REQUEST: Community Development Department is advising the City Commission of
the status of various current planning projects.
PURPOSE: This agenda item is to update the Commission on the status of current plarming
projects.
CONSIDERATION:
Badcock Shopping Center - The final site plan, development agreement, and a general
depiction of signage were approved at the June 28, 2004, City Commission meeting. per
7/12/04 agenda.
Barclay Woods (Townhomes) - The latest iteration of final subdivision/engineering plan for
88 townhouse units on 7.45 acres (219 total parking spaces and no on-street parking) was
approved at the June 14,2004, City Commission meeting. per 6/28/04 agenda
Bruster's Ice Cream - Plans for a 1,213 square foot ice cream drive-thru facility on 1.35 acres
were submitted on May 5, 2004, and were reviewed at the May 18 DRC. The site is located at
the southeast corner of Costa Rica Drive and SR 434 and abuts Hacienda Village. The owner
and contractor have met with staff and the City Manager. per 7/12/04 agenda
Dlutz (Apex)Transmission Shop - The conditional use application, including a concept plan,
was approved by the City Commission at its April 26, 2004, meeting, a site plan was submitted
on June 7, and the site plan was reviewed at DRC on June 15. Staff received an architectural
rendering of the proposed facility. per 7/26/04 agenda
Dr. Courtney's Office - The base ofthe building has been re-painted from the previous bright
blue. Construction is rapidly approaching a certificate of completion (approval of the building
shell) and plans have been submitted for 2 tenant build-outs. per 7/12/04 agenda
July 26, 2004
lofonnatioo Item 300
Page 2
Harbor Winds (a.k.a. Big Cypress) - The conditional use for town-homes on the 15 acres east
of the Golf Terrace Apartments was heard by the BOA at its June 3, 2004, meeting and is
proposed for this commission meeting. The applicant has reduced the number of proposed
units from 99 to 94 (6.27 d.u./acre).
Highlands Apts., Phase II - The 42 unit apartment (3 floor) final site plan was aprroved on
March 8, 2004. Clearing has been completed and a meeting was held on April 261 to address
the extension of potable water to the site (jack and bore in lieu of directional bore). GCI is
now making preparations for the jack and bore under Sheoah Boulevard to connect to the
City's water main. per 6/14/04 agenda
JDC Calhoun - Construction continues. Buildings 8, 9, 10, 11, 12, 13, and 14 have received
certificates of occupancy (COs). Building 1 has received a temporary Certificate of
Completion and some Building No. 1 businesses are open (e.g. Tijuana Flats and the art
studio). Building 2 is under construction. City records indicate the following businesses are
locating in the JDC Calhoun Town Center:
Building 1 - Tijuana Flats (restaurant), an art studio, a coffee shop, and a wine bar cafe;
Building 8 - Leslie Pool Supply, a dentist, tutor, and a tanning salon;
Building 9 - Red Bug Cleaners, E-Nails, Great Clips, Famous Uncle AI's Hotdogs, and
Subway;
Building 10 - Washington Mutual;
Building 11 - State Farm, H & R Block, Rachel Nicole's Salon, ShapeXpress, and a dentist;
Building 12 - Publix;
Building 13 - Winter Springs Liquors, Mailboxes, Etc., and Choice Cellular;
Building 14 - Papa Via's Take & Bake and China Feast; and
Building 15 - Wendy's.
per 7/26/04 agenda
Medallion Convenience Store - Final engineering/site plans were submitted for a convenience
store at the SW corner of SR 434 and Hayes Road, on March 24, 2004. This site is adjacent to
the intersection that was demonstrated to need an east-bound right-hand auxiliary turn lane.
The plans were reviewed at the April 6, 2004, DRC. Staff is investigating the legality of
leaving the existing tanks in the ground. per 6/28/04 agenda
Miranda - Site clearing is completed and no further activity has occurred on-site. per 7/12/04
agenda
Moss Road Townhomes - At its April 12, 2004, meeting, the City Commission approved the
Metropolis Homes conditional use application and concept plan to build as many as 84
condominiums and commercial development on an "L" shaped 9.10 acre site fronting on both
SR 434 and Moss Road, adjacent to the Nations Bank and Victorio's Pizza. per 4/26/04
agenda
Nursery Road (Phil Reece) - The final engineering/site plan was approved at the March 8,
2004, City Commission meeting and a preconstruction meeting was held on March 30. The
City Commission approved the aesthetic review of the first new building at its July 12, 2004,
meeting. per 7/26/04 agenda
July 26, 2004
Infonnation Item 300
Page 3
Oak Forest Unit 7 (Triangular-shaped O.86-Acre Tract between Oak Forest & Tuskawilla
Office Park) - BJM Associates has submitted a fully executed re-plat. It has been sent to the
City's surveying consultant for review for consistency with Chapter 177, Florida Statutes and
subsequent certification. A copy of the plat and pertinent support documentation has been
provided to the City Attorney. Tinklepaugh Surveying reviewed and certified the plat. The
plat and supporting documents have been provided to the City Attorney for his review and
comment. per 5/24/04 agenda
Parkstone - The FLU amendment was heard by the LP A at its September 3 and October I,
2003, meetings and had a transmittal hearing at the October 27,2003, City Commission
meeting. The Commission adopted Ordinance No. 2003-35 at the January 12,2004, City
Commission meeting. A PUD amendment, final subdivision plan, and final plat have been
provided to the City and were reviewed at the March 9, 2004, DRC. Revised plans were
resubmitted on April 23 and were reviewed at the May 4,2004 DRC. Staff received (June 16)
a traffic study modification, incorporating the AM peak traffic with the new elementary school
on SR 419. The PUD master plan amendment and engineering plans were heard at the July 7,
2004, P&Z meeting and are scheduled (along with the development agreement and restrictive
covenants) for this commission meeting. per 7/26/04 agenda
SR 434 Retail (a.k.a. Villagio) - Vertical construction continues. At its July 12,2004, meeting
the City Commission approved a modification to the development agreement and site design,
to include a drive-thru bank at one ofthe out-buildings. per 7/12/04 agenda
Tuscawilla Square - On June 2, 2004, a preliminary site plan was submitted for Tuscawilla
Square, a restaurant and retail development, totaling 13,600 square feet, on 1.41 acres at Gary
Hillary Drive (formerly Colt) Drive. The existing Tuscany Restaurant currently occupies a
portion of the site. The applicant has been negotiating a development agreement with the City
Manager and City Attorney. A re-submittal was provided July 2 and is scheduled for the July
20 DRC. per 07/12/04 agenda
Winter Springs Elementary (New -located on SR 419) - Construction continues. State
Representative David Mealor, City staff, and the FDOT have been investigating ways to
provide safe access to and from the school site. per 4/26/04 agenda
Winter Springs Townhomes - Preliminary plans for approximately 436 town-homes on 40
acres within the Town Center were received from Engle Homes on July 2 and are scheduled
for the July 20 DRC. The applicant proposes to modify the park layout set forth in the Town
Center code. per 7/12/04 agenda
Board of Adjustment - No new variance or conditional use applications have been received.
The Lacey building setback variance request is scheduled for this commission meeting. per
7/26/04 agenda
FUNDING: None required
RECOMMENDATION: None required
ATTACHMENTS: None