Loading...
HomeMy WebLinkAbout2011 01 20 Other- Trail Photos - Cross Seminole Trail Safety Improvements Bicycle And Pedestrian Advisory Committee Special Meeting January 20, 2011 The attached Trail Photos were emailed to the Committee Members by Mr. Brian Fields, City Engineer, Public Works Department. Joan Brown From: Brian Fields Sent: Tuesday, January 18, 2011 3:45 PM To: Brian Fields; Eloise Sahlstrom; Joan Brown Subject: Cross - Seminole Trail Safety Improvements in Winter Springs Attachments: BPAC Recommended Cross - Seminole Trail Improvements 12- 15- 10.pdf BPAC Members, Please find attached a summary of the committee's recommended Cross - Seminole Trail safety improvements from the December meeting. City Staff will hopefully soon be meeting with Seminole County Engineering to review these recommendations and to obtain the County's input. Please review the attachment and we can discuss any comments or suggested changes at this week's meeting. Regarding the new trail crossing at Michael Blake Blvd (under construction between Tuskawilla Road and the trail bridge), the temporary crossing is in place as a 4 -way stop, and the permanent crossing is being designed to be a 4 -way stop. Sincerely, Brian Fields, P.E. City Engineer City of Winter Springs 407 - 327 -7597 (office) 321 - 388 -2757 (cell) 1 Cross - Seminole Trail Improvements Recommended by the Winter Springs Bicycle and Pedestrian Advisory Committee on December 15, 2010: 1. Tuskawilla Road Crossing a. Install stop signs on Tuskawilla Road (both directions), creating a 4 -way stop b. Install advanced warning signage and striping per County standards c. Clear vegetation on the northwest corner of the crossing to provide more sight distance, to the extent possible s I 1 ff T` r 1 '� , / , k , rid 2. Central Winds Parkway Crossing a. Install stop signs on Central Winds Parkway (both directions), creating a 4 -way stop b. Install advanced warning signage and striping per County standards 111114111141111111410,,,. " ' I '14141k ' 'L.*- — "4:tr `..: .„ '''' . - .1. ' 4'."/ — - — — 1:- ': . a ■ 4 e 4 \ , ry 3. Dog Park Entrance a. Install stop signs on both approaches to the trail crossing b. Install advanced warning signage and striping per County standards c. Evaluate options for stop control and /or advanced warning signage on the northbound /westbound approach (traffic entering the dog park) considering the 90- degree turn just before the trail crossing a . ■ le 4 , f .'.:4,,,i '4,‘,... „7. .,-- --a .. a. _. , 4% ',a4 "kal! ":^6. i+��i'S9n� _°'. .e�l: A.C.n'4 4. SCPS Bus Depot a. Clear vegetation where possible to improve sight distance b. Investigate options for additional alerts to trail users that vehicles do not stop ( ,R. Y`' , Y _r ' ` _ r•> `` / , • • • • �.. - ' f 5. Michael Blake Boulevard (currently under construction between Tuskawilla Road and SR 434 Trail Bridge) a. Install stop signs on Michael Blake Boulevard (both directions), creating a 4 -way stop, under both the temporary and permanent conditions b. Install advanced warning signage and striping per County standards c. Clear vegetation where possible to provide more sight distance