HomeMy WebLinkAboutCPH Engineers, Inc. Task Order No. 4 ast Side Forcemain Design - 2012 01 25 TASK ORDER NUMBER 4 FOR EAST SIDE FORCEMAIN DESIGN This Task Order dated , 2012, by and between the City of Winter Springs (hereinafter called the OWNER) and CPH Engineers, Inc. (hereinafter called the Engineer), is mutually agreed upon and declared an authorized Task Order based on Agreement for Engineering Services - dated September 10, 2008 — RFQ 008/08/BF. The appropriate provisions of the Agreement apply as fully as if repeated herein. SECTION 1 GENERAL 1.1 The purpose of this Amendment is to provide for Engineering Services, more specifically itemized herein, in the preparation of contract documents for a new 16 inch forcemain and a new reclaimed water main from the intersection of Seneca Blvd. and Vistawilla Drive to Northern Way; then east and south on Northern Way to Winter Springs Blvd.; then west on Winter Springs Blvd to the East WRF entrance and on into the WRF connecting to the surge tank. Provisions shall be provided to extend the forcemain to the north of Seneca Blvd. along Vistawilla Drive for future service capability of areas north of SR 434. The forcemain will provide for re- direction and connection of other lift stations and forcemains into the new system. SECTION 2 BASIC SERVICES OF THE ENGINEER 2.1 GENERAL 2.1.1 The ENGINEER agrees to perform professional services in connection with the project as hereinafter stated. 2.1.2 The ENGINEER will serve as the OWNER'S professional engineering representative in those phases of the project to which this Amendment applies, and will give consultation and advice to the OWNER during the performance of his services. The ENGINEER will perform the services for the City Commission under the general supervision of the City Manager and Public Works /Utilities Director and will submit interim plans and or reports to them for their review, input, decision, etc. as appropriate. SECTION 3 SCOPE OF SERVICES 3.1 GENERAL The OWNER hereby authorizes the ENGINEER to proceed with the preparation of the plans and specifications to enable a contractor to perform construction of both mains. We will provide engineering services for the design of a new sixteen inch forcemain system as well as a new reclaimed water main along Vistawilla Drive, Northern Way and Winter Springs Blvd. All new forcemains will be placed within the existing roadway Right of Way (ROW). The size of the new reclaimed water main will be determined as a part of this scope of services. The new forcemain e orcemain will be connected at various locations to the existing forcemain system. The streets and the estimated lengths of forcemain for the associated streets included in this proposal are as follows: • Vistawilla Drive ( 1,565 LF) • Northern Way ( 3,500 LF) • Winter Springs Blvd. ( 1,530 LF) • East WRF ( 560 LF) • Approximate total length 7,200 LF 3.2 Gather and review available data on the existing area. Perform site visit to evaluate existing conditions, general utility locations and identify possible line routing in the ROW. Prepare preliminary engineering design for use at City meetings and with the review agencies in accordance with typical engineering guidelines. 3.3 Based on preliminary engineering, determine the necessary reclaimed water main sizing and prepare 30% design layout/drawings and submit electronic files for review (Task 1). The 30% drawings will be in the half size format for submittal and review. Submittals will be in electronic .pdf format. Originals will be set up on 22 inch by 34 inch drawing paper size. This allows production of scalable half size drawings to be printed on 11 inch by 17 inch paper. Sheets to include the following: • Cover Sheet • General Notes Sheet/Key Sheet • Plan sheets (double plan format) 1 inch equals 20 foot scale (6 sheets). No profile view will be provided for the design drawings. • Intersection and specific crossing details (3 sheets) • Sanitary and Reclaim System Miscellaneous Standard Details (2 sheets) 3.4 Perform topographic survey of the proposed force main corridor approximately 7,200 LF starting approximately 150 feet north of the Seneca Blvd and Vistawilla Blvd intersection, then south along Vistawilla Blvd to Northern Way; then southeast along Northern Way to Winter Springs Blvd; then west along Winter Springs Blvd to the entrance to the East WRF; then south into the plant site to the headworks structure. The survey will provide the apparent ROW line and pick up pertinent features along the route for half (1/2) of the ROW. Existing underground utilities that have been flagged by the respective utility owners shall be located by the survey. In addition, the surveyor will also pick -up specific information on five gravity sanitary manholes, a portion of the Lift Station 6E site, the bear Creek crossing and bridge information and the culvert crossing information on Vistawilla. (Task 2). 3.5 Since the area is already developed, we will not retain the services of a geotechnical engineer per the direction of the OWNER. 3.6 CPH scientists shall need to perform a Wetland Delineation at the Bear Creek Crossing to provide documentation to the permitting agencies that the proposed force main construction will not encroach upon nor adversely impact the wetlands or creek. The approximate wetland limits shall be delineated in the field with flagging tape and /or stakes in accordance with methodologies outlined in the U.S. Army Corps of Engineers (ACOE) Wetland Delineation Manual (1987), the 2008 Corps Interim Regional Supplement to the Corps Wetland Delineation Manual: Atlantic & Gulf Coastal Plain Region and the Florida Unified Wetland Delineation Methodology (Chapter 62 -340, F.A.C.). The wetland delineation shall be performed on both sides of the creek and extended out approximately 20 feet on each side of the existing bridge structure. CPH scientists shall prepare a memorandum discussing the wetland delineation and coordinate with the project surveyor and /or engineer to provide wetland delineation information such as a map showing the approximate location of the delineated wetland line and flag numbers. Including the approximate coordinates of each delineation point as recorded by a Garmin handheld GPS unit. 3.7 CPH will obtain the services of a structural engineer to evaluate the existing bridge and pipe supports currently supporting the 6 -inch force main at the Bear Creek crossing for their suitability of supporting the proposed 16 -inch force main and the new reclaimed main. The support system will either be modified to accommodate the larger force main and the new reclaimed main or be replaced with a new support system. 3.8 Prepare 90% and 100% plans and specifications for the pipe improvements for bidding purposes (Task 3). The plans will be plan view only with no profile view. Specific intersection and critical crossing profiles will be provided in addition to the plan views. Submittals will be in electronic .pdf format. The 90% and 100% drawings will be in the half size format for submittal and review. Originals will be set up on 22 inch by 34 inch drawing paper size. This allows production of scalable half size drawings to be printed on 11 inch by 17 inch paper. 3.7 CPH will prepare and submit the required FDEP Wastewater Project related permit application and supporting documentation necessary to obtain required permit for construction and operation of the Project. Respond to all requests for additional information from permitting agencies. Pay fee for all permits. Winter Springs will reimburse fees paid by the Engineer. The reclaimed water main is within the City's existing service area and therefore is not required to be permitted. SECTION 4 SCHEDULE 4.1 The ENGINEER agrees to prosecute the work in a timely manner until the Project is completed. The following is our agreed upon schedule: NTP approximately January 24, 2012 Submit 30% plans — May 4, 2012 City review /comments — May 18, 2011 Revise plans to 90% - June 22, 2012 City 90% review process — July 9, 2012 Submit Final Plans — July 30, 2012 SECTION 5 PAYMENT 5.1 PAYMENT Payments for services and expenses of the ENGINEER to be as set forth below: The fee for the engineering design scope of services described herein will be provided for a lump sum fee of $ 71,755.00 inclusive of expenses, for the base services, as shown on the attached manpower breakdown. IN WITNESS WHEREOF, the parties hereto have made and executed this Amendment the day and year first above written. OWNER: City of Winter Springs, Florida By: ATT`.� Date: i/zs/ 2. ENGINEER: CPH En eer , n . A S : A ` 8►47;11M David E. Mahler, P. . Sr. Vice President Date: /—/1-11 Winter Springs Proposal East Side 16 Inch Force Main & Reclaimed Main Senior Professional Senior Task 1 Task Description Principal Engineer CADD Tech Clerical II Preliminary Engineering 1 Conduct initial meeting to collect available data. 2 2 1 2 Review existing data for the project area (water, sewer, etc.) 1 2 3 Perform site visit to evaluate existing conditions, review utility locations and identify potential conflict situations 2 2 Evaluate flow and demand requirements for determination of 4 required size for the proposed reclaimed water transmission main 8 24 8 2 5 Prepare 30% drawings and layout (12 drawings with cover sheet) 4 10 22 2 6 Submit 30% plan sets to City for review (Hard Copies and pdf files) 1 2 1 7 Meet with staff to review 2 2 8 Prepare written list of comments and actions 3 2 SUBTOTAL DIRECT LABOR 16 45 36 8 See supporting documentation for breakdown of miscellaneous expenses TOTAL LABOR COST $11,425.00 Misc. Expenses $46.50 TOTAL TASK 1 $11,471.50 RATE HOURS Project Manager $155.00 16 $2,480.00 Professional Engineer $125.00 45 $5,625.00 Senior Cadd Tech $80.00 36 $2,880.00 Clerical II $55.00 8 $440.00 Total Raw Labor Cost $11,425.00 Page T -1 Winter Springs Proposal East Side 16 Inch Force Main & Reclaimed Main Env Sc Project Senior Sub Task 2 Task Description Manager Engineer Cadd Tech Clerical consultant Survey, Environmental and Structural Topographic information of route of the project area. Use City maps /aerials for base. City to provide. CPH to 1 transfer, coordinate and set -up for the project. 1 2 1 $9,621.00 2 Wetland determination at Bear Creek 8 Structural evaluation and design for force main supports 3 on Bridge 1 2 1 $3,800.00 SUBTOTAL DIRECT LABOR HOURS 8 2 4 2 $13,421.00 TOTAL LABOR COST $1,720.00 Sub Consultant $13,421.00 Misc. Expenses $2.50 TOTAL TASK 2 $15,143.50 RATE HOURS Environmental Science Manager $130.00 8 $1,040.00 Professional Engineer $125.00 2 $250.00 Senior Cadd Tech $80.00 4 $320.00 Clerical II $55.00 2 $110.00 Total Raw Labor Cost $1,720.00 Page T -2 Winter Springs Proposal East Side 16 Inch Force Main & Reclaimed Main • Project Project Senior Task 3 Task Description Manager Engineer Design Tech Clerical Preparation of Construction Documents Final Design 1 Prepare 90% drawings and specifications a Cover sheet 1 3 8 b Location /Key Map and General Notes 1 6 8 c Double Plan sheets (6 anticipated at 1 " =20' scale) 8 32 96 d Intersection and Specific Crossing Details (3 sheets) 4 12 24 e Standard Sanitary Details (1 sheet) 2 2 f Provide quality assurance and "Constructibility" review 8 g Prepare technical specifications 2 14 8 Prepare preliminary opinion of probable construction cost categorized h by subdivision or phasing 1 8 4 1 Submit electronic sets of the 90% P &S to City for review. Submittal i package will include plans, specifications and probable opinion of construction cost 1 2 1 j Meet with City staff to review 3 3 k Prepare and submit Comment and response list segregated by plan sheet page 1 4 2 I Revise documents per 90% review (see below) 2 Prepare of 100% Drawings and specifications 8 28 64 2 3 Provide quality assurance and "Constructibility" review 4 4 Prepare a signed and sealed Engineers Cost Estimate 1 6 4 1 5 Submit electonic sets of 100% construction drawings, technical specifications and probable opinion of construction cost to the City 1 2 1 SUBTOTAL DIRECT LABOR 42 120 214 16 See supporting documentation for breakdown of miscellaneous expenses 'TOTAL LABOR COST $39,510.00 Misc. Expenses $57.50 TOTAL TASK 3 $39,567.50 RATE HOURS Project Manager $155.00 42 $6,510.00 Professional Engineer $125.00 120 $15,000.00 Senior Cadd Tech $80.00 214 $17,120.00 Clerical I I $55.00 16 $880.00 Total Labor Cost $39,510.00 Page T -3 Winter Springs Proposal East Side 16 Inch Force Main & Reclaimed Main Project Project Senior Task 4 Task Description Manager Engineer Cadd Tech Clerical Subconsultant Permitting Prepare and submit FDEP permit application. (City to 1 provide pertinent information on permit application). 1 3 2 2 3 Respond to RAI from Permitting Agency 1 2 1 1 4 Pay FDEP permit fee $500.00 (wastewater) Reimbursement by City. 1 1 SUBTOTAL DIRECT LABOR 2 6 3 4 $0.00 SUBTOTAL LABOR $1,520.00 Subconsultant $0.00 Misc Exp. $527.50 TOTAL TASK 4 $2,047.50 RATE Project Manager $155.00 2 $310.00 Project Engineer $125.00 6 $750.00 Senior Cadd Tech $80.00 3 $240.00 Clerical II $55.00 4 $220.00 Subtotal Raw Labor $1,520.00 Page T -4 Winter Springs Proposal East Side 16 Inch Force Main & Reclaimed Main Project Project Sr. Cadd Task 6 Task Description Manager Engineer Tech Clerical Subconsultant Bidding Assistance 6.1 Furnish 15 sets of drawings, CD's and technical specs for bidding purposes 1 3 3 2 6.2 Attend pre -bid conference 3 2 6.3 Consider written questions and prepare addenda as required related to water main design. 1 4 2 2 Review and evaluate the three (3) lowest bid packages 6.4 and verify bidder's experience and references and make a recommendation of award to the City 2 4 SUBTOTAL DIRECT LABOR 7 7 5 10 $0.00 SUBTOTAL LABOR $2,910.00 See supporting documentation for breakdown Subconsultant $0.00 of miscellaneous expenses Misc. Expenses $615.00 TOTAL TASK 6 $3,525.00 RATE Project Manager $155.00 7 $1,085.00 Project Engineer $125.00 7 $875.00 Senior Cadd Tech $80.00 5 $400.00 Clerical I I $55.00 10 $550.00 Subtotal Raw Labor $2,910.00 Page T -5 MISCELANEOUS EXPENSES Winter Springs Proposal East Side 16 Inch Force Main & Reclaimed Main 1 ITEM DESCRIPTION TASK 1 TASK 2 TASK 3 TASK 4 TASK 5 COST UNIT Qty I Ext Qty I Ext _ Qty Ext Qty Ext Qty Ext Photocopies 8 1/2 x 11 $0.05 Sheet 150 $7.50 50 $2.50 500 $25.00 50 2.50 7500 $375.00 Photocopies 11 x 17 $0.20 Sheet 20 $4.00 20 $4.00 Blueprinting 24" x 36" (2 -D Color Line Drawings) $1.25 Sheet 20 $25.00 20 $25.00 20 25.00 150 $187.50 FDEP Permit Fee $500.00 Each 1 500.00 1 Digital Camera $10.00 Ea Use 1 $10.00 Diskette $3.50 Disk 1 $3.50 15 $52.50 Miscellaneous TOTALS $46.50 $2.50 $57.50 $527.50 $615.00 Page T -6 Winter Springs Proposal East Side 16 Inch Force Main & Reclaimed Main TASK SUMMARY 'LUMP SUM TASKS TASK 1 PRELIMINARY ENGINEERING $11,471.50 TASK 2 SURVEY & GEOTECHNICAL $15,143.50 TASK 3 PREPARATION OF CONSTRUCTION DOCUMENTS $39,567.50 TASK 4 PERMITTING SERVICES $2,047.50 TASK 5 BIDDING SERVICES $3,525.00 TOTAL LUMP SUM PROJECT DESIGN COST $71,755.00 Page T -7