'REQUEST: Community Development Department is advising the City Commission of
the status of various current planning projects.
PURPOSE: This agenda item is to update the Commission on the status of current planning
projects.
CONSIDERATION:
Badcock Shopping Center The traffic study is being reviewed by the City's consultants and
the site plan was reviewed at the October 7, 2003, DRC. Revised final site plans were
submitted on NovelJ1ber 24, 2003, and were reviewed at the December 9, 2003, DRC meeting.
per 1/26/04 agenda.
Barclay Woods (Town/lOmes) - On December 9, the final subdivision/engineering plan for 88
townhouse units on 7.45 acres was submitted for review. The plans are scheduled to be
reviewed at the April 7, 2004, P&Z meeting. The per 04/12/04 agenda
Dr. Courtney's Office - Vertical construction continues. Storm-water and sanitary sewer lines
have been completed and inspected. per 4/12/04 agenda
Highlands Apts., Phase II - The 42 unit apartment (3 floor) final site plan was approved on
March 8, 2004. Another preconstruction meeting was held. Crews were to begin barricading
the trees that are to be saved and subsequently beginning site work. per 4/12/04 agenda
JDC Calhoull - Construction continues. Buildings 8, 9, 10, 11, 12, 13, and 14 have received
certificates of occupancy (CDs). Building No.1 is under construction. Building 2
architectural renderings and shell building plans were approved at the March 8, 2004, City
Commission meeting. Both teams met at City Hall and discussed how the Town Center Code
(and other applicable codes) requirements will be addressed with Building No.2. The next
step is for the architect to design the structural components of the building.
April 12, 2004
I nformation Item 300
Page 2
Staff believes the development agreement needs to be amended to accommodate the doors at
buildings 1 and 2 that do not meet the 50 foot maximum separation requirement (Subsection
20-327 (d) of the City [Town Center] Code).
A new supplemental Agreement was proposed by the applicant's new attorney at the February
9,2004, City Commission meeting, in response to the City's proposed Ordinance No. 2004-10.
The Agreement was not approved and Ordinance No. 2004 - 10 was approved on second
reading, with a third (adoption) hearing scheduled for March 8, 2004. Approval of Ordinance
No. 2004-10 was deferred at the March 8, 2004, City Commission meeting.
City records indicate the following businesses are locating in the JDC Calhoun Town Center:
Building 1 - Tijuana Flats (restaurant), an art studio, and a wine bar cafe;
Building 8 - Leslie Pool Supply, a dentist, tutor, and a tanning salon;
Building 9 - Red Bug Cleaners, E-Nails, Great Clips, and Subway;
Building 10 - Washington Mutual;
Building 11 - State Farm, H & R Block, Rachel Nicole's Salon, ShapeXpress, and a dentist;
Building 12 - Publix;
Building 13 - Winter Springs Liquors, Mailboxes, Etc., and Choice Cellular;
Building 14 - Papa Via's Take & Bake and China Feast; and
Building 15 - Wendy's.
per 4/12/04 agenda
Medallion Convenience Store - Final engineering/site plans were submitted for a convenience
store at the SW comer of SR 434 and Hayes Road, on March 24, 2004. The plans are to be
reviewed at the April 6, 2004, DRC. per 4/12/04 agenda
Miranda - A pre-construction meeting was held September 5. Revised site signage and a
construction sign were approved by the City Commission at the October 27,2003, meeting.
Staff reviewed the proposed building plans and has required additional details to ensure the
pilasters on the front of the building extend out from the fayade to create a depth perception.
per 1/26/04 agenda
Moss Road TOJVn/zomes - On December 23, 2003, Metropolis Homes submitted a conditional
use application and concept plan to build as many as 69 townhomes on an "L" shaped 9.10
acre site (7.58 units per acre) fronting on both SR 434 and Moss Road, adjacent to the Nations
Bank and Victorio's Pizza. Access is proposed from Moss Road, with emergency access from
SR 434. Alignment of the entrance roadway with Lori Anne Lane and wetland
encroachment/buffering issues must be addressed with the subdivision plan review. The plan
has been revised for the access to align with Lori Anne Lane. The conditional use received a
recommendation for approval at the January 22,2004, BOA meeting and is scheduled for the
February 23, 2003, City Commission meeting. On February 2, the applicant met with the City
Manager and staff to try to apply Town Center-type guidelines to the development, as part of
the City's efforts to upgrade the SR 434 Redevelopment District and surrounding properties.
The applicant met again with staff on March 30, 2004. The conditional use is scheduled for
this meeting. per 4/12/04 agenda
Nursery Road (Phil Reece) - The final engineering/site plan was approved at the March 8,
2004, City Commission meeting and a preconstruction meeting was held on March 30. per
4/12/04 agenda
April 12, 2004
Information Item 300
Page 3
Oak Forest Unit 7 (Triallgular-shaped O.86-Acre Tract betweell Oak Forest & Tuskawilla
Office Park) - BJM Associates has submitted a fully executed re-plat. It has been sent to the
City's surveying consultant for review for consistency with Chapter 177, Florida Statutes and
subsequent certification. A copy of the plat and pertinent support documentation has been
provided to the City Attorney. Tinklepaugh Surveying reviewed the plat and has provided
comments to the City and BJM. per 3/08/04 agenda
Parkstolle - The FLU amendment was heard by the LP A at its September 3 and October 1,
2003, meetings and had a transmittal hearing at the October 27,2003, City Commission
meeting. The Commission adopted Ordinance No. 2003-35 at the January 12, 2004, City
Commission meeting. A PUD amendment, final subdivision plan, and final plat have been
provided to the City and were reviewed at the March 9, 2004, DRC. Staff awaits a resubmittal.
per 4/12/04 agenda
SR 434 Retail (a.k.a. Villagio) ~ Vertical construction continues. One segment of the sanitary
sewer construction will not take place until building is to a point that the construction ofthe
last section of sanitary will not conflict with vertical facet construction. The contractor is
preparing to install this segment of the sewer line. The masonry wall issue was settled when
the developer, the homeowners, and the City all agreed at the January 26,2004, City
Commission meeting to split the cost of raising the wall from 6 to 8 feet tall. per 4/12/04
agenda
Tuskawilla Trails. - The lift station start-up passed inspection, after minor repairs. Staff
conducted a walk-thru and a punch list has been prepared. Final acceptance of infrastructure to
be conveyed to the City may be scheduled for this meeting. per 4/12/04 agenda
Wagller's Curve (a.k.a. Heritage Park) - Revised building plans are being reviewed. Staff
has been working with the applicant to correct the gazebo. per 3/08/04 agenda
Willter Sprillgs Elemelltary (New -located 011 SR 419) - Construction continues. The FDOT
has recently indicated an unwillingness to allow a traffic light at the proposed location, after
initially indicating otherwise. Staff estimated that the cost to the City to provide police officers
at the school crossing would amount to $44,000 per year that has not been budgeted. At the
January 12, 2004, City Commission meeting, the Commission voted to send a letter to the
FDOT. A revised entrance without the traffic signal was approved at the March 8, 2004, City
Commission meeting. per 3/22/04 agenda
Board of Adjustment - A conditional use for a major automotive service and repair facility
(transmission shop) along 17-92, north of Boat Lake and south of Shepard Road, will be
heard at the April 1, 2004 BOA meeting. per 4/12/04 agenda
FUNDING: None required
RECOMMENDATION: None required
ATTACHMENTS: None