HomeMy WebLinkAbout2004 06 14 Informational 300
COMMISSION AGENDA
ITEM 300
CONSENT
INFORMATIONAL X
PUBLIC HEARING
REGULAR
June 14, 2004
Meeting ,
.... ~ //~
MGR,{ l../" IDEPT /"".
.
Authorization
REQUEST: Community Development Department is advising the City Commission of
the status of various current planning projects.
PURPOSE: This agenda item is to update the Commission on the status of current planning
projects.
CONSIDERATION:
Badcock Shopping Center - The traffic study is being reviewed by the City's consultants and
the site plan was reviewed at the October 7,2003, DRC. The final site plans were reviewed at
the May 5, 2004, P & Z meeting and will be scheduled for the City Commission when the
proposed development agreement is reviewed by the City Attorney and any necessary
modifications are made. per 5/24/04 agenda.
Barclay Woods (Townltomes) - On the afternoon of April 30, 2004, the latest iteration of final
subdivision/engineering plan for 88 townhouse units on 7.45 acres was submitted for review.
The plans were reviewed at the May 10, 2004, City Commission meeting. A subsequent
concept plan, depicting a total of2l9 parking spaces (with no on-street parking), was reviewed
at the May 24, 2004, City Commission meeting. Revised plans have been submitted and will
be brought to the Commission as soon as staff has reviewed them. per 6/14/04 agenda
Bruster's Ice Cream - Plans for a 1,213 square foot ice cream drive-thru facility on 1.35 acres
were submitted on May 5, 2004, and were reviewed at the May 18 DRC. The site is located at
the. southeast comer of Costa Rica Drive and SR 434 and abuts Hacienda Village. Per 5/24/04
agenda
Dlutz Transmission Shop - The conditional use application, including a concept plan, was
approved by the City Commission at its April 26, 2004, meeting. per 5/1 0/04 agenda
Dr. Courtney's Office - Vertical construction continues. Storm-water and sanitary sewer lines
have been completed and inspected. Paving was completed on June 1 and the curbing is being
June 14,2004
Information Item 300
Page 2
constructed. The applicant has submitted conflicting plans for interior build-out and currently
is revising the plans. per 6/14/04 agenda
Highlands Apts., Phase II - The 42 unit apartment (3 floor) final site plan was ap~roved on
March 8, 2004. Clearing has been completed and a meeting was held on April 26t to address
the extension of potable water to the site (jack and bore in lieu of directional bore). GCI is
now making preparations for the jack and bore under Sheoah Boulevard to connect to the
City's water main. per 6/14/04 agenda
JDC Calhoun - Construction continues. Buildings 8, 9,10, 11, 12, 13, and 14 have received
certificates of occupancy (COs). Building 1 has received a temporary Certificate of
Completion and some Building No. 1 businesses are open (e.g. Tijuana Flats and the art
studio). Building 2 architectural renderings and conceptual shell building plans were approved
at the March 8, 2004, City Commission meeting. Both teams are proposed to meet on the
afternoon of May 24,2004, to review and discuss the building plans for Building 2.
City records indicate the following businesses are locating in the JDC Calhoun Town Center:
Building 1 - Tijuana Flats (restaurant), an art studio, a coffee shop, and a wine bar cafe;
Building 8 - Leslie Pool Supply, a dentist, tutor, and a tanning salon;
Building 9 - Red Bug Cleaners, E-Nails, Great Clips, and Subway;
Building 10 - Washington Mutual;
Building 11 - State Fann, H & R Block, Rachel Nicole's Salon, ShapeXpress, and a dentist;
Building 12 - Publix;
Building 13 - Winter Springs Liquors, Mailboxes, Etc., and Choice Cellular;
Building 14 - Papa Via's Take & Bake and China Feast; and
Building 15 - Wendy's.
A meeting was held on May 12, 2004, to discuss strategies for "taming" SR 434, to make it
more "pedestrian friendly." City staff and the applicable consultants (Dover Kohl & Partners,
Street Sense, Glatting-Jackson) met with the FDOT and then met with affected property
owners. per 6/14/04 agenda
Medallion Convenience Store - Final engineering/site plans were submitted for a convenience
store at the SW comer of SR 434 and Hayes Road, on March 24, 2004. This site is adjacent to
the intersection that was demonstrated to need an east-bound right-hand auxiliary turn lane.
The plans were reviewed at the April 6, 2004, DRC. per 4/26/04 agenda
Miranda - Site clearing has commenced. per 4/26/04 agenda
Moss Road Townhomes - At its April 12, 2004, meeting, the City Commission approved the
Metropolis Homes conditional use application and concept plan to build as many as 84
condominiums and commercial development on an "L" shaped 9.10 acre site fronting on both
SR 434 and Moss Road, adjacent to the Nations Bank and Victorio's Pizza. per 4/26/04
agenda
Nursery Road (Phil Reece) - The final engineering/site plan was approved at the March 8,
2004, City Commission meeting and a preconstruction meeting was held on March 30.
Construction has not yet begun. The engineer is deternlining the best route to construct the
JWle 14,2004
I nfomlation Item 300
Page 3
sanitary sewer and will submit FDEP revisions to the existing permits, to incorporate the
change. per 6/l4/04 agenda
Oak Forest Unit 7 (Triangular-shaped O.86-Acre Tract between Oak Forest & Tuskawilla
Office Park) - BJM Associates has submitted a fully executed re-plat. It has been sent to the
City's surveying consultant for review for consistency with Chapter 177, Florida Statutes and
subsequent certification. A copy ofthe plat and pertinent support documentation has been
provided to the City Attorney. Tinklepaugh Surveying reviewed and certified the plat. The
plat and supporting documents have been provided to the City Attorney for his review and
comment. per 5/24/04 agenda
Parkstone - The FLU amendment was heard by the LP A at its September 3 and October 1,
2003, meetings and had a transmittal hearing at the October 27,2003, City Commission
meeting. The Commission adopted Ordinance No. 2003-35 at the January l2, 2004, City
Commission meeting. A PUD amendment; final subdivision plan, and final plat have been
provided to the City and were reviewed at the March 9,2004, DRC. Revised plans were
resubmitted on April 23 and were reviewed at the May 4, 2004 DRC. Staff is waiting on a
traffic study modification, incorporating the AM peak traffic with the new elementary school
on SR 419. per 6/14/04 agenda
SR 434 Retail (a.k.a. Villagio) - Vertical construction continues. The final segment of the
sanitary sewer construction has been installed. Permits for wall construction are still pending.
The applicant proposes to modify the site design to include a drive-thru bank at one of the out-
buildings. per 6/14/04 agenda
Tuscawilla Square - On June 2, 2004, a preliminary site plan was submitted for Tuscawilla
Square, a restaurant and retail development on 1.41 acres at Colt Drive. The Tuscany
Restaurant currently occupies a portion of the site. The plans will be reviewed at the June 15
DRC. per 06/14/04 agenda
Winter Springs Elementary (New -located on SR 419) - Construction continues. State
Representative David Mealor, City staff, and the FDOT have been investigating ways to
provide safe access to and from the school site. per 4/26/04 agenda
Board of Adjustment - Two variance requests are scheduled for this City Commission
meeting. A conditional use for townhouses was heard at the June 3 BOA meeting and is
scheduled for the June 28 City Commission meeting. per 6/14/04 agenda
FUNDING: None required
RECOMMENDATION: None required
ATTACHMENTS: None
COMMISSION ACTION: