HomeMy WebLinkAbout2012 05 01 PARAC - 602 Parks Assessment-EquipmentPARKS AND RECREATION
ADVISORY COMMITTEE
AGENDA
ITEM 602
Mal 2012
Regular Meeting
REQUEST:
Informational
Consent
Public Hearings
Regular X
Mgr. /
Authorization
Dept.
The Parks And Recreation Department Is Requesting The Parks And Recreation Advisory
Committee Receive Information Related To The Parks Equipment And Assessment Of
Playground Equipment For Trotwood Park. The Parks And Recreation Advisory Committee Is
Requested To Provide Staff With Any Remarks They May Have.
ATTACHMENT(S):
A. Sample Park Plan
Park Name Location Playground Equip Mfg Playgrounds
Trotwood Park Game Time Age 2 -5 playground
Small playground with slide
2 Bay Swing Set, 4 bucket swings
Age 5 -12 playground
Multi Level playground with slides
2 Bay Swing Set, 2 belt swings, 1 ADA swing
Amenities Current Condition
Bathrooms Good
Pavilions Fair
Baseball fields Poor
Basketball Courts Fair
Tennis Courts Poor
Future Improvements:
Upgrade all toilets to have automatic flush valves
Improve lighting inside and out
Clean and repaint all pavilions
Add clay to help with drainage
Install sprinklers on field #2
Install new rims and nets
Resurface
Install new fencing
Playground Surfacing
Conditon Surfacing Condition Replace in Comments
Good mulch fair Equip- Add mulch when needed
8 yrs
Good mulch Fair Equip- Add mulch when needed
8 yrs
Costs
4 Flush Valves x $400 each = $1600
4 Safety lights = $400
2 loads of clay x $600 per load = $1200
$500
� . ; �v r •rte, ...:��.::
Winter Springs Parks and Recreation .�