Loading...
HomeMy WebLinkAbout2012 05 01 PARAC - 602 Parks Assessment-EquipmentPARKS AND RECREATION ADVISORY COMMITTEE AGENDA ITEM 602 Mal 2012 Regular Meeting REQUEST: Informational Consent Public Hearings Regular X Mgr. / Authorization Dept. The Parks And Recreation Department Is Requesting The Parks And Recreation Advisory Committee Receive Information Related To The Parks Equipment And Assessment Of Playground Equipment For Trotwood Park. The Parks And Recreation Advisory Committee Is Requested To Provide Staff With Any Remarks They May Have. ATTACHMENT(S): A. Sample Park Plan Park Name Location Playground Equip Mfg Playgrounds Trotwood Park Game Time Age 2 -5 playground Small playground with slide 2 Bay Swing Set, 4 bucket swings Age 5 -12 playground Multi Level playground with slides 2 Bay Swing Set, 2 belt swings, 1 ADA swing Amenities Current Condition Bathrooms Good Pavilions Fair Baseball fields Poor Basketball Courts Fair Tennis Courts Poor Future Improvements: Upgrade all toilets to have automatic flush valves Improve lighting inside and out Clean and repaint all pavilions Add clay to help with drainage Install sprinklers on field #2 Install new rims and nets Resurface Install new fencing Playground Surfacing Conditon Surfacing Condition Replace in Comments Good mulch fair Equip- Add mulch when needed 8 yrs Good mulch Fair Equip- Add mulch when needed 8 yrs Costs 4 Flush Valves x $400 each = $1600 4 Safety lights = $400 2 loads of clay x $600 per load = $1200 $500 � . ; �v r •rte, ...:��.:: Winter Springs Parks and Recreation .�