HomeMy WebLinkAbout2011 02 16 Other - Inventory of Public Sidewalk Gaps - 2011-Related to '600' Bicycle And Pedestrian Advisory Committee
Special Meeting
February 16, 2011
The attached documents were provided to the Committee
Members during the Regular Agenda Item "600" at the
February 16, 2011 Bicycle And Pedestrian Advisory
Committee Special Meeting.
Priority Inventory of Public SIDEWALK Gaps RANKED LEGEND LEGEND
S- School IT- Transit P- Pedestrn
by Proximity to, and # of, Pedestrian Attractors
P- Park C Connectr B- Bicycle
T- Transit
Cost Total Est. Target
Street S P T C LF # Width / LF Purpose / Value
Cost Compltn
Priority 1A- North Village Walk Pedestrian Connectivity Project- Phase I 1 side only 5 -yr
N Cortez Av (bet 434 & 1st) Side 1 Only X XX X 861 2 5' $ 32 $ 27,552 one side
N 1st St (bet N Bombay & N Edgemon) X XX X 570 2 5' $ 32 $ 18,240 one side
N Devon (bet 434 & 1st) X X X X 590 2 5' $ 32 $ 18,880 one side
N Fairfax (bet 434 & 1st) X XX X 285 2 5' $ 32 $ 9,120 one side This area of Winter Springs was developed in the 1960s and has a
high street connectivity index, due to the presence of a strong
N Devon (bet 1st & 3rd) XX X X 1080 2 5' $ 32 $ 34,560 one side street grid pattern. However, most of the streets lack sidewalks,
N Fairfax (bet 1st & 3rd) XX X X 970 2 5' $ 32 $ 31,040 one side yet are within one quarter of a mile to Winter Springs Elementary
N 1st Ct X X X 655 2 5' $ 32 $ 20,960 one side
School, Torcaso Park and /or Sunshine Park, and the LYNX 434 P,B, T
N 1st St (bet N Fairfax & N Moss) X X X 710 2 5' $ 32 $ 22,720 one side Crosstown Bus Route. Therefore, a great opportunity exists to
increase pedestrian connectivity between these facilities, given
N Cortez Av (bet 1st & 2nd) X X X 861 2 5' $ 32 $ 27,552 one side the existing street grid pattern.
N 3rd St (bet Edgemon & Fairfax) XX X 630 2 5' $ 32 $ 20,160 one side
Sherry Av (w side bet 434 & Edwin) X XX 500 2 5' $ 32 $ 16,000 one side
Sherry Av (w side bet Edwin & San Gabriel) X XX 630 1 10' $ 75 $ 47,250
1.6 mi. of 5' wide Sidewalks along streets with none. Area defined as 60.9% Low Income $ 294,034 Apply for CDBG Funding, Applictn due March 4, 2011
Priority 1B WSHS Pedestrian Connectivity Project 5 - yr
Doran Dr (bet 434 & Blumberg) X X X XX 215 1 6' $ 37 $ 7,955 Winter Springs High School is a premier educational facility
Doran Dr (w side, bet Blumberg & WSHS) X X X X 773 2 6' $ 37 $ 28,601 one side located within the City's Town Center. Yet the school stands
(n side, City Hall to Doran) X X X X 300 2 10' disconnected from the rest of the Town Center, due to the lack of
Lallathin Lane
( ty ) $ 75 $ 22,500 one side connecting sidewalks to existing facilities such as the Cross
WSHS Entrance Loop (at main entrance) X X X X 525 1 8' $ 60 $ 31,500 Seminole Trail, the LYNX 434 Crosstown Bus Route, and nearby
Retention Pnd (east side) X X X X 290 1 8' $ 60 $ 17,400 retail businesses and residential communities. Most students
City Hall entrance (east side) X X X X 576 1 6' $ 37 $ 21,312 arrive by car, resulting in congesting the adjacent roadways P,B, T
Ci Hall west side to WSHS X X X X 600 1 6 before and after school. In an effort to encourage students to use
ty ( ) $ 37 $ 22,200 alternative transportation options, sidewalks and multi use paths
WSHS Drive to WSHS X X X X 370 1 10' $ 75 $ 27,750
need to be implemented.
WSHS Drive (s side, at retention) X X X X 557 1 8' $ 60 $ 33,420
WSHS Dr (s side, bet retention & Doran) X XX X 285 1 8' $ 60 $ 17,100
WSHS to Cross Seminole Trail X X XX 435 1 10' $ 75 $ 32,625
.9 miles of Sidewalks connecting WSHS to other pedestrian attractors in Town Ctr $ 262,363 Apply for MetroPlan Orlando Funding, Applictn due March 2011
Priority 2- North Village Walk Pedestrian Connectivity Project- Phase II 5 -yr
Algiers Av X X X 485 2 5' $ 32 $ 15,520 one side
N 1st St (bet N Edgemon & N Fairfax) X X X X 560 1 5' $ 32 $ 17,920
N Edgemon (bet 434 & 1st) X X X X 715 1 5' $ 32 $ 22,880
N Cortez Av (bet 434 & 1st) Remaining Side X X X X 861 1 5' $ 32 $ 27,552
N lst St (bet N Bombay & N Edgemon) Remaining Sic X X X X 570 1 5' $ 32 $ 18,240
N Devon (bet 434 & 1st) Remaining Side X X X X 590 1 5' $ 32 $ 18,880
N Edgeman (bet 434 & 1st) X X X X 715 1 5' $ 32 $ 22,880
N Fairfax (434 & 1st) X X X X 440 1 5' $ 32 $ 14,080
N 3rd St (bet Sheoah & N Edgemon) XX XX 1710 1 5' $ 35 $ 59,850
N Moss (bet 1st & Rhoden) X X X 210 1 5' $ 32 $ 6,720
N Fairfax (bet lst & 3rd) Remaining Side XX X X 970 11 5' $ 32 $ 31,040
N Edgemon (bet 1st & 3rd) XX X X 1212 1 5' $ 32 $ 38,784
1.7 miles of 5 -ft wide Sidewalks, in area defined as 60.9% Low Income $ 294,346 Apply for MetroPlan Orlando Funding, Applictn due March 2011
Priority 3- North Village Walk Pedestrian Connectivity Project- Phase III 10 -yr
N Devon (bet 1st & 3rd) Remaining Side XX X X 1080 1 5' $ 32 $ 34,560
N Moss (bet Excelsior & 419) XX XX 1510 1 5' $ 32 $ 48,320
N Edgeman (bet 3rd & 419) XX XX 1539 1 5' $ 32 $ 49,248
N 1st Ct- Remaining Side X X X 655 1 5' $ 32 $ 20,960
Algiers Av- Remaining Side X X X 485 1 5' $ 32 $ 15,520
N 1st St (bet Fairfax & N Moss) Remaining X X X 710 1 5' $ 32 $ 22,720
N Bombay (bet 434 & 1st) X X X 1156 1 5' $ 32 $ 36,992
N 3rd St (bet Edgemn & Fairfx) Remaining XX X 630 1 5' $ 32 $ 20,160
N Bombay (bet 1st & 3rd) XX X 1066 1 5' $ 32 $ 34,112
1.7 miles of 5 -ft wide Sidewalks, in area defined as 60.9% Low Income $ 282,592
Priority 4A- South Village Walk Pedestrian Connectivity Project 15 -yr
5 Fairfax (bet 434 & Lombardy) X X XX 1235 2 5' $ 32 $ 39,520 one side
S Devon (bet 434 & Lombardy) X X X 1250 2 5' $ 32 $ 40,000 one side
S Fairfax (bet 434 & Lombardy) Remaining x X XX 1235 1 5' $ 32 $ 39,520
S Devon (bet 434 & Lombardy) Remaining X X X 1250 1 5' $ 32 $ 40,000
S Cortez (bet 434 & Lombardy) X X X 1263 1 5' $ 32 $ 40,416
Lombardy (bet S Cortez & S Flamingo) X X X 1317 1 5' $ 32 $ 42,144
S Edgemon (bet 434 & Alderwood) X X 1800 1 5' $ 32 $ 57,600
S Flamingo Av (bet Lombardy & Alderwood) X X 455 1 5' $ 32 $ 14,560
1.9 miles of 5 -ft wide Sidewalks $ 313,760
Priority 4B Town Center Pedestrian Connectivity Project 15 - yr
Tuskawilla Rd (w side, bet HS Rd & TT) X X X 1028 1 10' $ 75 $ 77,100 x
WSHS Drive (s side, bet CWP & retntn) X X X X 812 1 8' $ 60 $ 48,720 x
Central Winds Pkwy (n side at Pugsley) X X X X 212 1 8' $ 60 $ 12,720 x
Dog Park to Trail X X X X 757 1 6' $ 37 $ 28,009
Tuskawilla Rd (bet TT & Lake Jesup) X X X 615 2 12' $ 85 $ 52,275 one side Combine with Lake Project
Orange Av (along Park frontage) X X X 1170 1 6' $ 37 $ 43,290 TIMF
$ 138,540
Priority 5 North Village Walk Pedestrian Connectivity Project - Phase IV 20 - yr
Sheoah (bet 1st & 3rd) X X X 1535 1 5' $ 32 $ 49,120
Wade St (bet 434 & Frank) X X X 792 1 5' $ 32 $ 25,344
Wade St (bet Frank & 419) X X X 450 1 5' $ 32 $ 14,400
Sherry Av (bet 434 & Edwin) remaining side X XX 500 1 5' $ 32 $ 16,000
N Flamingo Av (at Civic Ctr) X X X 315 2 6' $ 37 $ 11,655 one side Combine with Parks Project
N 2nd X X 615 2 5' $ 32 $ 19,680 one side
N Cortez Av (bet 1st & 2nd) Remaining Side X X 861 1 5' $ 32 $ 27,552
N 2nd- Remaining Side X X 615 1 5' $ 32 $ 19,680
SR 419 (bet Layer Elem & SR 434) X X X 1100 2 6' $ 37 $ 40,700 one side
1.3 miles of 5 -ft wide Sidewalks, in area defined as 60.9% Low Income $ 224,131