Loading...
HomeMy WebLinkAbout2026 06 08 Consent 303 - Wetland Park Outfall Improvement at the Cross Seminole Trail and Micheal Blake Blvd - Change Order No. 3CONSENT AGENDA ITEM 303 CITY COMMISSION AGENDA | JUNE 8, 2026 REGULAR MEETING TITLE Wetland Park Outfall Improvements at the Cross Seminole Trail and Michael Blake Boulevard - Change Order No. 3 SUMMARY The overall project scope of work for this proposal includes professional services to supplement the previous work efforts and authorizations summarized below: O riginal P roposal – F inal Design and Permi*ng Services issued on J anuary 11, 2023. C hange O rder #1 – A ddi3onal Final D esign and Permi*ng S ervices S ubmi4ed on October 17, 2023. C hange O rder #2 – A ddi3onal Final D esign and Permi*ng S ervices S ubmi4ed on February 24, 2025. O n S eptember 5, 2024, Pegasus E ngineering submi4ed an applica3on to the St. Johns R iver Water M anagement D istrict (S J R W M D ) for an “I ndividual and C onceptual A pproval E nvironmental Resource Permit, a S tate 404 P rogram Permit, and Authorization to Use State-Owned Submerged Lands”. D istrict staff issued a Request for A ddi3onal Informa3on (R A I ) for A pplica3on N o. 22437-9 on October 3, 2024. B etween D ecember 27, 2024 and June 19, 2025, the applicant submi4ed five requests for 90-day time extensions. A request to officially withdraw the applica3on was submi4ed on S eptember 15, 2025 and approved by D istrict staff on O ctober 6, 2025. T he proposed drainage improvements between Tuskawilla Road and Wetland Park were revised following mul3ple coordina3on mee3ngs with S eminole C ounty representa3ves. As part of this effort, the horizontal alignment was shiGed westward to reduce jurisdic3onal impacts within Wetland Park. A ddi3onally, design modifica3ons were also dictated by a S eminole County ordinance prohibi3ng u3li3es from running parallel to mul3-use trails, limiting the alignment to orthogonal crossings only. O n February 10, 2026, Pegasus E ngineering submi4ed a new applica3on to the S t. Johns River Water Management District (SJRWMD) for an “Individual and Conceptual Approval Environmental Resource Permit, a State 404 P rogram Permit, and A uthoriza3on to Use State-Owned Submerged Lands”. 424 D istrict staff issued a Request for A ddi3onal Informa3on (R A I ) for A pplica3on N o. 22437-10 on March 10, 2026. The D istrict ’s pending R A I le4er, provided within E xhibit “D ”, includes a total of 16 comments encompassing both engineering and ecological issues. The current change order includes out of scope work efforts pertaining to: S J R W M D E R P permi*ng efforts including wetland mi3ga3on; an A pplica3on for U se of S tate O wned U plands submi4ed to the F lorida D epartment of P rotec3on (F D E P ) B ureau of S tate Lands – Bureau of Public Land Administration; and Limited Post-Design Services. FUNDING SOURCE This is currently budgeted in Third Generation Sales Tax under City Wide Stormwater Improvements (Wetlands Park). Pegasus Engineers will provide these engineering services to the City under the terms of the Agreement for Continuing Civil Engineering Services – Road and Transportation Facilities, Stormwater Engineering and Flood Control that will be reinstated retroactively for the limited purpose of approving, performing, and completing this Task Order. RECOMMENDATION S taff requests C ity C ommission approval of Wetland Park O uKall Improvements at the C ross S eminole Trail and M ichael B lake B oulevard - Change Order N o. 3 for modified professional consultant services in the amount of $89,800.00 425 “Engineering a Higher Standard” 301 West State Road 434, Suite 309, Winter Springs, FL 32708  407-992-9160  Fax 407-358-515 May 21, 2026 P-229701 Mr. Clete Saunier, P.E. Director of Public Works and Utilities 400 Old Sanford Oviedo Road Winter Springs, Florida 32708 csaunier@winterspringsfl.org Re: Wetland Park Outfall Improvements at the Cross Seminole Trail and Michael Blake Boulevard Subj: Change Order #3 – Final Design and Permitting Services Dear Clete: In follow-up to our previous discussions, we are pleased to submit the following documents that comprise a change order proposal for the above referenced project pursuant to the requirements of the City’s Master Agreement for Continuing Engineering Services – Road and Transportation Facilities, Stormwater Engineering and Flood Control:  Exhibit "A" (Scope of Work);  Exhibit “B” (Manhour and Fee Estimate);  Exhibit "C" (Sub-consultant Proposals); and  Exhibit "D" (Relevant SJRMWD correspondence). We look forward to finalizing this important assignment for the City of Winter Springs. If you have any questions regarding the enclosed documents, please contact me at 407-992-9160, extension 309 (office), 407-247-0003 (cell), or by e-mail at david@pegasusengineering.net. Sincerely, PEGASUS ENGINEERING, LLC David W. Hamstra, P.E., CFM Stormwater Department Manager cc: Greg Teague, Pegasus Engineering 426 Mr. Clete Saunier May 21, 2026 Page 2 Wetland Park Outfall Improvements at the Cross Seminole Trail and Michael Blake Boulevard Change Order #3 Final Design and Permitting Services Approved for Pegasus Engineering, LLC _______________ _____ Principal May 21, 2026 Fursan Munjed, P.E. Officer’s Title Date This proposal is hereby accepted and authorization to proceed is hereby given. (Please return one executed copy of this proposal for our Pegasus Engineering records). _______________ _____ __________________ Authorized Signature Officer’s Title Date 427 WETLAND PARK OUTFALL IMPROVEMENTS AT THE CROSS SEMINOLE TRAIL AND MICHAEL BLAKE BOULEVARD CHANGE ORDER #3 – FINAL DESIGN AND PERMITTING SERVICES Scope of Work 428 WETLAND PARK OUTFALL IMPROVEMENTS AT THE CROSS SEMINOLE TRAIL AND MICHAEL BLAKE BOULEVARD CHANGE ORDER #3 – FINAL DESIGN AND PERMITTING SERVICES A-1 P-229701 The scope of work for this proposal includes professional services to supplement the previous work efforts and authorizations that are summarized below.  Original Proposal – Final Design and Permitting Services Purchase Order No. 2023-00000494 issued on January 11, 2023  Change Order #1 – Additional Final Design and Permitting Services Submitted on October 17, 2023  Change Order #2 – Additional Final Design and Permitting Services Submitted on February 24, 2025 On September 5, 2024, Pegasus Engineering submitted an application to the St. Johns River Water Management District (SJRWMD) for an “Individual and Conceptual Approval Environmental Resource Permit, a State 404 Program Permit, and Authorization to Use State- Owned Submerged Lands”.  District staff issued a Request for Additional Information (RAI) for Application No. 22437-9 on October 3, 2024.  Between December 27, 2024 and June 19, 2025, the applicant submitted five requests for 90-day time extensions.  A request to officially withdraw the application was submitted on September 15, 2025 and approved by District staff on October 6, 2025. The proposed drainage improvements between Tuskawilla Road and Wetland Park were revised following multiple coordination meetings with Seminole County representatives. As part of this effort, the horizontal alignment was shifted westward to reduce jurisdictional impacts within Wetland Park. Additionally, design modifications were also dictated by a Seminole County ordinance prohibiting utilities from running parallel to multi-use trails, limiting the alignment to orthogonal crossings only. 429 WETLAND PARK OUTFALL IMPROVEMENTS AT THE CROSS SEMINOLE TRAIL AND MICHAEL BLAKE BOULEVARD CHANGE ORDER #3 – FINAL DESIGN AND PERMITTING SERVICES A-2 P-229701 On February 10, 2026, Pegasus Engineering submitted a new application to the St. Johns River Water Management District (SJRWMD) for an “Individual and Conceptual Approval Environmental Resource Permit, a State 404 Program Permit, and Authorization to Use State- Owned Submerged Lands”.  District staff issued a Request for Additional Information (RAI) for Application No. 22437-10 on March 10, 2026.  The District’s pending RAI letter, provided within Exhibit “D”, includes a total of 16 comments encompassing both engineering and ecological issues. The current change order includes out of scope work efforts pertaining to: SJRWMD ERP permitting efforts including wetland mitigation; an Application for Use of State Owned Uplands submitted to the Florida Department of Protection (FDEP) Bureau of State Lands – Bureau of Public Land Administration; and Limited Post-Design Services. Pegasus Engineering, LLC (Consultant), shall provide the engineering services as itemized on the Manhour and Fee Estimate provided as Exhibit “B”. It should be noted that this change order includes only new task assignments, expanded task assignments and sub-consultant services that are intended to supplement the previous authorization. Referring to the information provided within Exhibit “C”, the scope of work for this change order will require additional sub-consultant services as discussed below. Survey Sub-consultant ................................................................................ Reserve Geospatial 1. Legal sketches and descriptions were not a part of any of the previous authorizations. Two (2) easement documents were needed to accompany the FDEP application for use of State Owned Uplands. 2. A survey allowance has been included and will be utilized only if the ecological sub- consultant (GAI) establishes seasonal high water (SHW) levels by setting survey nails during additional field meetings with SJRWMD representatives. Ecological Sub-consultant ....................................................................... GAI Consultants (GAI) 1. Although a previous change order included preparation of an Ecological Assessment Report (EAR) for Wetland Park along with limited permitting assistance, the current change order expands the scope to address the pending SJRWMD RAI comments, including additional work efforts specific to wetland impacts and mitigation. 430 WETLAND PARK OUTFALL IMPROVEMENTS AT THE CROSS SEMINOLE TRAIL AND MICHAEL BLAKE BOULEVARD CHANGE ORDER #3 – FINAL DESIGN AND PERMITTING SERVICES A-3 P-229701 Structural Sub-consultant ............................................... Florida Bridge & Transportation (FBT) 1. Although a previous change order included structural engineering and design services for the proposed sheet pile wall, the current change order expands the scope to include post-design services. The conditions and assumptions contained within the scope of work for the original proposal and the previous change orders are also applicable to the current change order proposal but will not be reiterated herein. The following conditions and assumptions are noted as additional qualifications to this change order proposal. 1. This proposal does not include the following professional services. In the event that any of these services are required in the future, it is assumed that an amendment will be processed to encompass those additional services.  Permit application fees.  Costs for purchasing wetland mitigation credits. 2. Contingency allowances if included in the fee estimate may or may not provide sufficient monies to complete the intended work in totality. If the assumed budget is insufficient, it is assumed that an amendment will be processed to encompass those additional services. Alternatively, and in lieu of a contract amendment, work will only continue until such time that the budgeted contingency is exhausted. 431 WETLAND PARK OUTFALL IMPROVEMENTS AT THE CROSS SEMINOLE TRAIL AND MICHAEL BLAKE BOULEVARD CHANGE ORDER #3 – FINAL DESIGN AND PERMITTING SERVICES Manhour and Fee Estimate 432 Task Description (See Note 1 Below)Department Project Sr. Project CADD Admin. (Effective Date : May 21, 2026)Manager Manager Engineer Technician Assistant Hourly Rate $177.91 $177.91 $161.46 $95.68 $74.75 A Additional Project Administration 0.0 $0.00 A1 => Prepare and issue the sub-consultant NTP letters and contract agreements 2.0 2.0 4.0 $505.32 A2 => Coordinate with the sub-consultants 2.0 2.0 $355.82 A3 => Perform sufficiency reviews of the preliminary sub-consultant deliverables 4.0 4.0 $711.64 A4 => Up to two (2) additional meetings with City staff or other interested parties 6.0 6.0 $1,067.46 A5 => QA/QC the final project deliverables 8.0 8.0 $1,291.68 A6 => Monthly status reports via invoices 6.0 6.0 12.0 $1,515.96 B Additional Construction Plans 0.0 $0.00 B1 => Cover Sheet 0.0 $0.00 B2 => General Notes 0.0 $0.00 B3 => Drainage Map 0.0 $0.00 B4 => Topographic Survey (by others) 0.0 $0.00 B5 => Topographic Survey (by others) 0.0 $0.00 B6 => Topographic Survey (by others) 0.0 $0.00 B7 => Topographic Survey (by others) 0.0 $0.00 B8 => Topographic Survey (by others) 0.0 $0.00 B9 => Topographic Survey (by others) 0.0 $0.00 B10 => Topographic Survey (by others) 0.0 $0.00 B11 => Overall Project Plan and Key Sheet 0.0 $0.00 B12 => Plan and Profiles - Cross Seminole Trail 0.0 $0.00 B13 => Plan and Profiles - Cross Seminole Trail 0.0 $0.00 B14 => Plan and Profiles - Michael Blake Boulevard 0.0 $0.00 B15 => Plan and Profiles - Michael Blake Boulevard 0.0 $0.00 B16 => Plan and Profiles - Michael Blake Boulevard 0.0 $0.00 B17 => Plan and Profiles - Michael Blake Boulevard 0.0 $0.00 B18 => Cross Section - Cross Seminole Trail 8.0 2.0 12.0 22.0 $2,894.36 B19 => Cross Section - Michael Blake Boulevard 8.0 2.0 12.0 22.0 $2,894.36 B20 => Wetland and Other Surface Water Impacts 6.0 2.0 6.0 14.0 $1,964.46 B21 => Drainage Structure Details - Cross Seminole Trail 0.0 $0.00 B22 => Drainage Structure Details - Cross Seminole Trail 0.0 $0.00 B23 => Drainage Structure Details - Michael Blake Boulevard 0.0 $0.00 B24 => Drainage Structure Details - Michael Blake Boulevard 0.0 $0.00 B25 => Miscellaneous Details 0.0 $0.00 B26 => Temporary Erosion Control Details 0.0 $0.00 B27 => Sheet Pile Structural Engineering Plan (by others) 0.0 $0.00 Task Hours Task Fees Red text was used to indicate the new and/or additional plan sheets that were not included in the original authorization or previous change orders. Wetland Park Outfall Improvements at the Cross Seminole Trail and Michael Blake Boulevard Final Design and Permitting Services Page 1 P-229701 433 Task Description (See Note 1 Below)Department Project Sr. Project CADD Admin. (Effective Date : May 21, 2026)Manager Manager Engineer Technician Assistant Hourly Rate $177.91 $177.91 $161.46 $95.68 $74.75 Task Hours Task Fees Wetland Park Outfall Improvements at the Cross Seminole Trail and Michael Blake Boulevard Final Design and Permitting Services C Additional SJRWMD Permitting - Environmental Resource Permit (ERP) Application 0.0 $0.00 C1 => Prepare and submit an ERP application to the SJRWMD 16.0 6.0 4.0 26.0 $4,198.04 C2 => Address RAI comments from the SJRWMD (assume one round) 2.0 16.0 6.0 4.0 4.0 32.0 $4,852.86 D FDEP Permitting - Application for Use of State Owned Uplands 0.0 $0.00 D1 => Coordinate with County staff regarding the Cross Seminole Trail 2.0 4.0 2.0 8.0 $1,390.38 D2 => Prepare a "draft" Written Statement from the Managing Agency (Seminole County) 2.0 2.0 $355.82 D3 => Delineate the proposed easements and prepare figures 4.0 2.0 6.0 12.0 $1,608.64 D4 => Coordinate with the survey sub-consultant (legal sketches and descriptions) 2.0 2.0 $355.82 D5 => Coordinate with City staff regarding a City Commission Resolution 2.0 2.0 $355.82 D6 => Fill out the application and prepare a supporting narrative 8.0 4.0 12.0 $2,069.12 D7 => Update the construction plans to show the new upland easements 3.0 6.0 9.0 $1,107.81 D8 => Coordinate with FDEP representatives 6.0 3.0 9.0 $1,551.84 D9 => Prepare responses to one (1) Request for Additional Information (RAI) 2.0 8.0 4.0 4.0 2.0 20.0 $2,957.16 E Bid Documents 0.0 $0.00 E1 => Finalize the construction cost estimate 6.0 2.0 8.0 $1,390.38 E2 => Prepare a bid schedule 2.0 2.0 $355.82 E3 => Prepare Special Provisions, Supplemental Specifications, and Special Bid Items 24.0 6.0 4.0 34.0 $5,537.60 E4 => Meet with City staff to discuss comments for the bid documents 2.0 2.0 $355.82 E5 => Prepare and transmit final bid documents 8.0 4.0 8.0 20.0 $2,834.56 F Limited Post-Design Services 0.0 $0.00 F1 => Prepare for and attend the pre-construction meeting 3.0 3.0 $533.73 F2 => Review and process shop drawings 0.0 $0.00 - Temporary erosion control plan and pollution control details 2.0 2.0 $355.82 - Precast drainage structures 8.0 2.0 10.0 $1,746.20 - Precast drainage pipes 2.0 2.0 $355.82 - Concrete mix designs 4.0 4.0 $711.64 - Superpave asphalt 2.0 2.0 $355.82 - Sheet pile (by others) 2.0 2.0 $355.82 F3 => Review and process up to three (3) shop drawing resubmittals 6.0 6.0 $1,067.46 F4 => Address the Contractor's RFIs during construction 2.0 16.0 6.0 6.0 30.0 $4,745.22 F5 => Prepare for and attend up to four (4) on-site meetings during construction 4.0 4.0 $711.64 F6 => Review and approve the Contractor's payment applications 12.0 4.0 16.0 $2,780.76 F7 => Review and approve up to two (2) change order submittals 8.0 2.0 10.0 $1,746.20 F8 => Conduct up to four (4) engineering inspections to monitor construction progress 8.0 8.0 $1,423.28 F9 => Prepare for and participate in the substantial completion inspection and provide "punch-list" 4.0 2.0 6.0 $1,067.46 F10 => Prepare for and participate in the final inspection 2.0 2.0 $355.82 F11 => Review the signed and sealed as-built survey 3.0 3.0 $533.73 Page 2 P-229701 434 Task Description (See Note 1 Below)Department Project Sr. Project CADD Admin. (Effective Date : May 21, 2026)Manager Manager Engineer Technician Assistant Hourly Rate $177.91 $177.91 $161.46 $95.68 $74.75 Task Hours Task Fees Wetland Park Outfall Improvements at the Cross Seminole Trail and Michael Blake Boulevard Final Design and Permitting Services F12 => Prepare record drawings 8.0 2.0 4.0 14.0 $2,128.92 F13 => Assemble a compendium of construction documentation 8.0 2.0 10.0 $1,746.20 F14 => Prepare an Engineer's Certification of Completion 2.0 2.0 $355.82 TOTAL LABOR HOURS 45.0 224.0 71.0 72.0 18.0 430.0 - - TOTAL LABOR COSTS $8,005.95 $39,851.84 $11,463.66 $6,888.96 $1,345.50 - - $67,555.91 PERCENT BREAKDOWN (HOURS) 10.5% 52.1% 16.5% 16.7% 4.2% 100.0% - - NOTES:1. Pegasus Labor Fees = 2. Other Direct Costs = 1. Refer to the proposal scope of work for additional discussions and qualifications. 3. Survey Sub-consultant - Reserve Geospatial = 2. Permit application fees are not included. 4. Getoechnical Sub-consultant - N/A = 3. Costs for purchasing wetland mitigation credits are not included. 5. Ecological Sub-consultant - GAI Consultants = 6. Structural Sub-consultant - FBT = TOTAL FEES = - - $15,000.00 $89,800.00 $67,555.91 $148.19 $1,100.00 $5,995.90 Page 3 P-229701 435 WETLAND PARK OUTFALL IMPROVEMENTS AT THE CROSS SEMINOLE TRAIL AND MICHAEL BLAKE BOULEVARD CHANGE ORDER #3 – FINAL DESIGN AND PERMITTING SERVICES Sub-consultant Proposals 436 (Reserve Geospatial) 437 Page 1 of 2 CLIENT INFORMATION: February 14, 2026 Gregory Teague, PE, CFM Pegasus Engineering, LLC 301 West State Road 434, Suite 309 Winter Springs, FL 32708 407-992-9160 greg@pegasusengineering.net PROJECT INFORMATION: Wetland Park Outfall Improvements Tuskawilla Road at Cross Seminole Trail Section 31, Township 20 South, Range 31 East, Seminole County, Florida SCOPE OF WORK: Provide surveying service to meet the Standards of Practice as outlined by the Florida Board of Professional Land Surveyors in Chapter 5J-17 FAC, Section 472.027 of the Florida Statutes, to include the following: Sketch & Description 1. Prepare new descriptions for two (2) proposed easement areas. 2. Prepare a Sketch of Description for recording in the Public Records of Seminole County. DELIVERABLES: Provide signed and sealed documents. TIMELINE: Anticipated delivery will be two (2) weeks after notice to proceed authorization and return of signed scope letter. COMPENSATION: Our fee for the above-referenced work will be as follows: Sketch & Description $ 1100.00 PAYMENT: Payment is due thirty (30) days from the date of the invoice. 438 Gregory Teague, P.E., CFM Wetland Park Outfall Improvements February 14, 2026 Page 2 of 2 We appreciate the opportunity to provide these surveying services to you. Ryan Johnson, PSM AUTHORIZATION: If you agree with the terms outlined in this Scope of Work, please have an authorized person sign below and send to rjohnson@reservegeo.com to serve as official notice to proceed. I have read and accept the Scope of Work as outlined hereon. Signature Date Printed Name Title (if any) 439 (GAI Consultants) 440 GAI CONSULTANTS, Inc. Change Order for Professional Services 03/2026 GAI_Pegasus_Wetland Park Change Order 001_Scope_and_Agreement_2026.doc | 1 of 2 Project Number: R250349.00 Change Order Number: 001 Project Name: Wetland Park Outfall Improvements Project Location (City, County, State): City of Winter Springs, Seminole County, Florida The terms and conditions of the Agreement for Professional Services, dated April 8, 2025, (hereinafter referred to as ) between Pegasus Engineering, LLC, (h ) and GAI Consultants, Inc. (GAI ) will govern the performance of the services described in this Change Order Number 001 (hereinafter referred to as CHANGE ORDER ). Project Description: The Project Owner is proposing drainage improvements along the east side of the Cross Seminole Trail to re-direct the existing discharge south towards the center of Wetland Park. Drainage improvements are also proposed along the west side of Michael Blake Boulevard to convey stormwater runoff from the north end of Wetland Park to the existing south outfall. GAI is providing wetland, listed species, and permitting support to the CLIENT. Due to changes to the project design, withdrawal of the original permit application, and subsequent re-submittal of permit applications, additional field work and agency coordination by GAI will be necessary to address regulatory agencies concerns regarding the project. GAI Scope of Services: GAI will perform the following services under this CHANGE ORDER. GAI will conduct an additional field visit to refresh sections of the BDA wetland delineation not previously reviewed by GAI and regulatory agency staff. GAI will attempt to set three (3) Seasonal High-Water Elevations within the wetland. The location and elevation of these points will need to be field-located by the Project Surveyor. GAI will conduct and additional regulatory site visit with representatives of the St. Johns River Water Management District (District). Should District staff require the location of flags to be field-adjusted, these new flag points will need to be field-located by the Project Surveyor. GAI will respond to District Request for Additional Information and assist the CLIENT with responding to District RAI questions. As noted above, changes to the wetland limits and the location and elevation of the SHWE points will need to be field-located by the Project Surveyor. Schedule: Pursuant to the provisions of the AGREEMENT between GAI and CLIENT, GAI shall commence work upon receipt of a copy of this CHANGE ORDER executed by CLIENT. GAI shall endeavor to complete its services under this CHANGE ORDER within 180 days, subject to excused delays Compensation: Compensation for services rendered by GAI under this CHANGE ORDER shall be in accordance with the rates agreed to and incorporated into the AGREEMENT between GAI and CLIENT. under this CHANGE ORDER is $,.0. A breakdown by task is included on the attached Excel spreadsheet. Assumptions and Understandings: following assumptions and understandings: 1) Access to the project site(s) upon which GAI is to conduct its field work will be available to GAI personnel at the time this CHANGE ORDER is authorized. All exploration locations shall be cleared of buried utilities/piping/structures by Client. 2) CLIENT CHANGE ORDER at the time this CHANGE ORDER is authorized. 3) CLIENT information/topo information, etc. at the time this CHANGE ORDER is authorized. Unless otherwise noted, GAI may rely upon such information. 4) CLIENT will give GAI prompt notice whenever it observes or otherwise becomes aware of any development that affects 441 GAI CONSULTANTS, Inc. Change Order for Professional Services 03/2026 GAI_Pegasus_Wetland Park Change Order 001_Scope_and_Agreement_2026.doc | 2 of 2 5) CLIENT will examine and provide comments and/or decisions with respect to any GAI interim or final deliverables within a period mutually agreed upon. 6) Any of CLIENT manner. 7) CHANGE ORDER within 45 days. If authorization to proceed is not received within 45 days, GAI reserves the right to revise its compensation. REQUESTED AND AUTHORIZED BY OFFERED AND AGREED BY PEGASUS ENGINEEERING, LLC GAI CONSULTANTS, INC. By By Printed Name Printed Name George T. Reese Title Title Vice President Date Date Attachments: Breakdown of Compensation Specifications Drawings Other END OF CHANGE ORDER 442 Manhour Calculations GAI Consultants, Inc. 618 East South Street, Suite 700 Orlando, Florida 32801 GAI Project No: R250349.00 prepared by: DJ Silverberg R250349.00-CO-001_MNHR-25C26_r23D26.XLSX revised 23-Apr-26 PROJECT SENIOR ENVIRON. PROJECT ENVIRON. ENVIRONMENTAL DRAFTING/ SR. PROJECT TASK PRINCIPAL MANAGER SPECIALIST SPECIALIST SPECIALIST GRAPHICS COORDINATOR CLERICAL TOTALS Ecological Assessment/Permit Coordination Hrs Rate Cost Hrs Rate Cost Hrs Rate Cost Hrs Rate Cost Hrs Rate Cost Hrs Rate Cost Hrs Rate Cost Hrs Rate Cost Hrs Cost 1.1 Conduct Additional Site Review to Refresh Flags 0 190.00 0.00 0 190.00 0.00 5 190.00 950.00 4 105.00 420.00 0 105.00 0.00 0 105.00 0.00 0 85.00 0.00 0 60.00 0.00 9.0 $1,370.00 1.2 Set Seasonal High Water Elevations 0 190.00 0.00 0 190.00 0.00 4 190.00 760.00 4 105.00 420.00 0 105.00 0.00 0 105.00 0.00 0 85.00 0.00 0 60.00 0.00 8.0 $1,180.00 1.3 Schedule/Conduct Additional Site Review with SJRWMD 0 190.00 0.00 0 190.00 0.00 5 190.00 950.00 3 105.00 315.00 0 105.00 0.00 0 105.00 0.00 0 85.00 0.00 0 60.00 0.00 8.0 $1,265.00 1.4 Prepare Responses to RAIs 0 190.00 0.00 8 190.00 1520.00 0 190.00 0.00 0 105.00 0.00 0 105.00 0.00 2 105.00 210.00 0 85.00 0.00 0 60.00 0.00 10.0 $1,730.00 1.5 Coordination with Client and Owner 0 190.00 0.00 2 190.00 380.00 0 190.00 0.00 0 105.00 0.00 0 105.00 0.00 0 105.00 0.00 0 85.00 0.00 0 60.00 0.00 2.0 $380.00 Subtotal 0 0.00 10 1900.00 14 2660.00 11 1155.00 0 0.00 2 210.00 0 0.00 0 0.00 37.0 $5,925.00 TOTAL 0 0.00 10 1900.00 14 2660.00 11 1155.00 0 0.00 2 210.00 0 0.00 0 0.00 37 $5,925.00 Reimbursables Task 1.1 $5,925.00 Document Reproduction 0.00 0.00 $70.90 Mileage 2 trips to site (42mi. x 2 x 0.725)60.90 60.90 $5,995.90 Tolls 10.00 10.00 Reimbursable totals 70.90 Fees $70.90 Salary $5,925.00 Total $5,995.90 Total Labor Cost Reimbursable Cost Total Project Cost Change Order 001 Wetland Park Outfall Improvements 443 (Florida Bridge & Transportation) 444 Florida Bridge and Transportation, Inc. Structural Engineers 633 Dartmouth Street * Orlando, FL 32804 * Phone (407) 513-9709 * Fax (407) 513-9712 April 27, 2026 Mr. Greg Teague, P.E. Pegasus Engineering 301 West SR 434, Suite 309 Winter Springs, FL 32708 RE: Structural Design and Plan Sheet for Sheet Pile Wall Wetland Park Outfall, City of Winter Springs Proposal for Structural Design Services FBT Project Number 23-58.01 Dear Greg: Florida Bridge and Transportation, Inc. (FBT) is pleased to submit this proposal to PEGASUS for engineering services for the above referenced project. The scope of design services for this work order includes the following: 1) Design and Plan Production: FBT will provide the structural design and plan sheets for the proposed sheet pile walls per the concept shown in the plan provided by Pegasus. It is assumed the sheet pile walls will be cantilever walls (not braced or anchored). FBT will provide design and details for the sheet pile and the concrete coping with railing. The railing will be a standard railing from FDOT Standard Indexes and no custom modifications are included. It is assumed the exposed portions of the sheet pile will be coated with standard coal tar epoxy (black), and special coating systems and colors will not be required. Wall control drawings will not be provided (wall geometry will be shown in Pegasus’ plans). The plans and calculations will include one custom design with details for the “short sheets” which will be required to span across an obstruction such as a utility or other buried element. 2) Meetings, Specifications and Cost Estimates: FBT will attend one status meeting (if required) with the City staff and Pegasus. The project specifications will consist of the FDOT Standard Specifications for Road and Bridge Construction, and supplemental specifications are not anticipated or included. FBT will provide one estimate of probable construction cost for the structural items. FBT will assist Pegasus develop a bid schedule for the structural items. 3) The project deliverables will consist of 100% and signed and sealed “final” plans and structural calculations. We understand the final deliverables may include 24x36 sheets. The reprographic cost for FBT’s portion of the project is included in the fee below. We propose a total lump sum fee of $15,000.00 for all FBT's basic structural engineering services indicated above. The work will be invoiced monthly on a percent complete basis. If the work is stopped by PEGASUS or others for any reason before completion, FBT will be reimbursed for the hours expended up to that point at an average hourly rate of $165 per hour. 445 Greg Teague April 27, 2026 Sheet 2 of 2 FBT Winter Springs Outfall Sheet Pile Proposal 4-27-26 The scope and fee indicated above does not include the following services: • Braced or anchored wall design and details • Reinforcing steel bar list for the concrete coping • Design and detailing of custom railing (other than standard FDOT railing) • Development of site plans, permitting, utility coordination, etc. • Design or analysis of a coating system or corrosion protection • Post design services • Development of As-Built or Construction Record Drawings • Construction inspection or observation of on-going or completed construction The items indicated above, or any other services not included in the basic scope of design services described above, may be provided for an additional fee. A supplemental agreement must be negotiated prior to the additional work being performed by FBT. Additional services required for this project may be provided based on an addendum to this agreement. Fees for additional services will be addressed on a case by case basis. In order for FBT to perform these services, we will need the following information from others: • Site layout showing overall geometry with top of wall and existing/proposed grades on low side of wall • Survey at the walls including elevations, contours and topo • Geotechnical field work and design recommendations This proposal will become invalid if not executed within 90 days. We are prepared to commence the structural design services upon receipt of written notice to proceed. Very truly yours, Florida Bridge and Transportation, Inc. Mark Niedermann, P.E. Senior Vice President 446 WETLAND PARK OUTFALL IMPROVEMENTS AT THE CROSS SEMINOLE TRAIL AND MICHAEL BLAKE BOULEVARD CHANGE ORDER #3 – FINAL DESIGN AND PERMITTING SERVICES Relevant SJRWMD Correspondence 447 March 10, 2026 Clete Saunier City of Winter Springs 400 Old Sanford Oviedo Rd Winter Springs FL 32708-2617 Sent via email: csaunier@winterspringsfl.org Re: Wetland Park Outfall Improvements at the Cross Seminole Trail and Michael Blake Boulevard Application Number 22437-10 (Please reference the application number on all correspondence.) Dear Mr. Saunier: The St. Johns River Water Management District (District) has received your Individual Environmental Resource Permit application. Upon review of the proposed project, the following technical information is needed to sufficiently review the application. This information is being requested under the authority granted to the District by sections 373.413(2) and 373.4131, Florida Statutes (F.S.), and rules 62-330.054, 62-330.060, 62-330.301 and 62-330.302, Florida Administrative Code (F.A.C.). In order to expedite the review of your application, please use the application number referenced above and respond electronically through e-Permitting at sjrwmd.com/permitting or submit all requested information to the District. 1. The application fee for a project less than 10 acres with less than 1 acre of work in, on, or over wetlands or other surface waters is $1190. Please submit the required application fee online or by check made payable to the St. Johns River Water Management District. [62-330.071, F.A.C.; 40C-1.603, F.A.C.] 2. It appears a portion of the project is occurring within property owned by the Trustees of the Internal Improvement Trust Fund (TIITF) of the State of Florida. Please submit documentation as described under 4.2.3(d), Applicant’s Handbook, Volume I, such as a recorded deed or easement or a redacted contract that demonstrates the applicant’s real property interest over all land upon which the proposed activities will be conducted. [62- 330.060(3), F.A.C.] 3. Thank you for providing on your plans the jurisdictional wetland and other surface water boundaries and all proposed wetland and other surface water impact areas. In addition, please include on the plans the total acreage of all unimpacted onsite wetlands that matches the environmental assessment. [62-330.060(2), F.A.C., 62-330.301(1)(d)(f), F.A.C.; 10.0 – 10.3, A.H. Vol I] 448 Wetland Park Outfall Improvements at the Cross Seminole Trail and Michael Blake Boulevard March 10, 2026 22437-10 Page 2 of 5 4. Please provide detailed drawings on the construction plans showing typical cross- section plans of all areas to be developed adjacent to wetlands (lots, roads, and stormwater ponds, etc.). Please include in the cross sections the wetland limits, upland buffers, limits of construction (including the back slope of any proposed fill), property boundary, dimensions, slopes, existing and proposed elevations, locations of any proposed fencing and signage, and the location of erosion control measures. Additionally, please provide cross sections of: a. CS-06 out to the wetland b. From the road through MB-06 and out to wetland. [62-330.301, 62-330.302, F.A.C.; Section 10.0, A.H. Vol. I] 5. Please provide further details regarding the current condition of the temporary impact areas (CST-01) and how the area will be restored and monitored post-restoration to ensure the system is not degraded by the proposed impacts (before and after topographic surveys, vegetative monitoring, replanting of forested systems, etc). Please note, mitigation may be required for the temporal loss of function to forested systems if they are proposed for temporary impact. If temporary forested impacts are proposed, please include the location and acreage on the drawings and revise the UMAM and mitigation plan to account for these impacts. [62-330.301, 62-330.302, F.A.C. and 10.0 A.H. 6. An applicant must provide reasonable assurances that a regulated activity will not cause adverse secondary impacts to the water resource. Secondary impacts to wetlands and surface waters from adjacent development will not be considered adverse if upland buffers are maintained with a minimum width of 15 feet and an average width of 25 feet. To qualify under 10.2.7 A.H., the upland buffers must be undisturbed except for drainage structures and provide a conservation easement or other means of ensuring the buffers will remain undisturbed during construction and use of the facilities. Mitigation will be required for all secondary impacts that cannot be avoided. a. Currently, the work being performed on the northern section of Michael Blake Blvd appears to be less than 15 feet from the flagged wetland line (at flag W1-38 for example). Once the site visit is complete and a final wetland line has been approved, please demonstrate the project meets the above criteria or apply secondary impacts as appropriate. [62-330.301(1)(f), F.A.C.;10.2.7, A.H. Vol I] 7. Please demonstrate that the project, as proposed, will not adversely affect the wetlands to be preserved. Provide the elevation of the wet season water levels within the wetlands to be preserved and discuss the methodology used to determine those elevations. An adverse hydrologic impact to the wetlands will be considered a direct impact and must meet the criteria for elimination and reduction of impacts and mitigation. [62- 330.301(1)(a)(b)(d), F.A.C.; Section 10.2.2.4, A.H. Vol. I] 8. During the June 11, 2025 site visit, only a portion of the flagged wetland line was reviewed. Please contact Brian Silverman at Bsilverman@sjrwmd.com to schedule a site 449 Wetland Park Outfall Improvements at the Cross Seminole Trail and Michael Blake Boulevard March 10, 2026 22437-10 Page 3 of 5 visit to review the remaining flagged wetland boundaries and evaluate the seasonal high water elevations in the on-site wetlands or other surface waters. Please note that if staff determines that additional wetlands or other surface waters will be impacted, additional environmental information may be needed, and the project must meet the review criteria as described in Section 10.0 of the Applicant’s Handbook (Environmental Criteria). [62- 330.301, F.A.C., 62-330.302, F.A.C.; 10.0 A.H. Vol I] 9. If the wetland or surface boundaries are changed during the site inspection or if new wetlands are identified, please update the environmental report and the signed and sealed construction plans to reflect the revised wetland line, the location and acreage of all wetlands and other surface waters, as well as the location and acreage of all wetland and other surface water impacts, both direct and secondary. [62-330.060(2), 62- 330.301(1)(d)(f), F.A.C.; Section 10.0 – 10.3, A.H. Vol. I] 10. Mitigation will be required for all direct and secondary wetland impacts. The applicant is proposing mitigation via the purchase of credits at a mitigation bank. After the wetland impacts and UMAM scores have been approved, please provide a complete mitigation plan including the proposed bank, the type of credits proposed, and the number of credits proposed. Once the mitigation plan is approved, please a provide a letter from the mitigation banker verifying the number of credits that have been reserved, sold or transferred to the permit applicant and requesting that the credits be withdrawn from the bank upon the issuance of the applicant’s District permit. Please do not purchase or reserve credits before the District approves a mitigation plan. [10.3.1 A.H., Vol. 1 and 62- 330.301 and 62-330.302, F.A.C.] The letter should include: a. Project Name and Permit/Application Number b. Number of credits reserved, sold, or transferred c. Type of credits reserved, sold, or transferred d. Phase the credits are to be withdrawn from e. Basin the credits are to be withdrawn from 11. According to Audubon Florida Eagle Watch Nest Map a bald eagle nest (SE096) is located on site just south of the proposed discharge structures on the Cross Seminole Trail. Please conduct a survey in accordance with the USFWS Bald Eagle Monitoring Guidelines to determine the current status of the nest and submit this survey to the district. Please note that your project may not result in the unauthorized taking of a listed species and if the nest is occupied/active in the current season, you may be required modify your activities or the timing of certain activities within 330 ft and 660 feet of the nest, in accordance with USFWS National Bald Eagle Management Guidelines. Please demonstrate the project meets the guidelines or provide comments from the appropriate agencies that there will be no adverse impacts to bald eagles. [10.2.2 and 10.2.7, A.H. Vol I] 12. Please be advised that a copy of your permit application has been forwarded to the Florida Fish and Wildlife Conservation Commission (FWC) for review regarding your project’s potential effects on fish and wildlife, listed species and their habitat. Additional information or modifications to the plans may be requested following receipt of their comments. Please note that an applicant must provide reasonable assurances that a regulated activity will not impact wetland and other surface water functions and cause adverse impacts to the habitat of fish, wildlife, and listed species or to the abundance 450 Wetland Park Outfall Improvements at the Cross Seminole Trail and Michael Blake Boulevard March 10, 2026 22437-10 Page 4 of 5 and diversity of fish, wildlife and species having special protection that use upland habitats for nesting and denning. [10.2.2, 10.2.8, A.H.] 13. Calculations Tables 4 and 5 (pgs. 155 & 156/372) do not appear to include peak stage or discharge data for the “OUTFALL” node. Please provide data for the system outfall in the tables. [62-330.060, 62-330.301(1)(a)(b)(c), F.A.C.; Part 3 A.H. Vol II] 14. Calculations Table 4 (Pg. 155/372) appears to indicate that the system stages above critical elevations at several locations in the proposed conditions. Please clarify and demonstrate that the proposed project will not result in adverse water quantity or quality impacts. [62-330.060, 62-330.301(1)(a)(b)(c)I, F.A.C.; Part 3 A.H. Vol II] 15. Calculations Table 7 appears to demonstrate that peak discharge from the outfall in the proposed condition exceeds previously permitted discharge rates for the mean annual storm event. Please clarify and demonstrate that the proposed project will not result in adverse water quantity or quality impacts. [62-330.060, 62-330.301(1)(a)(b)(c)I, F.A.C.; Part 3 A.H. Vol II] 16. Please demonstrate that the project meets the applicable nutrient performance criteria in Sections 8 and 9, A.H. Vol. I. [62-330.060, 62-330.301I, F.A.C.; Sections 8, 9, A.H. Vol. I] Please note, per District rules, you have 90 days to respond to this RAI letter. An automated courtesy reminder email will be sent to you on day 80 if you have not yet submitted a formal response to this RAI letter. Please be aware, suggestions or other direction provided by District staff are offered to assist applicants in complying with District rules. However, applicants bear the burden of demonstrating that their application meets the applicable rule requirements. Although District staff may provide suggestions to applicants that would allow staff to recommend approval of an application to the District’s Executive Director or 4elegate, the final decision regarding the approval of a permit application is up to the District’s Executive Director or 4elegate. If an application is recommended for substantive denial, the application will be scheduled for consideration by the District’s Governing Board. Applicants are hereby advised the Governing Board and the Executive Director or 4elegate are not bound by previous statements or recommendations of District staff regarding an application. If the applicant desires to dispute the necessity for any information requested on an application form or in a letter requesting additional information, he or she may, pursuant to section 373.4141, F.S, and section 5.5.3.6, Environmental Resource Permit Applicant’s Handbook Volume I (ERP A.H. Volume I) request that District staff process the application without the requested information. If the applicant is then unsatisfied with the District’s decision regarding issuance or denial of the application, the applicant may request a section 120.569, F.S. hearing pursuant to chapter 28-106 and rule 40C-1.1007, F.A.C. Please be advised that under section 5.5.3.5, ERP A.H. Volume I, the applicant has 90 days from the date the District makes a timely request for additional information to submit that information to the District. If an applicant requires more than 90 days to respond, it must notify the District in writing of the circumstances, at which time the application shall remain in active status for one additional period of up to 90 days. The District will grant additional extensions for 451 Wetland Park Outfall Improvements at the Cross Seminole Trail and Michael Blake Boulevard March 10, 2026 22437-10 Page 5 of 5 good cause shown by the applicant. A showing that the applicant is making a diligent effort to obtain the requested additional information, and that the additional time period is both reasonable and necessary to supply the information will be considered good cause. In such case, the District will grant a specified amount of additional time. If the applicant chooses not to, or is unable to, respond to the request for additional information within the above time frames, the application will be administratively denied. An administrative denial is not a determination of the merit of an application and does not preclude the applicant from reapplying at a later time. However, the applicant will not receive a refund of processing fees submitted, and the District will not apply those processing fees to a subsequently submitted permit application or notice. If an applicant cannot provide the information within the applicable time frames, the applicant may wish to withdraw the application in accordance with section 5.5.3.7, ERP A.H. Volume I. Please note, pursuant to Rule 62-330.020(2), F.A.C., no construction may begin on the proposed project until a permit is issued by the District. If you have any questions, please contact Brian Silverman, at (407) 215-1451 or by e-mail: Bsilverman@sjrwmd.com and Anthony Young, at (407) 215-1470 or by e-mail: AJYoung@sjrwmd.com . Sincerely, Brian Silverman Regulatory Scientist II Division of Regulatory Services Anthony Young Senior Professional Engineer Division of Regulatory Services C: Regulatory File Gregory Teague; Pegasus Engineering Sent via Email: greg@pegasusengineering.net Don J. Silverberg; GAI Consultants Sent via email: D.Silverberg@gaiconsultants.com 452