HomeMy WebLinkAbout2014 04 14 Consent 307 Pond Liner Repair ChangeCOMMISSION AGENDA
ITEM 307
REQUEST:
Informational
Consent
X
Public Hearings
Regular
April 14, 2014 KS KL
Regular Meeting City Manager Department
The Utility Department is requesting an increase to the authorization for the contract with
COMANCO Environmental Corporation of Plant City, Florida for the Repair of the
East Water Reclamation Facility (EWRF) Reject Pond Liner by $9,644.50 for a total cost
authorization of $117,351.00.
SYNOPSIS:
A contract for the repair of the reject pond liner at the EWRF was approved on December 9,
2013 by the City Commission at a cost of $97,915 plus 10% contingency. The contract
anticipated 100 holes /tears that would need repairs, however, 536 were actually
encountered. In addition, the volume of decaying algae and organics that needed to be
dewatered and removed from the pond was substantially higher than originally estimated.
An additional authorization of $9,644.50 is requested.
CONSIDERATIONS:
This work is needed to repair tears in the pond liner and stabilize berm erosion at the East
Water Reclamation Facility reject pond. The reject pond holds treated wastewater that has
not met rigid final effluent standards and needs to be retreated.
A contract for the repair of the reject pond liner at the EWRF was approved with
COMANCO Environmental Corporation on December 9, 2013 by the City Commission at a
cost of $97,915 plus 10% contingency. This was based on CPH Engineers, Inc. review
of proposals received from three vendors. COMANCO Environmental Corporation
submitted the lowest cost proposal to perform the work at a cost of $97,915.00. A 10%
contingency was authorized to address any additional unforeseen issues that could
Consent 307 PAGE 1 OF 3 - April 14, 2014
be discovered when the pond is drained
When the pond was drained for the first time since 1996, approximately 12" of muck like
material was discovered apparently from 18 years accumulation of decomposing algae,
duckweed, leaves, etc. Removal proved both time consuming and difficult taking about
four times longer than estimated in the proposals. Once the pond dewatering was complete
the repairs commenced and ultimately 536 repairs were performed, well in excess of the
100 estimated for the proposal scope of work.
The contractor has substantiated $19,436 of net costs for work in excess of the initial
contract scope of work amount of $97,915.00 for a total contract amount of
$117,351.00. $9,791.50 of this additional work would be authorized by the original 10%
contingency, however, $9,644.50 is beyond the original authorization and that is the basis
for this increased authorization request.
CPH has reviewed the claim for the additional work and has no objection. The budgeted
cost for this project in the Utility Enterprise Fund is $260,000.
FISCAL IMPACT:
The total contract cost after this additional work authorization request would be
$117,351.00. The project budget is $260,000. The budgeted funding sources are the Utility
Enterprise Fund (line code 3600- 62100).
COMMUNICATION EFFORTS:
This Agenda Item has been electronically forwarded to the Mayor and City Commission,
City Manager, City Attorney /Staff, and is available on the City's Website, LaserFiche, and
the City's Server. Additionally, portions of this Agenda Item are typed verbatim on the
respective Meeting Agenda which has also been electronically forwarded to the individuals
noted above, and which is also available on the City's Website, LaserFiche, and the City's
Server; has been sent to applicable City Staff, Media/Press Representatives who have
requested Agendas /Agenda Item information, Homeowner's Associations /Representatives
on file with the City, and all individuals who have requested such information. This
information has also been posted outside City Hall, posted inside City Hall with additional
copies available for the General Public, and posted at five (5) different locations around the
City. Furthermore, this information is also available to any individual requestors. City Staff
is always willing to discuss this Agenda Item or any Agenda Item with any interested
individuals.
RECOMMENDATION:
Staff recommends the Commission approve an increase to the authorization for
the contract with COMANCO Environmental Corporation of Plant City, Florida for
the Repair of the East Water Reclamation Facility (EWRF) Reject Pond Liner by $9,644.50
for a total cost authorization of $117,351.00 and authorize the City Manager and City
Attorney to prepare and execute any and all applicable documents.
ATTACHMENTS:
Consent 307 PAGE 2 OF 3 - April 14, 2014
1. CPH Additional Work Request Review (1 page)
2. Pond Liner Repair Photo (1 page)
Consent 307 PAGE 3 OF 3 - April 14, 2014
Kip Lockcuff
From: Zaudtke, Terry M. (P.E.) [tzaudtke @cphcorp.com]
Sent: Monday, March 31, 2014 3:33 PM
To: Kip Lockcuff
Subject: RE: Change Order Request from Comanco on the Pond Repair
Kip:
We have reviewed the attached change order request from Comanco.
The major changes were:
1) Liner bottom repairs. During the design phase, we did not dewater and clean the pond to perform a detailed
look at the liner to determine the number of repairs needed. We put an estimate of 100 holes, at one square
foot area per hole, that needed repair. Based on inspection of the bottom liner (after cleaning /removal of the
organic material), there were significantly more breaks (holes) in the liner than were estimated for bidding of
the project. Upon cleaning, the City determined that only the larger holes would be patched. Therefore, the City
stopped the contractor at the 536 figure shown in the Change Order request. Our review of the data received
from the contractor reveals that the actual materials (XR -3 Liner) purchased and installed by the contractor on
the project is greater than the materials claimed in the change order. The City has received more work
completed than has been claimed for as compensation by the contractor. In addition, excess material (XR -3) was
provided to the City for future use.
2) Dewatering /Site Prep. At the start of construction, it was discovered that the bottom of the pond was covered in
a thicker bed of liquid organic material then what we had estimated. It became evident that removal of this
organic material was going to be a greater endeavor than was originally anticipated. We found that the material
was too thick to flow by gravity to the pump suction line and that it had to be pushed to the suction pipe as well
as diluted with reclaimed water to get it to flow. The contractor submitted the actual labor hours and stipulated
that they used actual labor costs to determine the total cost for this item. We computed the average cost per
hour of labor (including all categories) is $32.80 per hour. The average cost for equipment was $59.12 per hour.
These are both reasonable and acceptable rates for this type of work and we agree that the time to perform the
task is correct based on visual observations of the number of personnel and time spent for this work.
3) Sod. No sod replacement was required. The credit is $4500.
Based on the information received by our offices, we have no objections to the change order as requested by the
contractor.
Terry M. Zaudtke, P.E., BCEE
CPH
Phone 407 - 425 -0452 x 2003
mill
41,
Will
Is
VAI 0 1,
nbm
dir •-- l
—ALI& 0% .Mp�
9w
r-- z m9kr
4h-
6
0
4e,
4L • All. r
Am�m
%6
TFIN
'bk
FL='
r16%
bL!
ti
mar-
30
<6
g.-
9
Ly }
--4r
—9