HomeMy WebLinkAbout2012 01 25 Regular 600 Review and Adopt List for Sidewalk GapsBICYCLE AND PEDESTRIAN
ADVISORY COMMITTEE
AGENDA
ITEM 600
January 25, 2012
Meeting
CONSENT
INFORMATIONAL
PUBLIC HEARING
REGULAR X
MGR /DEPT
Authorization
REQUEST: Public Works Department requesting the Bicycle and Pedestrian Advisory
Committee's review and adopt a prioritization list for completing the existing
sidewalk gaps along City collector roads
SYNOPSIS: The City prepared a complete sidewalk inventory map in February 2011. A list of
the sidewalk gaps on City collector roads was presented at the September 21,
2011 BPAC meeting. This agenda item provides a recommended prioritization
list for the Committee's review, input, and adoption.
CONSIDERATIONS:
• A copy of the City's Sidewalk Inventory Map prepared in February 2011 is attached as
Exhibit A. This map uses color codes to identify the existence of sidewalks on one or
both sides of all public streets in the City:
Yellow: Sidewalks on both sides
Orange: Sidewalks on one side
Red: No Sidewalks
• At the June 2011 BPAC meeting, the Committee requested information regarding the
existence of sidewalk gaps along the City collector streets. At the September 21, 2011
BPAC meeting, the Committee reviewed a list of the sidewalk gaps along City collector
streets. The table on the following page provides a recommended prioritization for
completing these sidewalk gaps. Please refer to the map for identification of the specific
locations where sidewalks exist.
January 25, 2012
Agenda Item =600
Page 2 of 3
City of Winter Springs
Collector Street Sidewalk Gap Prioritization
Rank
Road Name
Sidewalli Gaps -
Both Sides
Sidewalli Gaps - One
Side
Conmrent
1
Doran Drive
1
N
Planned as part ofGrandeville development OR W.S. Town
Center Sidewallc Project
2
Edgemon Avenue
N
All or part is included in North Village Wallc Sidewallc Connectivity
Project
3
North Tuskawilla Road
N
Included in W. S. Town Center Sidewallc Project
4
N. Moss Road
1
Could be part of North Village Wallc Sidewallc Connectivity*
Project
5
Shepard Road - Sheoah to Jeffirev
1
6
Tuscora Drive - Northern to WS Blvd
1
7
Northern Wav- Tuscora to Running Bear
1
8
Winter Springs Blvd
N
Gap is at Country Club frontage
9
Sheoah Blvd
N
Wide paved shoulders on both sides
10
Orange Avenue
1
Gaps to be filled concurrent with future development and eventual
Orange Avenue exlension
11
Shore Road
N
N
Ranchlands - typical section not designed for paved sidewaks
12
Panama Road
N
Ranchlands - typical section not designed for paved sidewaks
13
Haves Road
N
N
Ranchlands - typical section not designed for paved sidewaks
14
Fisher Road
N
Ranchlands - typical section not designed for paved sidewaks
15
Bahama Road
N
Ranchlands - typical section not designed for paved sidewaks
16
S. Moss Road
1
N
Ranchlands - typical section not designed for paved sidewallcs
17
Northern Wav- Howell Creek to Shetland
N
Voted down by City Commission in 2008
FISCAL IMPACT:
This agenda item is for the BPAC's review and adoption of a recommended sidewalk
prioritization gap list and has no fiscal impact.
COMMUNICATION EFFORTS:
The Meeting Agenda and this Agenda Item have been forwarded to the Bicycle And
Pedestrian Advisory Committee members and are available on the City's Website, LaserFiche,
and the City's Server. The Agenda has been forwarded to the Mayor and City Commission; City
Manager; and City Attorney /Staff. Additionally, the Meeting Agenda has been sent to
January 25, 2012
Agenda Item =600
Page 3 of 3
media /press representatives, all Homeowner's Associations on file with the City, all individuals
who have requested Agenda information, Department Directors; and also posted outside City
Hall; posted inside City Hall with additional copies available for the general public.
RECOMMENDATION:
Staff recommends that the Bicycle and Pedestrian Advisory Committee review the
sidewalk gaps and adopt a prioritization list.
ATTACHMENTS:
1. Exhibit A — Sidewalk Inventory Map
Im
I0
IW
1 \� r
o \ +I 1f I/I I�VIW oa -
N
wE
•l
0 0.3 0.6 1,2 Mlles
Source; Winter Springs Planning Division, 2011
ti. ,
' '
r� NTe
City of antrs° prings
Legend
i
INVENTORY OF PUBLIC SIDEWALK GAPS
Cross Seminole Trail
Sidewalk- Both Sides
0
& Proximity to Pedestrian Attractors
Sidewalk- OneSide
\`,
NO Sidewalks
FEBRUARY 2011
■Transit. 114mlradius
■ Schools. 114 ml radius
■ Parks. 114 ml radius
lake Jesup
r
1
II
B n
IW
1 \� r
o \ +I 1f I/I I�VIW oa -
N
wE
•l
0 0.3 0.6 1,2 Mlles
Source; Winter Springs Planning Division, 2011
ti. ,