Loading...
HomeMy WebLinkAbout2014 02 24 Consent 301 Sewer Relining COMMISSION AGENDA     Informational Consent X ITEM301 Public Hearings Regular       February 24, 2014KSKL Regular MeetingCity ManagerDepartment         REQUEST: The Utility Department is requesting authorization to procure the services of Layne Inliner, LLC (fka Reynolds Inliner) to perform Sanitary Sewer Line Rehab Work by Piggybacking off of the City of Orlando Contract for Cured-in-Place Pipe rehabilitation.   SYNOPSIS: The purpose of this Agenda Item is to request authorization to piggyback off of the City of Orlando Contract No. BI09-2570 with Layne Inliner, LLC for relining of sanitary sewer lines at a cost of $180,845.00. CONSIDERATIONS: This project is needed for the on-going maintenance and rehabilitation of the City's sanitary sewer collection system.  The Utility Department budgets annually for sewer line rehabilitation. The Cured-in-Place process, a trenchless technology, is the preferred method of rehabilitating the sewer lines by the City.   The Cured-in-Place process is a folded, resin inpregnated fabric that is pulled through the existing sewer line and expanded and cured in place.  No excavating, digging or restoration is required which minimizes any inconvenience to our residents.    The amount of sanitary sewer mains we intend to rehab at this time are as follows: 2,376 feet of 8”, 239 feet of 10” and 625 feet of 15”. The cost for lining per lineal foot is $35.00 for 8”, $40.00 per lineal foot for 10” and $85.00 per lineal foot for 15”.   The total cost for this sanitary sewer rehabilitation project will be $180,845.00.  The locations are on David Street, South Edgemon Avenue, Moss Road, Wildwood Drive, and Howell Creek near the Greenbriar subdivision.  These pipes and structures average 35 years Consent 301 PAGE 1 OF 2 - February 24, 2014 old and are clay pipe which makes them subject to cracking and leaking. FISCAL IMPACT: The Utility Department has budgeted $200,000 in the Renewal and Replacement Fund for sewer and manhole relining for FY 2014.  The project cost of $180,845.00 will be paid from this fund.  Funds will be expended over the next 120 days. COMMUNICATION EFFORTS: This Agenda Item has been electronically forwarded to the Mayor and City Commission, City Manager, City Attorney/Staff, and is available on the City’s Website, LaserFiche, and the City’s Server. Additionally, portions of this Agenda Item are typed verbatim on the respective Meeting Agenda which has also been electronically forwarded to the individuals noted above, and which is also available on the City’s Website, LaserFiche, and the City’s Server; has been sent to applicable City Staff, eAlert/eCitizen Recipients, Media/Press Representatives who have requested Agendas/Agenda Item information, Homeowner’s Associations/Representatives on file with the City, and all individuals who have requested such information. This information has also been posted outside City Hall, posted inside City Hall with additional copies available for the General Public, and posted at five (5) different locations around the City. Furthermore, this information is also available to any individual requestors. City Staff is always willing to discuss this Agenda Item or any Agenda Item with any interested individuals.   In addition, residents in the affected areas will be notified prior to the work being performed. RECOMMENDATION: It is recommended that authorization be granted to piggyback off of the City of Orlando Contract No. BI09-2570 with Layne Inliner, LLC for the rehabilitation of sanitary sewer lines and manhole reconstruction at a cost of $180,845.00 plus a 10% contingency payable from the Utility Renewal and Replacement line code (3610-65000-30030). ATTACHMENTS: 1.  Sewer Relining Proposal (page 1 of 1) Consent 301 PAGE 2 OF 2 - February 24, 2014 Mr PROPOSAL January SUBMITTED TO: Clity of Winter Springs 1126 East .. . Winter Springs,FL 32708_ t_ -* Jason Tape c** Miguel Sanchez JOB LOCATION: Winter ri s Sanitary We propose hereby to furnish material and:labor-complete in accordance with specifications below,,for the surn of HundredOne i Thousand t Hundred Forty-flivedollars and no cents Payment terms- %within t upon completion and acceptance. All material is guaranteed to be as specified. All work to be completed in a work-manlikemanner according to standard practices, Any alteration or deViation from specifications below involving extra costs will he executed only upon written orders,and will become an extra charge over and al re the estimate, All agreements contingent upon strikes,accidents or delays beyond our control. Owner to carry tire;tornado and other necessary insurance. Our workers are fully covered by W ork an's Compensation insurance, Note; This proposal may be withdrawn by us i not accepted within thirt-y( 0)_d.ayfs. We hereby submit specifications and estimatesas follows. Layne nli er shall supply all equipment, materials and labor as follows- DESCRIPTION QTY UNIT PRICE TOTAL rn I*sh/In sty , Item#1--Furnish/Instal Location: Moss Road c orb r Item#4—Fu rn is nsta_ Location. t(Course Item#13— . TOTAL I $180,8i�_-00� . Proposal based on pricing contained in contract between Layne Inliner,LLC and the City of Orlando,Contract 2 . 2. The City of Winter Springs to provide access to all lines to be rehabilitated. . Inliner to be installed as per ASTM, manufacturer's specifications and contract specifications. 4. Lining subject to a re inspection a ne Inliner,LLC indicating the line conditions are acceptable or installation of Inliner. 5. All work performed does not include point repairs if required prior to installing nlner. 6. Layne nliner,LLC shall furnish the City of Winter Springs with a Final ins ection CD of the rehabilitated sewer lines. Signature 'To. e�rtso ,Acceptance of of Manager Proposal-`he above prices,specifications and conditions are satisfactory and are hereby accepted. You are authorized to do the work as specified. Payment will be made as outlined above. Date of acceptance Authorized Signature