HomeMy WebLinkAbout2026 03 09 Consent 302 - Purchase of Parkson Corporation Filter Media & Rehabilitation ComponentsCONSENT AGENDA ITEM 302
CITY COMMISSION AGENDA | MARCH 9, 2026 REGULAR MEETING
TITLE
Purchase of Parkson Corporation Filter Media & Rehabilitation Components
SUMMARY
The City ’s East Wastewater Treatment Facility is experiencing challenges with its
exis"ng ter"ary filters. Emergency inspec"on by filter manufacturer (Parkson
C orpora"on) revealed that media replacement and rehabilita"on of cri"cal components
is required for successful treatment at the facility. Three op"ons for remedy were
evaluated by the contract operator, and include:
1. Media replacement and complete reconditioning of all filters.
2. Media replacement and partial reconditioning of all filters.
3. Rental of a disc filter (in lieu of using the existing sand filters).
S taff recommends O p"on #1 due to lead "me and the vendor ’s schedule to replace the
media. A lthough O p"on #1 is slightly more expensive than O p"on #2, it entails full
recondi"oning /rehabilita"on of all filter components to ensure compliant wastewater
treatment un"l the new East Facility is constructed. O p"on #3 is the most expensive
and also does not include the addi"onal construc"on cost to install the filter (as
modifications to the existing facility will be required).
Option #1 has an estimated lead time of 3-4 weeks and an associated cost of $325,000.
FUNDING SOURCE
Utilities G/L #410-36-3600-560650 - Construction in Progress
RECOMMENDATION
Staff recommends the City Commission waive the formal purchase bid requirements
due to the emergent nature of this repair and authorize Parkson Corporation to
recondition the media filter for the estimated cost of $325,000.00 plus a 10%
contingency for a total project cost of $357,500.00 Additionally, Staff recommends
authorizing the City Manager and City Attorney to prepare and execute any and all
applicable documents consistent with this agenda item.
18
Quotation
NUMBER: B01501778 Rev 4 DATE: February 26, 2026
TO: City of Winter Springs
1560 Winter Springs Blvd
Winter Springs, FL. 32708
Attn: Matt Prendergast
Cell: 321-386-7921
Email:
matthew.prendergast@woodardcurran.com
REF.: Project Name: City of Winter
Springs
Project Location: Winter Springs,
FL
Original Serial #: 150267
Parkson Corporation proposes the reconditioning of your existing DynaSand® Continuous Backwash
Sand Filters and is pleased to provide this Reconditioning Quotation for the following:
ITEM 1 DYNASAND® CONTINUOUS BACKWASH SAND FILTER(S)
# Existing Units: Eight (8) Modules
Serial Number: 150267
Model: DSF-50 SBTF
ITEM 2 PARTS
• Eighty-Eight (88) Tons of Media
• Fifty (50) Empty SuperSacks
• Eight (8) Airlifts
• Eight (8) Outer Wash Rings
• Eight (8) Outer Wash Ring Gaskets
• Four (4) Pressure Regulators
• Eight (8) Reject Weir Sets
• Four (4) Oil Water Seperators
• Four (4) Back Pressure Gauges
• Eight (8) Regulators
• All new airline hoses
ITEM 3 PARKSON SERVICE
DSF CLEANING – (labor) scope of supply:
• Removal of all necessary Grating (as required).
• Clean/Flush media from reject lines
• Pump sand/media from the Cell being worked on into storage bags.
• Drain fluid (water) from Cell.
• Inspect and clean all radial arms.
• Clean lower cones of all solids/debris.
• Adjust washer assemblies as required.
• Fill Cell with clean Plant effluent.
• Load new sand.
• Re-installation of all Grating (as required).
• Adjust regulators and flow meters as required.
• Wash filtered media overnight with clean Plant effluent.
• Open feed inlet for the Cell that has been cleaned.
19
The above process continues for all four cells
ITEM 4 OFFERINGS - BUDGET PRICE
4.A Parkson Certified On-site Reconditioning & OEM Parts Replacement…$325,000.00
USD
1. Work performed by Parkson authorized field technicians, who will test run equipment at
completion of services.
2. All parts listed in Item 2 above.
3. Parkson to supply forklift.
4. Parkson to supply crane.
5. Once all the sand is pulled out of the cells and placed in supersacks, it’s the customers
responsibility to dispose of the old sand.
6. Taxes excluded.
7. Engineering drawings excluded.
Rebuild / Start-Up Assistance - Included
Parkson will furnish one certified crew as required to recondition unit, remove and replace
components listed in item 2, provide start-up and operator training. Dates of service to be
scheduled upon receipt of Buyer’s written request.
Additional start-up service can be purchased for $1,850 per day plus travel and living
expenses.
ITEM 5 SCHEDULE, VALIDITY, PAYMENT TERMS
5.A Schedule
• Submittal Phase: Not required on this project.
• Parts availability: [8-10] weeks following receipt of acceptable written Purchase Order.
• Field/on-site rebuild is expected to occur approximately [4-6] weeks after all
replacement parts are delivered to the jobsite, subject to mutually approved
scheduling. (Prior commitments may dictate schedule variations). However, in no
event shall Parkson be the sole cause of delaying the scheduled start of the rebuild
more than [90] days after parts delivery
5.B Validity:
1. Price is valid for ninety (90) calendar days from Quotation date, for shipment of
Equipment within the timetable stated above.
5.C Payment Terms:
1. 25% with order, 65% upon shipment of parts; 10% upon rebuild completion, NTE
90 days after shipment should rebuild be delayed by other than Parkson. All
payments are NET 30 days. Payment terms for parts only without any factory labor
or field service is 100% net 30 days from shipment.
20
ITEM 6 WARRANTY, DRAWINGS & MANUALS
6.A Mechanical Warranty:
1. As defined in Section XVI (see link below under terms and conditions) Standard
Conditions of Sale, Parkson offers a one (1) year mechanical warranty for all new
parts installed on the DynaSand® Continuous Backwash Sand Filter by a) on-site
certified reconditioning.
2. Installation labor of parts or parts not ordered as part of a rebuild package have a 90-
day warranty.
6.B Drawings and Installation, Operation and Maintenance (IO&M) Manuals:
1. Approval Drawings: Not required
2. Certified Drawings: Not required
3. IO&M Manuals: Not required
TIMETABLE GUIDELINE:
Within ten (10) business days of receiving a written Purchase Order in Parkson’s office, if
necessary, Parkson will submit a written Request for Additional Information requesting items
including, but not limited to, full-scale drawings, specification sections, amendments and other
documents necessary for Parkson to begin work on this Project. No work can be done on this
project until all Additional Information is received by Parkson, thus beginning the Submittal Phase.
If you do not receive such a Request for Additional Information within the stated ten (10) business
days, then the Submittal Phase will begin on the eleventh (11th) business day following receipt of
the written Purchase Order by Parkson. The Shipment Phase is thereafter contingent upon your
final approval of all submitted Approval Drawings. Once said final approval is received by Parkson
the Shipment Phase will begin.
Once Shipment Phase is underway, manufacturing of parts will begin as stated above. After parts
are produced Project Management will call for the unit to be pulled from channel and shipped to the
Parkson factory to complete the rebuild and return with minimal out of service delay.
If the Submittal Phase is waived, the Shipment Phase will begin on receipt of all requested
Additional Information if necessary, or if not necessary, on the eleventh (11th) business day
following receipt of a written Purchase Order by Parkson.
Dates are subject to confirmation upon receipt of written Purchase Order.
TERMS AND CONDITIONS:
This Quotation is governed by and subject to Parkson’s Standard Conditions of Sale, which are
incorporated by reference and accessible at: http://www.parkson.com/files/documents/AFM-
terms.pdf
BUYER/OWNER RESPONSIBILITY UNLESS OTHERWISE STATED:
21
• Upon disassembly on site if any unforeseen parts or structural repairs are required, Parkson
Corporation will notify the customer prior to commencement of any repairs beyond original
quoted scope. The costs for these items will be added to the scope of work.
• Disposal of existing sand if replaced.
• Walkway, platforms, handrails, grating, and access ladders/stairs unless stated otherwise.
• Concrete and concrete design.
• Chemicals, chemical feed systems and instrumentation other than those detailed above.
• Automatic samplers or other test equipment and performance test.
• Unloading of parts when they arrive on site (if applicable).
• Readiness of the equipment before requesting [rebuild or start up] service. Non-readiness may
result in additional charges.
• Compatibility of equipment materials of construction with process environment.
• Electrical connection and interconnecting wiring. Controls require 10 Amps at 110V.
• Interconnecting piping.
• Any other auxiliary equipment or service not detailed above.
• Dumpster for all old parts [on site rebuild].
• Care and storage of rebuild components upon receipt at customer site.
Please return one signed copy of this quotation and Purchase Order to Parkson Corporation at the
address below. Refer to this quotation, date, and related correspondence.
Issued By: Marty Unger Accepted By: (Herein called the Buyer)
PARKSON CORPORATION
1401 West Cypress Creek Road
Fort Lauderdale, FL 33309-1969
Name: Marty Unger Name
Title: Regional Sales Manager Title:
Phone: 954-383-1757 Date:
Fax: 817-599-9725
E-Mail: munger@parkson.com
Date: February 26, 2026
Enclosures:
cc: Naim Mohammed, Miguel
22