REQUEST: Community Development Department is advising the City Commission of the
status of various current planning projects.
SYNOPSIS: The City Commission has been asked to be kept informed of the status of all
development projects in the City. This agenda item is an update to the Commission on the
status of current planning projects and any events /changes since the last City Commission
meeting.
CONSIDERATIONS:
Those projects listed below are those with some consistent activity, although not every project
has additional activity for every update report. For a project maps and information on the
school generation rates in the City, please go to the http:// www.winterspringsfl.org /item100.
The number to the left of the project name in this report corresponds to the number on the City
Map showing the location of the project. Items listed below that have changed since the last
updates are shown in bold type. Items which have not and do not appear likely to generate
any change were dropped from the (October 11, 2010) agenda item.
• (1) SJRWMD (formerly Minter) Site - Staff review was held on August 25, 2008. The
site plan was reviewed at the September 3, 2008 P &Z Board meeting and the
conditional use was reviewed at the September 4, 2008 BOA meeting. Both site plan
and first reading for the rezoning were approved at the September 22, 2008
Commission meeting. The Conditional Use Permit and second reading /adoption of the
rezoning (Ord. No. 2008 -12) were held at the October 13, 2008 City Commission
meeting. Public Works provided an informational up -date of the status of the Solary
Canal Stormwater Treatment Area project to the Commission at its March 23, 2009
meeting. A pre -bid was held April 16, 2009 with bids due April 29, 2009. The low
bidder was Briar Corporation at $1.23 million. Briar Corporation backed out of the
process because they were unwilling to hold their price for 90 days. An update project
was provided at the December 14, 2009 City Commission meeting. A contract was
awarded to the 2 lowest bidder, Wal -Rose. Staff met with Wal -rose on March 31,
2010. Construction commenced on Monday, April 19, 2010. Construction is
scheduled for completion in December 2010.
October 11, 2010
Information 100
Page 2 of 10
• (3A) Mann Site (Ladybird Academy) — Preliminary engineering plans for the 7,500
S.F. Ladybird Academy Daycare received a unanimous vote for approval at the
October 7, 2008 P &Z Board meeting and was approved, subject to conditions, at the
October 27, 2008 City Commission meeting. The Applicant submitted for final
engineering approval on April 6, 2009. The revised engineering plans and aesthetic
package were reviewed at the June 16, 2009 staff review. The applicant's preliminary
building plans have been reviewed for sufficiency. The final engineering /site plan and
aesthetic revisions were approved at the August 10, 2009 Commission, along with a
Development Agreement/Notice of Zoning Restriction modification. A pre -
construction meeting was held on October 15, 2009. The properties to the north will be
designated as recipient site for trees donated in fulfillment of arbor permit obligations.
Site work is on -going and the building permit was issued on January 4, 2010. Vertical
construction is progressing. Construction of the SR 434 modifications is complete but
must be inspected and accepted by FDOT. The building shell construction is complete
and the interior build -out is underway. The contactor has estimated an opening date for
this facility sometime in October 2010. Staff has talked with representatives of the
subject project and the pending Civil Suit in Orange County between Ladybird
Academy SBW, Inc. and Ladybird Inc. does not affect this project. The subject project
will be privately owned and operated.
• (8) Oviedo Marketplace —The plan for Section B of Parcel 14, comprised of a 77 unit
condominium project, was submitted on September 25 and was reviewed at the October
21, 2008 staff review. Staff received correspondence on December 1, stating that the
applicant was considering developing 58 residential units and using the southerly 2.5
acres (separated from the rest of the site by wetlands) for self - storage. On August 10,
2009, the Commission agreed with the applicant's request to allow a 100,000 SF
storage facility within the DRI /PUD. At its October 12, 2009 meeting the Commission
approved an implementation agreement authorizing the indoor personal storage and
approved the concept of substituting either 184 independent living units, 318 assisted
living facility beds, or some combination of these on the remaining portion of Parcel
14. Staff met with the applicant on January 28 to address development of the storage
facility. A site plan for the storage facility was submitted on February 17, 2010 and
was addressed at the March 16 staff review. Staff worked with the City Attorney to
determine a number of issues regarding the site (e.g. master plan, buffer, setbacks, and
signage). The applicant is currently working on the plat for Parcel 14 and anticipates
coming back with the Master Plan. The applicant is still working on a replat for Parcel
14 and a redetermination of the wetland boundary with the SJRWMD. The applicant
has requested a meeting (held on July 20, 2010) to discuss the final wording for the
Development Agreement for this project. The applicant's unofficial request to excavate
an additional pond to provide fill for on -site development was discussed at the August
17 staff review. Staff is working, in conjunction with the City Attorney, to finalize
language for the DA as well as to finalize the process for moving forward with the Stor
Kwik facility and the initial site plan for the ILF /ACLF facility.
October 11, 2010
Information 100
Page 3 of 10
• (10) Sonesta Pointe (AKA Winter Springs Village) — Preliminary plans for
approximately 436 town -homes on 40 acres within the Town Center were received
from Engle Homes on July 2, 2004, and were approved as a concept plan at its August
9, 2004, meeting and refined it at its September 27, 2004 meeting. The City Attorney
noted that the concept plan, as proposed, would require a development agreement or
special exception or both. The 40 acres had been acquired without platting. The
applicant has hired a new design team and met with staff on May 31 and July 8, 2005 to
summarize outstanding issues. On August 29, 2005, staff received an aesthetic review
package. The state required a letter from the City's Local Planning Agency, stating that
crossing the Cross - Seminole Trail with underground utility lines is consistent with the
City's Comprehensive Plan (approved at the December 6, 2005 LPA /P &Z meeting).
The aesthetic review was approved at the August 28, 2006 Commission meeting. A
final engineering plan was resubmitted on September 20, 2006 and was reviewed at the
October 3, 2006 staff review. A request for an early work permit was heard at the
September 25, 2006 meeting, but a decision was deferred until more information is
provided regarding specimen tree preservation. The applicant withdrew the early work
permit request. The applicant resubmitted for an early work permit and provided the
additional information requested by the Commission. This permit was approved by the
Commission at the November 13, 2006 City Commission meeting. The final
engineering plans and the Development Agreement were approved at the December 11,
2006, Commission meeting, but the development agreement was not executed or
recorded. A revised concept plan featuring 289 total units, incorporating 114 single
family detached units with 72 duplex units, 103 townhomes, 2 -car garages, and 260 on-
street parking spaces ( the 260 is excluding the Tuskawilla Road on- street parking) was
approved at the May 14, 2007 Commission meeting. The Sonesta team met with staff
on June 27, 2007, addressing lowering the overall site elevation and lowering some
units to less than the prescribed 2' minimum elevation above the adjacent sidewalk. A
revised aesthetic review package was approved at the August 13, 2007 Commission
meeting. Final engineering plans were received on August 20, 2007 and were
addressed at a special September 11, 2007 staff review. Staff reviewed an electronic
revision to the plans and advised the applicant of the necessary procedures to finalize
the plan changes. Staff and Dover Kohl & Partners reviewed and provided preliminary
comments to the applicant's informal concept plan for the site that includes various
single - family detached units, including front - loaded garages. At its April 28, 2008
meeting, the Commission approved a site development permit for limited clearing on
the property in those areas permitted for wetland mitigation The concept plan was
addressed at the May 18, 2010 staff review meeting and received conditional approval
at the June 14, 2010 Commission meeting. Renewal of the early work permit was
approved at the May 24, 2010 City Commission meeting and staff is awaiting an
executed copy of the agreement as well as satisfaction of the requirements to pull an
arbor permit. Meetings were conducted on June 22, 2010 and June 25, 2010 to discuss
the early work permit, modifications of the concept plan to eliminate the existing
deviations, and the landscape plan details. The 4 -lot plat and a final engineering plans
package were submitted and were discussed at the August 17, 2010 staff review. Staff
is working with the applicant to resolve several site plan design items. Staff has also
provided initial comments on a preliminary aesthetic review submittal. Staff is
working with the applicant to finalize the DA for the early work efforts.
October 1 I, 2010
Information 100
Page 4 of 10
• (11) JDC Calhoun I. City records indicate the following businesses are locating or
have located in the JDC Calhoun Town Center:
City staff has compiled an ownership map for Phase I of the Town Center. This map
has been made available electronically for reference purposes. Staff is arranging a
meeting with the new management company to discuss landscape and hardscape
maintenance, irrigation system repair and maintenance as well as overall site
maintenance. Staff met with two of the management /leasing companies on December
8, 2009 to discuss the current status of the Town center /lease amounts /recent tenant
losses, and plans for moving the Town Center forward. Staff received an e -mail list
from the tenant meeting and has updated the tenants on all relevant information
regarding the management and final ownership of the various sections of the Town
Center. Staff was working with Transwestern (management company) to locate
Verizon Wireless Services at the western end of Building 11, but Verizon withdrew.
Staff had a meeting on January 19, 2010 with a representative of Business Capital
Solutions Group regarding marketing of the Town Center. This representative is also
contacting the management companies for the Town Center properties. Staff
understands that the transfer occurred on March 16, 2010. Mosaic Restaurant has
opened in the former Beef O'Brady's location. The Hidden Harbor Seafood and
Lobster Feast is scheduled to open in early July in the former Gian Carlo's location.
Staff had a meeting with representatives of Kee Wee Entertainment on July 2, 2010 to
discuss initial plans for a family entertainment complex and restaurant in Building #1
of the Town Center. D'Tails is leaving the Town Center for a new location, with a
larger floorplan, near Red Bug Road. Staff is working with a prospective new buyer
for Buildings 4 and 17 to resolve a small encroachment issue on Building 4. After
much "back and forth ", Kee Wee Entertainment appears to have settled on the old
Eckerd's building at the intersection of SR 434 and SR 419 for their entertainment
complex and restaurant. Senor Tequila Mexican Grill has opened in the previous Beef
O'Brady's location.
(13) Town Center Phase II - Staff met with IBEW and 5 / 3` Bank representatives
on August 28, 2008 to discuss a possible lot split and the location of a branch bank on a
parcel located along the north side of SR 434, just east of the McDonald's. Staff met
Atwell -Hicks Development Consultants representatives on September 24, 2008 to
discuss lot split, infrastructure, and site design issues associated with the proposed
bank. A lay -out sketch was provided to staff on October 3, 2008. This sketch and
cursory staff comments have been forwarded to Dover Kohl and Partners for further
review. Staff met again with representatives of 5 /3 Bank and the IBEW to look at
proposals for the site design. Another proposal was sent via e -mail to staff and has
been reviewed by staff. Comments were sent to the applicant on December 30, 2008.
The FDOT has denied the turn lane request of the 5 /3 Bank team. City staff met
with the development team on February 2, 2009 to discuss the left turn lane issue.
Additional discussions with FDOT will be scheduled regarding the turn lane and
possible access from Tuskawilla Road, behind the McDonald's site. Staff met with
representatives of Lochrane Engineering and the IBEW's attorney on March 12, 2009
to discuss details of the Phase II Implementation Agreement. Staff and the City
October 11, 2010
Information 100
Page 5 of 10
Attorney met with representatives of the IBEW on December 7, 2009 about possible
modifications to the Implementation Agreement. Agenda Item 601 on the January 25,
2010 City Commission meeting addressed the proposed changes to the Phase 2
Implementation Agreement. The Commission voted to table the item and take it to a
special meeting which on February 11, 2010 at 6 PM. At the Special Commission
meeting on February 11, 2010, the Commission voted to negotiate a new
implementation agreement with the IBEW, preserving certain items contained in the
current agreement and allowing the IBEW more flexibility to market the property for
new development. Any new proposals must adhere to the Town Center Code and will
be subject to review and approval of the City Commission. Staff met in April with
developer representatives interested in placing three businesses on the northeast corner
of SR 434 and Tuskawilla Road. Staff had another meeting with this developer in May
2010 to attempt to modify the site plan to meet the Town Center Code requirements.
Staff has not met with the developer on the northeast corner property since May 2010. We
will continue to monitor. No word from the IBEW on the remainder of the Phase II
property. The representative for the developer that had proposed a site plan for the
northeast corner of SR 434 and Tuskawilla Road has requested a meeting to discuss
certain design criteria for the Town Center. At its September 27, 2010 meeting, the
Commission authorized payment to Winter Springs Holdings in the amount of
$247,561.80 for Michael Blake Boulevard.
(13 A)Town Parke Apartments — The 10.32 acre site is located on the south side of
SR 434, between the Mobil station and the pedestrian bridge. A conceptual site plan
for 201 (was 204) residential apartment units (1 -4 BR) with 413 (was 388) parking
spaces was submitted to the City on February 26, 2009 and was addressed at staff
review on March 19. The City Arborist and the applicant's landscape architect
conducted a site inspection for March 4, 2009. Revised plans were submitted on March
30 and were addressed at staff review on April 7, 2009. Further revised plans were
received on April 10 and were approved as a concept review by the Commission on
April 27, 2009. The concept approval was re -heard at a May 18, 2009 special meeting
and was approved subject to a negotiated Development Agreement with specific
stipulations. Further discussion ensued at the special May 26, 2009 Commission
meeting regarding crime statistics for high density housing areas. Staff has had no
recent communications with the applicant for this development. The Chronicle Jan. 28-
Feb. 3, 2010) stated that a lawsuit between Atlantic Housing Partners and the City of
Oviedo, regarding language in a development agreement which required owner -
occupied residential units, at site at SR 434 and Chapman Road, was dismissed by U.S.
District Judge Anne Conway. The applicant's engineer met with staff on March 1,
2010, to address how to proceed. Staff is responding to various questions from the
applicant's consultants at this time. Staff met with the applicant's landscape architects,
Foster Conant, on April 20. Staff has requested a draft of the proposed development
agreement language and has also requested the status of the economic fiscal impact
report as required by the City's Comprehensive Plan. Staff is continuing to field
questions from the applicant's consultants on design - related matters. Staff has
forwarded the Comprehensive Plan language that requires an economic fiscal impact
report to the project engineer. No information relative to the draft development
agreement language has been received as of April 30, 2010. Combined preliminary and
October 11, 2010
Information 100
Page 6 of 10
final engineering plans were submitted on May 05, 2010 and were addressed at the
May 25 staff review. Aesthetic review plans were addressed at the June 8 staff review.
Staff met with the architect on June 30, 2010 to discuss building architecture. Staff
received a submittal on July 9, 2010 for a second review of the engineering, a draft DA
(w /o payment), and a financial analysis. Staff review for the site plan and aesthetic
review was held on August 3, 2010. Three public meetings, with at least two in the
Tuskawilla area, should be planned. The applicant has indicated that they want to go
for approval of the final engineering and the DA at the last City Commission sleeting
in August 2010. Dates and locations for the public information meetings have been
scheduled. The first public meeting for the citizens to meet with the developer was
held on August 12, 2010. After meeting with the citizens, the applicant has scaled back
the proposal to provide fewer units and only include persons age 55 and older. A
submittal was received on September 2 for the September 21, 2010 staff review. The
applicant's team met with citizens, again on September 14, 2010. A September 24
re- submittal is scheduled for the October 5, 2010 staff review and an October 13,
2010 P &Z meeting.
(14 Magnolia Park — Staff met with the design team on April 14, 2009 to provide
initial comments on the trail land swap, site, and building design, for the amphitheater
with its changing rooms and rest rooms, in preparation for formal submittals. Staff met
with the consultants on May 14, 2009 to discuss the landscaping, lighting, and sound
components of the design. Additional discussions were held on May 29, 2009
regarding the lighting and sound designs. Staff has received the 60% plans on July 31,
2009 and addressed these plans at the September 1, 2009 staff review. Aesthetic
Review of this project was conducted as part of the October 6, 2009 staff review
meeting. Staff is awaiting the resubmittal of the aesthetic review documents in
response to the October 6, 2009 review. Final staff reviews of the aesthetics and final
engineering were held on December 8, 2009. Staff awaits the final engineering and
aesthetic plan re- submittal for the City Commission. Also, the trail swap is being
delayed because the State wants to bundle the Magnolia Park Trailhead and the Bart
Phillips trail right -of -way dedication along SR 419 together. Staff is working to resolve
these items. The final engineering /site plan and aesthetic review received Commission
approval at the March 22, 2010 Commission. The Lien Satisfaction Agreement has
been executed by the both Bart Phillips and the City and will be forwarded to the City
Attorney for recordation and processing for the purpose of moving forward on the
various dedications for right -of -way and the swapping of trail right -of -way with the
Magnolia Park Amphitheater site. Discussions are underway between Mr. Phillips, the
CSX railroad, Seminole County, and the State Office of Greenways and Trails
regarding the CSX railroad crossing and the trail property swap. Seminole County is
working with CSX Railroad on the swap and City Staff is meeting with the County on
their request for some survey work. Seminole County is making application for an
easement to cross the CSX railroad with the Cross Seminole Trial. The County
submitted the application for the trail to cross in the industrial park to CSX on 7/23/10.
They expect a response within 60 days. The land swap application is on hold at the
Office of Greeneways and Trails pending receipt of the railroad crossing permit from
CSX.
October 11, 2010
Information 100
Page 7 of 10
(19) Grandeville at Town Center (f /k/a Villa Grande &. Grandville) — Staff is
working with the applicant to finalize revisions to the permit plans and to finalize the
address assignments for the units. A pre - construction meeting and permit issuance
should be forthcoming in the next few weeks. Staff met with the applicant on
September 29, 2008 to finalize the methodology for building valuation to be used in
assessing the appropriate building permit fees. The applicant reports renegotiating
materials prices (in light of recent price declines) in preparation for submitting for a
construction permit to do the site /civil construction and obtaining building permits.
The applicant met again with staff on December 23, 2008 and announced that, due to
the international financial crisis, they were suspending the project indefinitely. The
applicant has asked for contact information for another developer who approached the
City with a proposal for an "independent living" facility for seniors. Staff met with the
applicant on February 27 and again on April 16, 2009 to discuss options for modifying
the proposal to 144 age- restricted apartments utilizing a site plan similar to the one
previously approved. Further discussions relative to the final design and economic
development incentives for this project were scheduled for June 9, 2009, but were re-
scheduled for June 16, 2009. The applicant is currently working on financing for this
project and the City is continuing consideration of potential economic development
incentives. Staff is working with the applicant to finalize the financial package and to
finish the write up to be used in marketing the project. Staff provided a letter on
September 28, 2009 detailing the existing project status. This letter will be used as part
of the financial package for the project. Staff met with the project representative on
October 19, 2009 to discuss the schedule for consideration/approval of the project
modifications as related to the conversion of the project to age- restricted apartments.
Staff met with the applicant on January 26, 2010 once again to address applicable City
and county impact fees. Staff has also provided local demographic and recent activity
information on the Town Center to assist the developer with their HUD application.
The applicant has maintained contact with staff regarding the project. As of May 14,
2010, the developer has stated that HUD is running 90 -120 days late with their
invitations. The developer expects to hear from HUD within the next 50 -75 days and
has indicated that they will need expedited services from the City once this invitation is
received. The Developer spoke to staff on July 14, 2010 and indicated that they were
two (2) weeks away from a decision by HUD relative to their financing. If the
financing is approved, they will need to finalize all approval with 120 days. Staff
spoke to the developer on August 16, 2010 and confirmed that they are still waiting to
hear from HUD.
• Wagner's Curve (Charter School) — Staff has met with representatives proposing the
relocation of an existing charter school in Seminole County to this parcel. Concept
plans for a charter school were submitted April 28, 2010 and was the topic of a work
session with the applicant, Victor Dover, and staff on May 14, 2010. The designation
of this parcel as a civic site, subject to conditions, occurred at the June 14, 2010
Commission meeting. The conceptual plan was approved with conditions at the June
28, 2010 Commission, along with the first public hearing for the special exception.
The special exception was approved at the July 12, 2010 Commission meeting. The
Commission approved the DA at its September 13, 2010 meeting. The building
permit plans are scheduled to be submitted in late October 2010.
October 11, 2010
Information 100
Page 8 of 10
• (23) Brighthouse — The Brighthouse site plan for renovation of the 0.23 acre site on S.
Moss Road has progressed thru staff review and is scheduled for a special April 28,
2010 Planning & Zoning Board meeting. The site plan, aesthetic review, and special
permit were approved at the May 10, 2010 Commission meeting. Plan review for the
building construction is underway as of May 31, 2010. Brighthouse applied for and
was given a review of the building plans for the design professional only. They have
not yet applied for their building permit. The building permit was issued on September
15, 2010, shortly after the preconstruction conference.
• (25) Bart Phillips/ 419 Auto & Metal —On September 8, 2008, the Commission
adopted Ord. No. 2008 -11, which provided a restricted C -2 zoning for the 2 parcels
containing approximately 9.04 acres along SR 434. A revised aesthetic review package
for the perimeter wall was received December 19, 2008 and was approved at the
January 26, 2009 City Commission meeting. Vacation of the Ginger Lane and part of
the Old Sanford - Oviedo Road rights -of -way was approved at the February 9, 2009 City
Commission meeting. Staff met with the applicant's team on March 2, 2009 to discuss
the wall permit. A meeting was held with staff and the City Attorney on March 12,
2009 to discuss the Restrictive Rezoning and the Non - conforming use. Staff is
processing the building permit application for the wall for approval, subject to
conditions (e.g. recordation of easements and rezoning to either C -2 or restricted C -2).
The applicant has made application to rezone the C -1 property along SR 419 to a non-
restricted C -2 zoning in place of the restricted C -2 previously approved by the City
Commission. The new rezoning request received a recommendation for approval at the
June 3, 2009 Planning and Zoning Board meeting and Ordinance No. 2009 -10 had first
reading at the June 22, 2009 Commission meeting. Second and final reading for the
rezoning of the property along SR 419 was approved on July 13, 2009. The Building
permit for the first phase of the screen wall along the property's eastern boundary was
issued on September 28, 2009. Staff has received a request for a waiver of the front
setback along S.R. 419, behind the screen wall. A waiver for the front setback along
SR 419, behind the 10 -foot wall was approved by the City Commission on February 8,
2010. The City Attorney and staff took an ordinance to the Planning and Zoning Board
in February 2010 with proposed text amendments regarding permitted uses in the City's
I -1 Zoning District. The applicant has indicated that, in addition to the "secondary
metals recycling" operations in the proposed text amendment, he also wants the
allowance to do "recycling of non - hazardous materials ". This addition was discussed
during the Planning & Zoning Board meeting in February. First reading of the text
amendment for the I -1 zoning district the City Commission was approved at the
Commission's February 22, 2010 meeting. The applicant is in the process of
submitting a request for relief of the fines imposed by the Code Enforcement Board.
Once the Code Board makes a recommendation and an agreement between 419 Metals
and the City are finalized, this item will come back to the City Commission for second
reading. The Code Enforcement Board recommended approval of the reduction of fine
request at a special meeting on March 30, 2010. Second reading of Ordinance 2010 -03
amending the list of permitted uses in the I -1 District and the City Commission's
consideration of the Code Enforcement Lien Satisfaction Agreement received
October 11, 2010
Information 100
Page 9 of 10
Commission approval at the April 12, 2010 City Commission meeting. On April 28,
2010, Mr. Philips paid $500 necessary to satisfy the lien and submitted the executed
Lien Satisfaction document. The Lien Satisfaction Agreement was recorded on May
10, 2010. City staff is working with the County on the trail swap. No permit
applications have been received for the proposed wall.
• (26) Starlight Baptist Church — Staff met with the applicant on September 18, 2008
to discuss building construction phasing. The applicant met with the Building Official
on October 14, 2008 to discuss modifications to the building plans necessary to
implement the phasing plan. A pre- construction conference was scheduled for
December 2, 2008, but was cancelled. The architect has worked with the Building
Official on a number of building design issues. The applicant has inquired about the
initial phasing of the project. The first portion of the construction would involve the
enclosing of the existing open basketball court building to serve as an interim meeting
place during construction of the new sanctuary. The contractor and site engineer have
renewed efforts to coordinate limited site work and enclosure of the covered basketball
court with staff. A very limited plan was addressed at the October 20, 2009 staff
review. Staff met with the consultant for this project on January 14, 2010. They are
proposing to enclose the basketball court for an overflow facility as phase 1 of the
development. Staff is working with the developer on Development Agreement
language requiring sidewalks on Bahama when the City paves that Road. The
consultant indicated that the Church may be in a position to begin the construction on
the first part of the new sanctuary by the summer of 2010. Staff is working with the
applicant on the aesthetic review for the first phase of development. A limited (scaled
back) site plan revision, comprised primarily of enclosing the 5,000 SF covered area,
providing a more secluded bus parking area, a dumpster enclosure, water and sewer
connections, and sidewalks along the adjacent ROWs was received and was addressed
at the March 2 staff review. The aesthetic review and final engineering for Phase I of
the project were approved at the April 26, 2010 Commission. A preconstruction
conference was held on April 27, 2010. As of June 7, 2010, building plans are under
review by the building department. The building department has completed their
review of the construction plans and comments have been sent to the contractor for
response. On July 28, 2010, staff received an electronic letter from the contractor,
requesting the sidewalk requirement (comprehensive plan and development agreement)
along Bahama Road be rescinded. Comments have been sent and received on the
building permit. The second review comments from the fire department have been
received and the permit is undergoing final review by the building division. Staff is
awaiting the final fire department comments.
• (28) Park Manor Academy — Having obtained a conditional use and a waiver from
the building setback requirements, the applicant has submitted a combined preliminary
and final engineering plan submittal for the proposed 3,459 SF day care /pre - school
facility with 13 parking spaces, located at the SE end of Excelsior Parkway. The
project was addressed at the May 5, 2009 staff review. A plan resubmittal was received
July 17, 2009 and has been reviewed by applicable staff. Staff awaits revised plans
from the design engineer. A response to staff's comments was received on December
30, 2009. The final engineering /site plan (along with aesthetic review) was approved at
October 11, 2010
Information 100
Page 10 of 10
the February 22, 2010 Commission. A preconstruction conference was held and site
work commenced on March 25, 2010. Building plans have not been submitted as of
July 2, 2010. No additional updates are available on this project.
Bus Stop Shelters Lynx bus stop shelters are currently being installed along SR 434
within the City. Plans include nine (9) of these shelters within the City.
FISCAL IMPACT: There is no fiscal impact associated with this agenda item.
COMMUNICATION EFFORTS: No communication efforts beyond the advertising of the
Commission agenda are necessary in conjunction with this agenda item. Items which have
not and do not appear likely to generate any change were dropped from this (October 11,
2010) agenda item.
RECOMMENDATION: The City Commission is being asked to review and accept the
information in this agenda item.