is scheduled to be presented to the City Commission for final
approval at the July 22, 2013 meeting. Sitework construction commenced in June 2013 and
is expected to be in progress for the next several months. On July 21, 2013 a Lot Split
Application was submitted, by the same owner, for a 4 acre parcel located at the southeast
corner of S.R. 434 and Winding Hollow Boulevard. The applicant has preliminary indicated
verbally to Staff that the development of the east side Interior Lot would be used for single-
story offices as previously approved for property located on the west side of Winding
Hollow Boulevard. On July 10, 2013 the Planning & Zoning Board recommended approval
for The Offices at Winding Hollow Lot Split for property located on the southeast corner of
S.R. 434 and Winding Hollow Boulevard (Resolution 2013-25). This lot split was approved
by the City Commission non July 22, 2013. First reading of the administrative rezoning was
approved by the City Commission on August 12, 2013 and second reading will follow at a
later date after the adoption of the lot split resolution. The plat for the Offices at Winding
Hollow was recorded in the public records of Seminole County on September 6, 2013.
Vertical construction on the buildings has commenced. Staff is currently reviewing the first
iteration of the Final Engineering Plans and Aesthetic Review application for the east side
of Winding Hollow Boulevard. These items are scheduled for the December 4, 2013
Planning & Zoning Board meeting, and for final approval at the January 13, 2013 City
Commission meeting. On December 4, 2013 the Planning & Zoning Board unanimously
recommended approval of the final engineering and aesthetic review for the offices on the
east side of Winding Hollow Boulevard. This item will be presented to the City
Commission on January 13, 2014 for final approval. This item (east side) was unanimously
approved by the City Commission at the January 13, 2014 meeting. Building plans for the
east side have been submitted and are currently under review. The building plans for the
east side have been approved. Arbor penalty fines have been paid and Certificates of
Completion have been issued for the units along the west side of Winding Hollow
Boulevard. Building permit plans are under review for the three buildings proposed for the
east side of Winding Hollow Boulevard. Construction on these three buildings is anticipated
to begin soon. A pre-construction meeting was held on September 9, 2014. Construction is
anticipated to begin the week of September 15. The building permit was picked up by the
contractor on September 26, 2014. Construction is anticipated to commence soon.
Construction began on the east side of Winding Hollow Boulevard during the week of
October 13. Construction of the buildings located on the east side Winding Hollow
Boulevard continues.
Potential projects under discussion with sta�'f'— The following are items that have been
discussed with staff but are not formal applications for development at this time. Staff will
continue to advise the Commission on the status of the discussions:
. On October 9, 2014, a meeting was held between City Staff and a potential
developer of a 4-story, 144 suite Assisted Living Facility (ALF) located on State
Road 434 adjacent to the north side of the Cross Seminole Trail bridge. Staff will
present updates as they are available. The developer has been in contact with
City Staff with questions regarding impact fees and the impact of a
development agreement on the property.
. Staff inet with a potential developer on the ICI property. The proposal, as
currently presented, involves 100-plus apartments and 10 acres of commercial
along the SR 434 frontage.
Informational 200 PAGE 9 OF 10-January 12,2015
. Staff inet with a potential developer of an active adult concierge apartment
complex for residents that are 55 and up that is proposed for location at the
northwest corner of the intersection of Blumburg Boulevard and Tuscawilla
Road..
Economic Development Activities (Please be aware that some descriptions will be
abbreviated because of confidentiality agreements)
. Staff has initiated discussions with representatives of Expertus Labs and Katmai
Government Services relative to future developments within their companies.
FISCAL IMPACT:
There is no fiscal impact associated with this agenda item.
COMMUNICATION EFFORTS:
This Agenda Item has been electronically forwarded to the Mayor and City Commission,
City Manager, City Attorney/Staff, and is available on the City's Website, LaserFiche, and
the City's Server. Additionally, portions of this Agenda Item are typed verbatim on the
respective Meeting Agenda which has also been electronically forwarded to the individuals
noted above, and which is also available on the City's Website, LaserFiche, and the City's
Server; has been sent to applicable City Staff, Media/Press Representatives who have
requested Agendas/Agenda Item information, Homeowner's Associations/Representatives
on file with the City, and all individuals who have requested such information. This
information has also been posted outside City Hall, posted inside City Hall with additional
copies available for the General Public, and posted at five (5) different locations around the
City. Furthermore, this information is also available to any individual requestors. City Staff
is always willing to discuss this Agenda Item or any Agenda Item with any interested
individuals.
RECOMMENDATION:
Staff requests the City Commission receive and review the information provided in this
Agenda Item.