COMMISSION AGENI)A
ITEM 300
CONSENT
INFORMATIONAL X
PUBLIC HEARING
REGULAR
.;;x;
September ).J, 2004
Meeting
fl/ ~~
MGR. r - IDEPT /"
Authorization
REQUEST: Community Development Department is advising the City Commission of
the status of various current planning projects.
PURPOSE: This agenda item is to update the Commission on the status of current planning,
projects. /
;'
CONSIDERATION: ,
Badcock Shopping Center - The final site plan, development agreement, and Jt,g~:l
depiction of sign age were approved at the June 28, 2004, City Commis~on1iieeting, Staff has
reviewed the building plans' and awaits revisions. No pre-construction meeting has been
scheduled, at this time, per 8/09/04 agenda,
Barclay Woods (Towllhomes) - The latest iteration of final subdivision/engineering plan for
88 townhouse units on 7.45 acres (219 total parking spaces and no on-street parking) was
approved at the June 14,2004, City Commission meeting. A preconstruction conference was
held on June 25, Plans were discussed at the August 17 DRC meeting for a construction and
sales trailer. per 9/13/04 agenda
Belle Avenue Warehouse - Preliminary plans for a 4 building (3 new buildings totaling 9,000
SF and one existing 2,728 SF building) warehouse complex on 1.174 acres were received on
August 10,2004, and received DRC review on August 24. At that meeting, the applicant
decided to go straight to final engineering plans. per 9/13/04 agenda
Bledsoe Estates Plat - A final subdivision plat for dividing an existing 5+ acre platted lot,
located at the southeast comer of S. Moss Road and Bahama Road, into 2 lots, was received
June 10,2004. The plat was reviewed at the June 15,2004 DRC. per 9/13/04 DRC
Bruster's Ice Cream - Final engineering/site planlans for a 1,213 square foot ice cream drive-
thru facility on 1.35 acres were submitted on May 5, 2004. A revision was submitted on
August 27,2004, and is scheduled for the September 7 DRC. The site is located at the
southeast comer of Costa Rica Drive and SR 434 and abuts Hacienda Village. The applicant
September 13, 2004
Infonnatioll Item 300
Page 2
has also submitted a concept plan, complete with renderings, in response to City Commission
concerns. The concept plan is scheduled for review at this City Commission meeting. per
9/13/04 agenda
Dlutz (Apex)Transmission Shop - The conditional use application, including a concept plan,
was approved by the City Commission at its April 26, 2004, meeting, a site plan was submitted
on June 7 and reviewed at DRC on June 15. An architectural rendering was provided and a
plan re-submittal was received July 27 - both were discussed at the August 3 DRC. per
8/23/04 agenda
Dr. Courtney's Office - The base of the building has been re-painted from the previous bright
blue. The City has issued a certificate of completion (approval of the building shell) and Dr.
Courtney's interior build-out is under way. Engineering staff awaits "as-builts" for the
engineering final inspection. per 7/12/04 agenda
Harbor Winds (a.k.a. Big Cypress) - The conditional use for town-homes on the 15 acres east
of the Golf Terrace Apartments approved at the August 9, 2004, City Commission meeting for
a maximum of94 unit (6.27 d,u./acre). per 8/23/04 agenda,
Highlands Apts., Phase II - The 42 unit apartment (3 floor) final site plan was approved on
March 8, 2004. Crews have completed the ex filtration storm-water management system and
are currently constructing the concrete walL GCl is now making preparations for the jack and
bore under Sheoah Boulevard to connect to the City's water main, The water connection had
to be relocated, due to conflict with the existing storm-water system, per 8/09/04 agenda
JDC Calhoun - Construction continues. Buildings 8, 9, 10, 11, 12, 13, and 14 have received
certificates of occupancy (COs). Building 1 has received a temporary Certificate of
Completion and some Building No.1 businesses are open (e.g. Tijuana Flats and the art
studio). Building 2 is under construction. City records indicate the following businesses are
locating in the JDC Calhoun Town Center:
Building 1 - Tijuana Flats (restaurant), an art studio, a coffee shop, and a wine bar cafe;
Building 8 - Leslie Pool Supply, a dentist, tutor, and a tanning salon;
Building 9 - Red Bug Cleaners, E-Nails, Great Clips, Famous Uncle AI's Hotdogs, and
Subway;
Building 10 - Washington Mutual;
Building 11 - State Farm, H & R Block, Rachel Nicole's Salon, ShapeXpress, and a dentist;
Building 12 - Publix;
Building 13 - Winter Springs Liquors, Mailboxes, Etc., and Choice Cellular;
Building 14 - Papa Via's Take & Bake and China Feast; and
Building 15 - Wendy's.
per 7/26/04 agenda
Maharaj Plat - Harold and Bendix Maharaj submitted a final plat to divide one approximately
5.4 acre platted lot at the northeast comer of Hayes Road and Panama Road on February 18,
2004. The proposed plat is scheduled for this City Commission meeting. per 9/13/04 agenda
Medallion Convenience Store - Final engineering/site plans were submitted fi::>r a convenience
store and car wash at the SW comer of SR 434 and Hayes Road, on March 24, 2004. This site
September 13, 2004
Information Item 300
Page 3
is adjacent to the intersection that was demonstrated to need an east-bound right-hand auxiliary
turn lane. The applicant's team has been advised of City Commission concerns about a car
wash at that location. per 8/23/04 agenda
Miranda - Site clearing is completed and no further activity has occurred on-site, per 7/12/04
agenda
Moss Road Townhomes - At its April 12, 2004, meeting, the City Commission approved the
Metropolis Homes conditional use application and concept plan to build as many as 84
condominiums and commercial development on an "L" shaped 9.1 0 acre site fronting on both
SR 434 and Moss Road, adjacent to the Nations Bank and Victorio's Pizza, On August 20,
staff received a letter from Metropolis Homes stating that they are preparing for subdivision
plan submittal and requesting a 6 month extension of their conditional use. per 9/13/04 agenda
Nursery Road (Phil Reece) - The final engineering/site plan was approved at the March 8,
2004, City Commission meeting and a preconstruction meeting was held on March 30. The
City Commission approved the aesthetic review of the first new building at its July 12, 2004,
meeting and a building permit has been issued. Crews are installing the infrastructure. Shop
drawings for the pre-cast concrete structures as well as the site sanitary and water facilities
have been approved. per 8/09/04 agenda
Oak Forest Unit 7 (Triangular-shaped O.86-Acre Tract between Oak Forest & Tuskawilla
Office Park) - The City Commission approved the Oak Forest Unit 7 re-plat at its July 26,
2004, meeting. The plat and associated joinder and consent forms were recorded on August
10, per 8/23/04 agenda
Parkstone - A PUD master plan amendment, preliminary subdivision plan, and final
subdivision plan were approved by the City Commission at its July 26,2004, meeting. On
September 1, a revised final engineering plan was submitted, proposing to re-Iocate the
entrance more southerly along Parkstone Boulevard and lower the approved final grade. The
proposal will be addressed at the September 21, 2004, DRC meeting. per 9/13/04 agenda
Sprint - On August 27,2004, Sprint (applicant) and Spectra Site (tower owner) submitted
plans to extend the existing 144.5' tall telecommunications tower on the Weaver site, between
Barrington Estates and DeLeon Road. The applicant proposes to extend the height of the tower
20' and add Sprint antennae. The City Attorney has been advised and provided copies of the
submittal. Per 9/13/04 agenda
SR 434 Retail (a.k.a. Villagio) - Vertical construction continues. At its July 12,2004, meeting
the City Commission approved a modification to the development agreement and site design,
to include a drive-thru bank at one of the out-buildings. Building plans for both out-buildings
have been approved and the applicant has submitted plans for the fountain. per 9/13/04
agenda
Tuscawilla Square - On June 2, 2004, a preliminary site plan was submitted for Tuscawilla
Square, a restaurant and retail development, totaling 13,600 square feet, on 1.41 acres at Gary
Hillary Drive (formerly Colt) Drive, The existing Tuscany Restaurant currently occupies a
portion of the site. The applicant has been negotiating a development agreement with the City
Manager and City Attorney. A re-submittal was reviewed at the July 20 DRC and the overall
September 13, 2004
Infomlation Item 300
Page 4
project was. subsequently addressed with the City Manager, City Attorney, and planning staff.
per 9/13/04 agenda
Winter Springs Elementary (New - located on SR 419) -The traffic light is in place and
functioning and school is open, per 8/23/04 agenda
Winter Springs Townltomes - Preliminary plans for approximately 436 town-homes on 40
acres within the Town Center were received from Engle Homes on July 2 and were reviewed
the July 20 DRC. The City Commission approved a concept plan at its August 9, 2004,
meeting. The City Attorney noted that the concept plan, as proposed, would require a
development agreement or special exception or both, per 8/23/04 agenda
Board of Adjustment - A variance request from Section 9-3 of the City Code was received
from Mr. and Ms. Backus to re-subdivide one of 2 lots previously created from a platted lot in
the Ranchlands (creating a total of 4 lots - one existing lot divided into 3 lots and the other
existing lot left alone). The variance will be heard at the September BOA meeting. If
approved, the applicant would still need to provide a final subdivision plat.
The Montgomerys have applied for a "general permit" (pursuant to county regulations,
administered by the City, for property in the City with county Future Land Use designation and
zoning) to allow a woodworking business at their De Leon Road/Cress Run site, on property
they purchased from Mr. Weaver. This will be heard at the September 2 BOA meeting.
The Lacey building setback variance request was deferred until the City Commission considers
a new variance ordinance. per 9/13/04 agenda
FUNDING: None required
RECOMMENDATION: None required
ATTACHMENTS: None
COMMISSION ACTION: