HomeMy WebLinkAbout2013 03 25 Consent 200 CDBG - North Village Sidewalks ProjectCOMMISSION AGENDA
ITEM 200
March 25, 2013
Regular Meeting
Informational
Consent
X
Public Hearings
Regular
KS
KL
City Manager Department
REQUEST:
The Public Works Department requesting authorization to enter into a contract agreement
with CM Engineering Services Florida, PLLC for construction of the North Village Walk
Sidewalk Improvements (ITB #001/13/BF) in the amount of $239,145.89 plus a
contingency of $10,854.11, for a total authorization of $250,000.
SYNOPSIS:
The North Village Walk Sidewalk Improvements Project consists of the installation of
approximately two miles of new 5 -foot wide sidewalks along existing City streets generally
located north of S.R. 434, east of Sheoah Blvd., and west of Moss Road. The construction
is funded entirely by a Community Development Block Grant administered through
Seminole County. This agenda item is for the award of the construction contract to CM
Engineering Services. Construction is expected to begin in April and be complete in July.
CONSIDERATIONS:
The North Village Walk Sidewalk Improvements consists of the installation of
approximately two miles of new 5 -foot wide sidewalks along existing City streets generally
located north of S.R. 434, east of Sheoah Blvd., and west of Moss Road (see Exhibit A for
the project map).
At the January 14, 2013 City Commission meeting, the Commission approved entering into
an agreement with Seminole County for Community Development Block Grant (CDBG)
funding of up to $250,000 for construction of the North Village Walk Sidewalk
Improvements. The Seminole County Board of County Commissioners approved the
Consent 200 PAGE 1 OF 4 - March 25, 2013
agreement at their February 26, 2013 meeting.
The North Village Walk Sidewalk Project is in the 5 -year Capital Improvements Plan
(CIP) that was adopted by the City Commission at the September 24, 2012 City
Commission meeting. At the February 28, 2011 City Commission meeting, Staff informed
the Commission (Informational Agenda Item #103) of the intent to apply for a Community
Development Block Grant (CDBG) for the North Village Walk Sidewalk Project. The
project location is within Census Tract 214.01 Block Group 2, which is eligible for CDBG
funding.
In addition to being in the approved CIP, the project was recommended by the Bicycle and
Pedestrian Advisory Committee (BPAC) in February 2011 as a high priority project in
BPAC's adopted Inventory of Sidewalk Gaps with Priority Project Ranking. In March
2011, the Planning and Zoning Board adopted a City -wide Pedestrian Plan which included
the North Village Walk Sidewalk Project as priority #1B, with #1A being a sidewalk project
in the Winter Springs Town Center. The North Village Walk Sidewalk Project is also on
the current Metroplan Orlando Prioritized Project List for Bicycle and Pedestrian Projects.
The project divides the new sidewalks into three priority areas, with the first priority area
(Base Bid) being the installation of sidewalks along one side of the streets that currently
have no sidewalks (see Exhibit A). These streets include:
• North Cortez Avenue
• North 1st Street (north side)
• Algiers Avenue
• North 1st Court
• North 2nd Street
• North Devon Avenue
• North Fairfax Avenue
• North 3rd Street from Edgemon to Fairfax
The second priority (Alternate Bid Item #1) is the installation of new sidewalks along Moss
Road, a collector road, to provide sidewalks on both sides where there is currently a
sidewalk only on one side. The third priority (Alternate Bid Item #2) is the installation of
sidewalks along the south side of 1st Street to provide sidewalks along both sides of this
east -west corridor.
Based on the bid prices of the lowest bidder, CM Engineering Services, Staff is
recommending awarding a contract for the completion of all three priority areas in the total
amount of $239,145.89, which is below the total CDBG construction grant amount of
$250,000.
A Public Meeting was conducted on February 4, 2013 at City Hall. All property owners in
the immediate vicinity of the project (including all abutting properties) were mailed a
meeting notice. The purpose of the meeting was to introduce the project, collect input,
answer questions, and establish lines of communication. The presentation from the Public
Meeting is posted on the City's website, along with a project informational flyer. Written
construction notices will be issued to all residents in the construction areas approximately
one week before construction is scheduled to begin, and regular project updates will be
posted on the City website.
The North Village Walk Sidewalk Improvements project was advertised for bidding
Consent 200 PAGE 2 OF 4 - March 25, 2013
on February 17, 2013 (see Exhibit B). Bids were received and publicly opened on March
14, 2013 with results as follows:
Invitation to Bid #001 /13 /BF Bid Results:
Bidder
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
1. CM Engineering Services
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
2. Sparks Concrete
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3. AJC Construction
......................................................................................................................................... ...............................
4. LAS Contracting
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
5. Triple Crown Construction
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
6. Stage Door II
......................................................................................................................................... ...............................
7. MVB & Associates
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
8. APEC
Total Bid Amount
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
$239,145.89
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
$311,275.26
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
$318,246.00
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
$327,868.50
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
$348,000.50
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
$351,798.30
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
$384,239.50
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
$428,463.00
A copy of the complete Bid Tabulation is attached as Exhibit C. Staffs estimated cost of
construction was $250,000.
Staff met with the president of CM Engineering Services on March 14, 2013 to review
several items related to the bid, including the proposed schedule, available manpower and
equipment, approach to the project, and recent experience with similar projects. Based on
Staffs review of CM Engineering Services' bid and follow -up research, Staff is
recommending award of this construction contract to CM Engineering Services.
Construction is expected to begin in early April 2013 and be completed in July 2013.
FISCAL IMPACT:
The project cost is $239,145.89 plus a contingency in the amount of $10,854.11, for a total
of $250,000, funded by a Community Development Block Grant (CDBG) with Seminole
County.
COMMUNICATION EFFORTS:
This Agenda Item has been electronically forwarded to the Mayor and City Commission,
City Manager, City Attorney /Staff, and is available on the City's Website, LaserFiche, and
the City's Server. Additionally, portions of this Agenda Item are typed verbatim on the
respective Meeting Agenda which has also been electronically forwarded to the individuals
noted above, and which is also available on the City's Website, LaserFiche, and the City's
Server; has been sent to applicable City Staff, Media/Press Representatives who have
requested Agendas /Agenda Item information, Homeowner's Associations /Representatives
on file with the City, and all individuals who have requested such information. This
information has also been posted outside City Hall, posted inside City Hall with additional
copies available for the General Public, and posted at five (5) different locations around the
City. Furthermore, this information is also available to any individual requestors. City Staff
is always willing to discuss this Agenda Item or any Agenda Item with any interested
individuals.
Written construction notices will be issued to all residents in the affected construction areas
Consent 200 PAGE 3 OF 4 - March 25, 2013
approximately one week before construction is scheduled to begin.
RECOMMENDATION:
Staff recommends the City Commission approve the award of the North Village Walk
Sidewalk Improvements project to the low bidder, CM Engineering Services, in the amount
of $239,145.89 plus a $10,854.11 contingency, and authorize the City Manager and City
Attorney to prepare and execute any and all applicable documents.
ATTACHMENTS:
1. Exhibit A - Project Map (1 page)
2. Exhibit B - Legal Advertisement (1 page)
3. Exhibit C - Bid Tabulation (1 page)
Consent 200 PAGE 4 OF 4 - March 25, 2013
EXHIBIT A
Proposed Sidewalk Map
Proposed Sidewalk One Side - Priority 1 (6,916 LF)
Proposed Sidewalk Second Side - Priority 2 (1,640 LF)
Proposed Sidewalk Second Side - Priority 3 (1,153 LF)
Existing Sidewalk on One or Both Sides
0 150 300
600
900
1,200
Feet
EXHIBIT B Orlando Sentinel
City Of Winter Springs
1126 E STATE ROAD 434
WINTER SPRINGS, FL 32708-2715
Before the undersigned authority personally appeared Pam L.
Davis/Tamela Vargas/Deborah M. Toney, who on oath says that s/he
is the Legal Advertising Representative of Orlando Sentinel, a daily
newspaper published in Seminole County, Florida; that the attached
copy of advertisement, being a Advertisement for Bid in the matter
of Bid No. ITB 001/13/BF in the Seminole County , was published
in said newspaper in the issue(s); of
02/17/13
Affiant further says that the said Orlando Sentinel is a newspaper
published in said Seminole County, Florida, and that the said
newspaper has heretofore been continuously published in said
Seminole County, Florida, each week day and has been entered as
second-class mail matter at the post office in said Seminole County,
Florida, for a period of one year next preceding the first publication
of the attached copy of advertisement; and affiant further says that
s/he has neither paid nor promised any person, firm or corporation
any discount, rebate, commission or refund for the purpose of
securing this advertisement for publication in the said newspaper.
foregoing was acknowledged before me this
day of February, 2013, • Pam L. Davis/Tamela
Vargas/Deborah M. Toney, who is personally known to me and who
did take an oath.
1224688
t,lcDTAF,',Y PUBUQ.
OF FLOPa-V:
INVITATION TO BID
Bid Proposals. are hereby solicited by the City
NaliTVIIIH1ftltriallfilksAlr°ii11111111174.11(
IMPROVEMENTS
Bid No. ITB 001/13/BF
Sealed Bids must be received by March 14, 2013
at 10:00 A.M. at the City of Winter Springs, City
Hall, 1126 East S.R. 434,-Wintet Springs, FL 32708
The Bidding Documents may be down-
loaded in pdf format from the City's
website at the following link:
http://www.winterseringsfl.org/EN/
webigov/bids_purcliasing.htm
This construction project consists of
the installation of approximately 10,000
LF, of new 5-foot wide sidewalks in the
North Village',Walk- area -of-Winter
Springs, north of S.R. 434+between She-
oah Blvd and Moss Road. Work in-
cludes clearing, grading, sidewalk con-
struction, curb ramps, concrete drive-
. way aprons, and restoration,. The esti
mated total construction cost is
$250;000.
-A mandatory pre-bid meeting will be
held on March 5, 2013 at 10:00 AM at
the City of Winter Springs, 1126 East
S.R. 434, Winter Springs, FL 32708,
_Contractors must have a representa-
tive at the pre-bid meeting to be eligi
ble to bid the project.
All questions regordind the bid should
be directed to Brian Fields, P.E., City
Engineer, at 407:327;7597 or by e-mail
to bfields@vvinterspringsfl.org.
. * '
EXHIBIT C
BID TABULATION
TOTAL (BASE BID PLUS ALTERNATE 1 AND ALTERNATE 2):
$239,145.89
$311,275.26
$318,246.00
$327,868.50
$348,000.50
$351,798.30
$384,239.50
$428,463.00
CM Engineering Services
Inc.
Sparks Concrete
AJC Construction
LAS Contracting
Triple Crown
Construction
Stage Door II
MVB and Associates
APEC
Pay
Item
Description
Unit
Unit
Price
Quantity
Unit Price
Total
Unit Price
Total
Unit Price
Total
Unit Price
Total
Unit Price
Total
Unit Price
Total
Unit Price
Total
Unit Price
Total
Base Bid
1
Mobilization
LS
1
$9,000.00
$9,000.00
$1,200.00
$1,200.00
$9,238.00
$9,238.00
$11,000.00
$11,000.00
$1,000.00
$1,000.00
$5,000.00
$5,000.00
$10,397.00
$10,397.00
$23,650.00
$23,650.00
2
Erosion Control
LS
1
$800.00
$800.00
$1,000.00
$1,000.00
$2,400.00
$2,400.00
$2,500.00
$2,500.00
$4,000.00
$4,000.00
$5,000.00
$5,000.00
$2,431.00
$2,431.00
$5,000.00
$5,000.00
3
Clearing and Grubbing
LS
1
$7,500.00
$7,500.00
$1,200.00
$1,200.00
$6,000.00
$6,000.00
$5,000.00
$5,000.00
$10,000.00
$10,000.00
$10,000.00
$10,000.00
$1,186.00
$1,186.00
$25,000.00
$25,000.00
4
Earthwork
LS
1
$6,300.00
$6,300.00
$1,150.00
$1,150.00
$6,000.00
$6,000.00
$12,000.00
$12,000.00
$21,075.00
$21,075.00
$5,000.00
$5,000.00
$47,203.00
$47,203.00
$25,000.00
$25,000.00
5
Concrete Sidewalk - 5 -feet wide, 4- inches thick
SY
4215
$21.50
$90,622.50
$27.42
$115,575.30
$27.00
$113,805.00
$27.50
$115,912.50
$24.00
$101,160.00
$31.00
$130,665.00
$28.50
$120,127.50
$29.00
$122,235.00
6
6" Thick Concrete Sidewalk and Driveway Aprons
SY
1254
$26.00
$32,604.00
$28.00
$35,112.00
$30.00
$37,620.00
$33.00
$41,382.00
$28.50
$35,739.00
$34.00
$42,636.00
$35.50
$44,517.00
$35.00
$43,890.00
7
Replacement of Miami Curb at Sidewalk Connections
EA
44
$20.00
$880.00
$40.00
$1,760.00
$120.00
$5,280.00
$250.00
$11,000.00
$630.00
$27,720.00
$400.00
$17,600.00
$231.00
$10,164.00
$30.00
$1,320.00
8
ADA Mats at Curb Ramps
EA
50
$200.00
$10,000.00
$950.00
$47,500.00
$396.00
$19,800.00
$250.00
$12,500.00
$250.00
$12,500.00
$350.00
$17,500.00
$297.00
$14,850.00
$750.00
$37,500.00
9
12" White Thermoplastic Crosswalk Striping: 6' lines at 3' o.c.
LF
1135
$2.09
$2,372.15
$3.00
$3,405.00
$2.00
$2,270.00
$4.00
$4,540.00
$4.00
$4,540.00
$2.10
$2,383.50
$14.50
$16,457.50
$4.00
$4,540.00
10
24" White Thermoplastic Striping - Stop Bars
LF
152
$5.34
$811.68
$16.00
$2,432.00
$6.00
$912.00
$7.00
$1,064.00
$10.00
$1,520.00
$5.50
$836.00
$18.00
$2,736.00
$8.00
$1,216.00
11
Tree Removal
EA
2
$200.00
$400.00
$200.00
$400.00
$1,500.00
$3,000.00
$400.00
$800.00
$800.00
$1,600.00
$1,500.00
$3,000.00
$1,190.00
$2,380.00
$150.00
$300.00
12A
Bahia Sod
SY
6210
$1.50
$9,315.00
$2.50
$15,525.00
$3.50
$21,735.00
$3.00
$18,630.00
$3.25
$20,182.50
$2.50
$15,525.00
$2.15
$13,351.50
$3.00
$18,630.00
12B
St. Augustine Sod
SY
200
$2.32
$464.00
$4.00
$800.00
$4.00
$800.00
$4.50
$900.00
$4.25
$850.00
$3.00
$600.00
$5.00
$1,000.00
$7.00
$1,400.00
13
Install Pedestrian Warning Signs
EA
20
$226.00
$4,520.00
$65.00
$1,300.00
$300.00
$6,000.00
$275.00
$5,500.00
$250.00
$5,000.00
$250.00
$5,000.00
$145.00
$2,900.00
$250.00
$5,000.00
14
Relocate Sign Post
EA
2
$75.00
$150.00
$50.00
$100.00
$120.00
$240.00
$100.00
$200.00
$300.00
$600.00
$100.00
$200.00
$180.00
$360.00
$110.00
$220.00
15
Install Miami Curb - Bombay Ave at 1st St
LF
75
$28.00
$2,100.00
$25.00
$1,875.00
$24.00
$1,800.00
$18.00
$1,350.00
$20.00
$1,500.00
$20.00
$1,500.00
$24.00
$1,800.00
$18.00
$1,350.00
16
Testing Allowance
LS
1
$3,000.00
$3,000.00
$3,000.00
$3,000.00
$3,000.00
$3,000.00
$3,000.00
$3,000.00
$3,000.00
$3,000.00
$3,000.00
$3,000.00
$3,000.00
$3,000.00
$3,000.00
$3,000.00
1 $319,251.001
TOTAL BASE BID (Subtotal Items 1 -16):
1 $180,839.33
1 $233,334.30
1 $239,900.00
1 $247,278.50
1 $251,986.50
1 $265,445.50
1 $294,860.50
Alternate Bid #1 (North Moss Road - Fill Gaps on West Side)
17
Erosion Control
LS
1
$300.00
$300.00
$1,000.00
$1,000.00
$1,200.00
$1,200.00
$500.00
$500.00
$2,000.00
$2,000.00
$2,000.00
$2,000.00
$490.00
$490.00
$5,000.00
$5,000.00
18
Clearing and Grubbing
LS
1
$3,000.00
$3,000.00
$975.00
$975.00
$1,200.00
$1,200.00
$1,500.00
$1,500.00
$3,500.00
$3,500.00
$2,000.00
$2,000.00
$240.00
$240.00
$5,000.00
$5,000.00
19
Earthwork
LS
1
$1,800.00
$1,800.00
$950.00
$950.00
$1,800.00
$1,800.00
$3,000.00
$3,000.00
$6,200.00
$6,200.00
$2,000.00
$2,000.00
$9,450.00
$9,450.00
$5,000.00
$5,000.00
20
Concrete Sidewalk - 5 -feet wide, 4- inches thick
SY
869
$21.50
$18,683.50
$27.42
$23,827.98
$27.00
$23,463.00
$29.00
$25,201.00
$24.00
$20,856.00
$31.00
$26,939.00
$28.50
$24,766.50
$29.00
$25,201.00
21
6" Thick Concrete Sidewalk and Driveway Aprons
SY
245
$26.00
$6,370.00
$28.00
$6,860.00
$30.00
$7,350.00
$34.00
$8,330.00
$30.00
$7,350.00
$34.00
$8,330.00
$35.50
$8,697.50
$40.00
$9,800.00
22
12" White Thermoplastic Crosswalk Striping: 6' lines at 3' o.c.
LF
108
$2.09
$225.72
$3.00
$324.00
$2.00
$216.00
$5.00
$540.00
$4.00
$432.00
$2.10
$226.80
$14.50
$1,566.00
$5.00
$540.00
23
24" White Thermoplastic Striping - Stop Bars
LF
26
$5.34
$138.84
$16.00
$416.00
$7.00
$182.00
$8.00
$208.00
$10.00
$260.00
$5.50
$143.00
$18.00
$468.00
$10.00
$260.00
24
ADA Mats at Curb Ramps
EA
6
$200.00
$1,200.00
$950.00
$5,700.00
$432.00
$2,592.00
$275.00
$1,650.00
$250.00
$1,500.00
$350.00
$2,100.00
$297.00
$1,782.00
$750.00
$4,500.00
25A
Bahia Sod
SY
1000
$1.50
$1,500.00
$2.50
$2,500.00
$4.00
$4,000.00
$3.00
$3,000.00
$4.50
$4,500.00
$2.50
$2,500.00
$2.15
$2,150.00
$3.00
$3,000.00
25B
St. Augustine Sod
SY
500
$2.32
$1,160.00
$4.00
$2,000.00
$4.00
$2,000.00
$4.50
$2,250.00
$5.00
$2,500.00
$3.00
$1,500.00
$5.00
$2,500.00
$7.00
$3,500.00
TOTAL ALTERNATE BID #1 (Subtotal Items 17 -25):
1 $34,378.06
I
1 $44,552.98 I
1 $44,003.00
I
1 $46,179.00
I
1 $49,098.00
I
1 $47,738.80
I
1 $52,110.00
I
1 $61,801.00 I
Alternate Bid #2 (1st Street, Fill Gaps on South Side)
26
Erosion Control
LS
1
$200.00
$200.00
$1,000.00
$1,000.00
$1,200.00
$1,200.00
$400.00
$400.00
$2,000.00
$2,000.00
$2,000.00
$2,000.00
$390.00
$390.00
$5,000.00
$5,000.00
27
Clearing and Grubbing
LS
1
$1,400.00
$1,400.00
$975.00
$975.00
$1,200.00
$1,200.00
$1,000.00
$1,000.00
$3,500.00
$3,500.00
$2,000.00
$2,000.00
$190.00
$190.00
$5,000.00
$5,000.00
28
Earthwork
LS
1
$1,160.00
$1,160.00
$950.00
$950.00
$1,800.00
$1,800.00
$2,500.00
$2,500.00
$7,000.00
$7,000.00
$2,000.00
$2,000.00
$7,510.00
$7,510.00
$5,000.00
$5,000.00
29
Concrete Sidewalk - 5 -feet wide, 4- inches thick
SY
869
$21.50
$18,683.50
$27.42
$23,827.98
$27.00
$23,463.00
$29.00
$25,201.00
$29.00
$25,201.00
$31.00
$26,939.00
$28.50
$24,766.50
$29.00
$25,201.00
30
Replacement of Miami Curb at Sidewalk Connections
EA
4
$20.00
$80.00
$40.00
$160.00
$120.00
$480.00
$250.00
$1,000.00
$800.00
$3,200.00
$400.00
$1,600.00
$231.00
$924.00
$250.00
$1,000.00
31
ADA Mats at Curb Ramps
EA
4
$200.00
$800.00
$950.00
$3,800.00
$480.00
$1,920.00
$275.00
$1,100.00
$300.00
$1,200.00
$350.00
$1,400.00
$297.00
$1,188.00
$750.00
$3,000.00
32
Bahia Sod
SY
1070
$1.50
$1,605.00
$2.50
$2,675.00
$4.00
$4,280.00
$3.00
$3,210.00
$4.50
$4,815.00
$2.50
$2,675.00
$2.15
$2,300.50
$3.00
$3,210.00
TOTAL ALTERNATE BID #2 (Subtotal Items 26 -32):
1 $23,928.50
I
1 $33,387.98 I
1 $34,343.00
I
1 $34,411.00
I
1 $46,916.00
I
1 $38,614.00
I
1 $37,269.00
I
1 $47,411.00 I
TOTAL (BASE BID PLUS ALTERNATE 1 AND ALTERNATE 2):
$239,145.89
$311,275.26
$318,246.00
$327,868.50
$348,000.50
$351,798.30
$384,239.50
$428,463.00