REQUEST: Community Development Department is advising the City Commission of
the status of various current planning projects.
PURPOSE: This agenda item is to update the Commission on the status of current planning
projects.
CONSIDERATION:
Badcock Shopping Center The traffic study is being reviewed by the City's consultants and
the site plan was reviewed at the October 7,2003, DRC. Revised final site plans were
submitted on November 24,2003, and were reviewed at the December 9, 2003, DRC meeting.
per 1/26/04 agenda.
Barclay Woods (Towl.Ilwmes) - On December 9, the final subdivision plan was submitted and
reviewed at the December 16 DRC. Review of the traffic analysis revealed a traffic
concurrency issue on this portion of SR 434 (no widening proposed there in FDOT 5 year work
plan). Traffic consultants for both the applicant and the City are investigating alternatives to
meet concurrency requirements. per 1/26/04 agenda
Dr. Courtney's Office - A pre-construction meeting was held December 8, 2003 and site work
has commenced while the building plans are being reviewed. per 01/26/04 agenda
Garcia Driveway Re-locate. - The crew completed the new driveway and is now removing
sections of the existing driveway. per 1/12/04 agenda
Highlands Apts., Phase II - The 42 unit apartment (3 floor) final site plan was approved on
October 14, 2002. A pre-construction conference was held March 27, 2003. The applicant
needed to provide either a storm-water permit or letter of exemption from the SJRWMD (the
site was once part of the larger adjacent Seville on the Green) before commencing clearing.
Building plans were reviewed by staff and the applicant must resubmit revised plans. On.
August 8, 2003, the applicant submitted a revised final engineering/site plan with on-site
January 26, 2004
lnfonnation Item 300
Page 2
storm-water management. A revised plan, submitted December 11,2003, was reviewed at the
December 16,2003, DRC. per 1/12/04 agenda
JDC Calhoun - Construction continues. Buildings 9, 10, 11, 13, and 14 have received
certificates of occupancy (COs). Building No.1 is under construction. An incomplete plat to
subdivide the Wendy's site from the 15 acre JDC tract was submitted May 7 and reviewed at
the June 2, 2003, staffDRC meeting. The City's surveying consultant has certified the plat
and the City Commission will review it at this meeting.
A Second Amendment to the Development Agreement was approved at the June 23, 2003,
commission meeting, allowing Building No. 1 to be a tall single floor structure with the
appearance of a 2 floor structure, designed to accommodate a second floor if/when the market
dictates.
City records indicate the following businesses are locating in the JDC Calhoun Town Center:
Building 1 - Tijuana Flats (restaurant), an art studio, and a wine bar cafe;
Building 8 - Leslie Pool Supply, a dentist, and a tanning salon;
Building 9 - Red Bug Cleaners, E-Nails, Great Clips, and Subway;
Building 10 - Washington Mutual;
Building 11 - State Farm, H & R Block, Rachel Nicole's Salon, ShapeXpress, and a dentist;
Building 12 - Publix;
Building 13 - Winter Springs Liquors, Mailboxes, Etc., and Choice Cellular;
Building 14 - Papa Via's Take & Bake and China Feast; and
Building 15 - Wendy's.
per 1/26/04 agenda
Miranda - A pre-construction meeting was held September 5. Revised site signage and a.
construction sign wen: approved by the City Commission at the October 27,2003, meeting.
per 1/26/03 agenda
Moss Road Townhomes - On December 23, 2003, Metropolis Homes submitted a conditional
use application and concept plan to build as many as 69 townhomes on an "L" shaped 9.10
acre site (7.58 units per acre) fronting on both SR 434 and Moss Road, adjacent to the Nations
Bank and Victorio's Pizza. Access is proposed from Moss Road, with emergency access from
SR 434. Alignment of the entrance roadway with Lori Anne Lane and wetland
encroachment/buffering issues must be addressed with the subdivision plan review. The
conditional use will be heard at the January 22,2004, BOA meeting. per 1/26/04 agenda
Nursery Road (Phil Reece) - The final engineering/site plan was submitted October 30, 2003,
and was discussed at the November 11, 2003, DRC. Revised plans and a traffic study were
submitted on December 17 and reviewed at the January 6, 2004, DRC. per 1/12/04 agenda
Oak Forest Unit 7 (Triangular-shaped O.86-Acre Tract between Oak Forest & Tuskawilla
Office Park) BJM Associates has submitted a fully executed re-plat. It has been sent to the
City's surveying consultant for review for consistency with Chapter 177, Florida Statutes and
subsequent certification. A copy of the plat and pertinent support documentation has been
provided to the City Attorney. per 01/12/04 agenda
January 26. 2004
Infoml3lionltem 300
Page 3
Parkstone - The FLU amendment was heard by the LP A at its September 3 and October 1,
2003, meetings and had a transmittal hearing at the October 27, 2003, City Commission
meeting. The Commission adopted Ordinance No. 2003-35 at the January 12, 2004,City
Commission meeting. The applicant has had 2 pre-application conferences with the DRC to
discuss a subdivision plan submittal. per 1/26/04 agenda
SR 434 Retail(a.k.a. Villagio) - Vertical construction continues. One segment of the sanitary
sewer construction will not take place until building is to a point that the construction of the
last section of sanitary will not conflict with vertical facet construction. The manager has
been working with the developer and adjacent homeowners regarding the 6' tall masonry wall
and buffer - the building permit for the wall is on hold in the interim. per 12/08/03 agenda
Tuskawilla Trails. - The sub-base has been installed for the road and the crew has begun
constructing the curbing. Mid-State has another crew that has focused on grading building pad
and yard areas. The '~jack-and-bore" to connect to the existing water main in the Tuscawilla
Road ROW has been scheduled for December 31.' per 1/12/04 agenda
Wagner's Curve (a.k.a. Heritage Park) - Building permits for the townhomes have been
issued. C. W. Meyer (the site contractor) has formed and poured sidewalks within the
development and leading out to the crossing at SR 434. Some of the sidewalk is being re-done
to provide adequate h.mdicap accessibility. Staff has required modifications to the gazebo, to
bring it into compliance with the approved plans. per 1/26/04 agenda
Winter Springs Elementary (New -located on SR 419):-'- Construction continues. The FDOT
has recently indicated an unwillingness to allow a traffic light at the proposed location, after
initially indicating otherwise. Staff estimated that the cost to the City to provide police officers
at the school crossing would amount to $44,000 per year that has not been budgeted. At the
January 12,2004, City Commission meeting, the Commission voted to send a letter to the
FDOT. per 1/26/04 agenda
Board of Adjustment - One variance request (building setbacks at Hacienda Village) and one
conditional use request (town-homes in C-1 adjacent to the Nations Balik) have been received
for a special BOA meeting. per 1/26/04 agenda
FUNDING: None required
RECOMMENDATION: None required