August 9, 2004 MGR W /DEPT ;ff'
Meeting Authorization
REQUEST: Public Works Department Requesting Authorization for a Change Order to Jones
Brothers contract with Seminole County for Trail Bridge Lighting and Fence
Upgrades.
PURPOSE: The purpose of this Board item is to request Authorization for a Change Order to Jones
Brothers contract with Seminole County for Trail Bridge Lighting and Fence Upgrades
at a cost of$129,150 and $21,600, respectively.
CONSIDERATIONS:
This agenda item is needed to provide for future lighting of the Cross Seminole Trail
bridge over S.R. 434 and also to upgrade the bridge fencing from chain link: to welded wire.
Seminole County is under contract with Jones Brothers of Lake Mary for the design build of the
trail bridge at a cost of$3,065,000. The City Commission has previously agreed to contribute
$241,687 from the 1991-2001 One Cent Sales Tax towards the construction of the bridge.
Staffhas requested costs for functional and aesthetic lighting of the trail bridge based on
the potential night time use as a key pedestrian link: in the Town Center and the desire to
highlight this feature. Seminole County considers the trail to be closed at night and does not
provide lighting for the trail. The original estimate for the bridge lighting was approximately
$280,000. This included 18 pole mounted fixtures on the bridge approach ramps, 44 bollards on
the bridge deck, and 16 uplights for the piers. Staff requested an estimate to install just the
conduit for the bridge lighting and the uplights. That quote of$129, 150 is attached. It includes
the design, labor and materials for the 16 uplights with fixtures, all conduit and puIlboxes with
pull strings, anchor bolts, and securing and sealing for the future
August 9,2004
Regular Agenda Item 504
Page 2
It is advantageous to install the conduit during construction so it can be imbedded into
the deck and curbing concrete pours. Future installation of the conduit will be more difficult and
require most of the conduit and pullboxes be exposed with no future penetrations of the bridge
beam allowed. We estimate that the bridge lighting fixtures would be installed in 5 years. The
future cost is projected to be $80,000 for the fixtures plus $80,000 for the wire and installation.
Operation and maintenance expenses are projected at $300 per month when complete.
The fencing included in the contract is chain link along both sides ofthe bridge. We
have received a quote to upgrade the fencing to a welded wire fence with black vinyl coating at
a cost of $21,600. The welded wire fence is what was used on the Conroy Road bridge over 1-
4. Staffis of the opinion the welded wire appearance is vastly superior in appearance and more
consistent with the Town Center standards than the chain link.
FUNDING:
The cost for the lighting proposal and fence ~pgrades is $129,150 and $21,600,
respectively. This expense would be eligible to be funded from the current One Cent Sales Tax.
We had originally budgeted $50,000 for pedestrian bridge upgrades. The $100,000 additional
needed for this authorization would transferred from unused funds in other projects or fund
balance of the Road Improvement Fund (115). Future capital expenses to complete the project
are projected at $160,000.
RECOMMENDATION:
It is recommended that authorization be given for a Change Order to Jones
Brothers contract with Seminole County for Trail Bridge Lighting and Fence Upgrades
at a cost of $129, 150 and $21,600, respectively, to be funded from the Road
Improvement Fund (115-65000-30019) and reimbursed by the One Cent Sales Tax.
IMPLEMENTATION SCHEDULE:
The bridge deck concrete pour is scheduled for late August. The completion of the
bridge is projected for December 15th.
ATTACHMENT:
1. Lighting Proposal
2. Fence Upgrade Proposal
COMMISSION ACTION:
07/21/2004
14:42
SEMINOLE COl.J-lTY MAJOR PROJECT -t 94073276695
NJ. 352 002
. .. Y':
~
~I!CI!IVE@
. l'~~ :~:'I ~
. JalUlfiU COlli"
July IS, 2004
.'
759-47-016
Seminole County Engineering Division
520 West Lake Mary Blvd., Suite 200
Sanford, Florida 32773
VIA FACSIMILE
ORIGINAL BY US MAIL
Attention: Mr. David Martin, Principal Engineer, Special Projects
Reference: SR 434 Trail Overpass
Seminole County
Seminole County Project No, DB-607-01/BJC
Suhjed: Lighting E~tra Work IPricing Proposal
Dear Gentlemen:
Jones Bros., .Inc, herewith submits for your review and approval our lump sum price proposal of
$129,150.00 to design and install lighting for the above referenced project. A breakdown of the
price proposal is attaChed.
The scope of work includes the following:
. Lighting Design by MACTEC. Inc. submitted on July 7, 2004.
. Bridge accent lighting system ins:tallation and activation including Pharo Uplighl$.
. Conduit installation with pull strings (no wire) for the bridge deck and ramp future
lighting,
. Anchor bolt installation (extension by others) for the ramp future lighting.
. Layout.
The scope of work excludes the following:
. Light poles or boUard fixtures,
. Electrical wire for future lighting.
. Power connection and fees.
. Approvals or tests.
As,thiS design incorporates the future lighting' conduit ,which will be capped and sealed with a
wooden plug,.Jones Bros. requests an early review of~e plans by the governing electrical agency
725 PRlMERA BL.VD. SUITE 140
LAKE MARY. nORIDA 32746
401-804-55"10
AIr E fIIIIJ/ Opt1911aR#1 Employ"
~Aug 04 04 OS:25a
Jones Bros., Ino.
407-804-5538
p.2
A u<':lI:>: :::. ::: 1)04
75q.~ i.l): 7
Seminole County Engineering Division
520 West L~kt: M:lt')' Blvd., Suit~ 200
S3.nford, Florida 32773
VIA FACSIMTLE
ORlGrNAL BY US '\"lAIL
Arcenrion: Mr. DJ.vid M:utin, Principal Engineer, Special Projects
Rda':11-: ':: SR -13-1 Trail Ovcrpas,s
S~minole County
S~minolc County Proj~ct No. DB-607-0lfBJC
Subject: Bridge F.~nce Fabric Pricing Propos:d
DI;~\r Gl;l1tll.:l\ll;l1;
Jonc~ Brl~~.. Inc. hcn-:with submits for your review and approval our lump Sum price proposal of
$21.600.00 to provide polyester coated steel wire nlesh in lit:u of the vinyl co~\tl;d ch:.1in link for the
bridge fence fabric. The price is the additional cost to supply and install the wire mesh, which. is
m::\nufoctun~d by OMEGA fence a~ per plan shed B.36.
^ bn:nkdown of the price proposal is as follows:
$ubcontmct
Mark-Up, Overhead, &. Indin;cts. 15%
Subtotal
General Liability & Bond, 1.5%
Total
$18.505.04
S 2.775,75
$21,280.79
L..JJ.2...2J.
$21.600.00
w~ would like to :;turt procurement August 20, 200.~; therefore, approval of this price proposal is need<:d
before August 20. 2004.
Should YOll hav~ any questions, plea5c ell.) not hesitate to contact this off\l;c at 407.804.5540.
Very truly YI.)Ur:;,
JONES RROS., INC.
;;/;11- '11- L' ---
,r.. I.. ./iL
/ u'" .. ...~ -/
Walter L. HudsQn, m, P.E.
Project Manager
cc: Job 7:;;9 . f'iks
725 PR!Mr:HA EiLVD. SUITE 140