HomeMy WebLinkAbout2009 08 14 Local Agency Program Supplemental Agreement525-010.32
PRODUCTION SUPPORT
02109
Page 1 of 3
SUPPLEMENTAL NO. STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION FPN
1 LOCAL AGENCY PROGRAM 426326 -1 -5801
DUNS NO. SUPPLEMENTAL CONTRACT NO.
80- 939 -7102 AGREEMENT APM94
The STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION & CITY OF WINTER SPRINGS desires to supplement the
original Agreement entered into and executed on August 14, 2009 as identified above. All provisions in the original
Agreement and supplements, if any, remain in effect except as expressly modified by this supplement.
The changes to the Agreement and supplements, if any, are described as follows:
PROJECT DESCRIPTION
Name Intersection Improvements Length 0.05 miles
Termini SR 434 and Haves Road
Description of Work:
Construction of a right turn, deceleration lane on eastbound SR434 at Hayes Road. The taper for the turn lane begins approximately
350 feet west of the Hayes Road center lane. The project includes the relocation of the existing sidewalk, drainage structures, and
sidewalk ramps with detectable warnings, signage, and pavement markings. The project length is 0.05 miles.
SPECIAL CONSIDERATIONS BY AGENCY:
Pursuant to Paragraph 4.0 of the Local Agency Program Agreement, the Agency and the Department acknowledge and agree that the
schedule of funding for construction that includes the authorized and encumbered federal funding for this American Recovery and
reinvestment Act (ARRA) project shall be increased to an amount equal to the Agency's construction contract award amount of
$141,996.00 plus the amount of the Agency's original CEI estimated amount of $21,035.72, for a total amount of $163,033.72. Said
revision is reflected on the Schedule of Funding, attached hereto and incorporated herein, as Exhibit "A
r
525-010 -32
PRODUCTION SUPPORT
02M
Page 2 ot 3
SUPPLEMENTAL NO. STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION FPN
1 LOCAL AGENCY PROGRAM 426326 -1 -5801
SUPPLEMENTAL
DUNS NO. AGREEMENT CONTRACT NO.
80- 939 -7102 APM94
TYPE OF WORK
By Fiscal Year
FUNDING
(t)
PREVIOUS TOTAL
PROJECT FUNDS
(2)
ADDITIONAL
PROJECT FUNDS
(3)
CURRENT TOTAL
PROJECT FUNDS
(4)
TOTAL AGENCY
FUNDS
(5)
TOTAL STATE &
FEDERAL FUNDS
Planning
2007 -2008
2008 -2009
2009 -2010
2010 -2011
Total Planning Cost
$0.00
$0.00
$0.00
$0.00
$0.00
Project Development &
Environment (PD &E)
2007 -2008
2008 -2009
2009 -2010
2010 -2011
Total PD&E Cost
$0.00
$0.00
$0.00
$0.00
$0.00
Design
2007 -2008
2008 -2009
2009 -2010
2010 -2011
Total Design Cost
$0.00
$0.00
$0.00
$0.00
$0.00
Right -of -Way
2007 -2008
2008 -2009
2009 -2010
2010 -2011
Total Right -of -Way Cost
$0.00
$0.00
$0.00
$0.00
$0.00
Construction
2007 -2008
2008 -2009
2009 -2010
2010 -2011
Total Construction Cost
$125.000.00
$16.998.00
$141.998.00
$141,998.00
$141.998.00
$125,000.00
$16,998.00
$141,998.00
$141,998.00
$141,998.00
Construction Engineering and
Inspection (CEI)
2007 -2008
2008 -2009
2009 -2010
2010 -2011
Total CEI Cost
Total Construction & CEI Costs
$21.036.00
$21.036.00
$21.036.00
$21.036.00
$0.00
$21,036.00
$21,036.00
$21,036.00
$21,036.00
$125,000.00
$38,034.00
$163,034.00
$163,034.00
$163,034.00
TOTAL COST OF THE
PROJECT
$126,000.00
$38,034.00
$163,034.00
$163,034.00
$163,034.00
Project was awarded @$141,998 for construction and $21,035 for CEI. Total cost is $163,034. Additional $35,034 will De aaaea trom 426330- 2 -515U1.
i
i
52"10.32
PRODUCTION SUPPORT
02/09
Page 3 of 3
SUPPLEMENTAL NO. STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION FPN
1 LOCAL AGENCY PROGRAM 426326 -1 -5801
SUPPLEMENTAL
DUNS NO. AGREEMENT CONTRACT NO.
80-939 -7102 APM94
IN WITNESS WHEREOF, the parties have caused these presents to be executed the day and year first above written.
AGENCY CITY OF WINTER SPRINGS
By:
Na' Kev Smith
Title: City Manager
Attest:
Joss. L. Brown
fje:
Depulty City Clerk
Dsie: 11/24/0"9
form:
As to
Attorney Ant ony A. Garganese
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION
By:
Name: Rise' K. Wall
Title: Director of Transportation Support
Attest:
Name:
Title:
Date:
As to form:
District Attorney
See attached Encumbrance Form for date of funding approval by Comptroller.
61
i
CITY OF WINTER SPRINGS
PUBLIC WORKS DEPARTMENT
1126 STATE ROAD 434
WINTER SPRINGS, FL 3270> CEIVIE ,
407 - 327 -7597
FAX:407- 327 -6695 Nov 19 2009
7!,,. T :Jr WINTER SPRINGS
nc THE CIT V CLERK
MEMORANDUM
TO: City Clerk's Office *Q�A-
FROM: Brian Fields, City Engineer P I
DATE: November 19, 2009
SUBJ: FDOT Local Agency Program Supplemental Agreement — SR 434 and
Hayes Road
Please request that the City Manager sign all three copies of the enclosed
agreement, along with one witness signature and the City Attorney's signature.
The signature page is on page 3. Please return all three copies to me and I will
forward them to FDOT for their signatures. FDOT will return one fully executed
copy to the City.
Please try to have these documents signed by November 24, 2009.
Authorization to enter into the LAP Agreement was approved by the City
Commission at the May 26, 2009 meeting, consent item #201. This amendment
increases the dollar amount of the agreement based on the actual costs of the
work.