HomeMy WebLinkAbout2003 02 24 Informational A Current Planning Project
COMMISSION AGENDA
ITEM A
CONSENT
INFORMATIONAL X
PUBLIC HEARING
REGULAR
2/24/03
Meeting
MGR. r/DEPT
Authorization
REQUEST: Community Development Department is advising the City Commission of
the status of various current planning projects.
PURPOSE: This agenda item is to update the Commission on the status of current planning
projects.
CONSIDERATION:
Avery Park - Construction continues. The provision for "mother-in-law" apartments in the
Town Center code has prompted the Department to prepare separate addresses, based on
numbered alley-ways, to ensure appropriate emergency response to these facilities. per
1/13/03 agenda
Belfaire (aka "Barrington Estates" & formerly "Battle Ridge'') - On January 29, 2002, a
final plat, survey, application fee, and title certification were received. This will be reviewed
at the February 18,2002, DRC. per 2/10/03 agenda
Dr. Courtney's Office - In December 2002, Dr. Courtney submitted preliminary
engineering/site plans for a dentist office on the wooded 0.72 acre site immediately west of
City Hall, between City Hall and the equipment rental facility. The engineering plans are
being revised consistent with the geometry plan that was conceptually approved at the
February 10, 2003, City Commission meeting. per 2/24/03 agenda
Fox Run Preliminary Subdivision Plan- On March 26, staff received the application and plans
for preliminary subdivision of a 5-10t residential subdivision on 1.28 acres at the west end of
Panama Circle. This item was reviewed at the April 2, 2002, DRC. Staff awaits are-submittal
per 4/22/02 agenda
Garcia Driveway Re-locate. - Staff notified from Mr.Garcia that his variance request (12'
paved roadway surface, no curb/gutter, and no sidewalks) had been approvded. Mr. Garcia
was advised that the 3/13/2000 minutes required a 50 foot-wide easement, set back at le.ast 20
February 24, 2003
Information Item A
Page 2
feet from the adjacent Oak Forest residential lots. Final engineering plans are being reviewed
by staff and will be discussed at the 2/18/03 DRC. Per 2/24/03 agenda
Highlands Apts., Phase II - The 42 unit apartment final site plan was approved on October
14,2002. per 10/28/02 agenda
JDC Calhoun - Construction continues. Buildings 11, 13, and 14 have received certificates of
occupancy (e.O.). Building No.9 is nearly ready for a e.O. The Wendy's (Building No. 15)
drive-thru access and dumpster location/access have been decided by the Commission.
Detailed engineering plans are being revised and will be provided to staff.
City records indicate the following businesses are locating in the JDC Calhoun Town Center:
Building 9 - Red Bug Cleaners, E-Nails, Great Clips, California Yogurt, and Subway;
Building 10 - Washington Mutual;
Building 11 - State Farm, H & R Block, Rachel Nicole's Salon, and a dentist;
Building 12 - Publix;
Building 13 - Winter Springs Liquors, Mailboxes, Etc., and Choice Cellular;
Building 14 - Papa Via's Take & Bake and China Feast; and
Building 15 - Wendy's.
per 02/24/03 agenda
Miranda - The applicant submitted, a site plan on October 17, 2002, a re-submittal on
December 24, and another re-submittal on January 29. The staff DRC will review and
provided comments at the February 18,2003, staffDRC meeting. per 02/10/03 agenda
Nursery Road (Phil Reece) - The City closed on the park properties on November 25, 2002.
The deed has been sent to be recorded. per 01/13/03 agenda
Oak Forest Unit 7 (Triangular-shaped O.86-Acre Tract between Oak Forest & Tuskawilla
Office Park) Trees that the homeowners removed without a permit have not been replaced.
BJM Associates has submitted 2 draft plats and 1 boundary survey for preliminary review.
Staff met with BJM and reviewed the progress on the plat. BJM is in the process of having the
plat executed, which is complicated by the number of owners and mortgage holders. Staff has
met with BJM and have provided necessary documentation to mortgage holders to help
expedite the re-plat. per 2/24/03 agenda
Parkstone - Construction continues. Since the City Commission accepted those potable
water and sewer improvements that were to be dedicated to the City, the applicant has
requested that the performance bonds (guaranteeing their installation) for units 3 and 4 be
returned. A letter was sent to the bonding company clarifying this and that the City is ready to
return the bonds. per 8/26/02 agenda
SR 434 Retail(a.k.a.' Villagio) - Subsequent to the City Commission's comments on the
revised geometry plan and draft development agreement, the development team have been
revising the site plan details for submittal. Staff is proceeding with the City Commission
directives from the February 10, 2003, City Commission meeting. per 02/24/03 agenda
February 24, 2003
Information Item A
Page 3
SR 434 Roadway Improvements Project - No additional information. per 4/22/02 agenda
Tuskawilla Office Park - Building plans for Building No.4 were re-submitted and are being
reviewed by staff. Site lighting, the adjacent dumpster enclosure, trees, and the wall must be
adequately addressed prior to any e.o. being issued at the site. The internal sidewalk was
addressed at the January 27,2003, City Commission meeting. per 2/10/03 agenda
Tuskawilla Trails. - The preliminary subdivision plan (36 lots and a storm-water pond on 8.64
acres) was approved at the June 10, 2002, City Commission meeting. The final engineering
plans were reviewed at the November 5,2002, DRe. Revised plans were submitted December
24, 2002, and again on January 21, 2003. Staff and the applicant are negotiating a proposed
development agreement that, along with the final engineering plans, is anticipated to be
brought to the February 24, 2003 City Commission meeting. per 2/10/03 agenda
Wagner's Curve - Land clearing is under way. A final subdivision plat was submitted on
August 22, 2002, proposing to split the commercial from the residential portions of the site.
The plat was executed and recorded January 30, 2003. Within about 2 weeks, Centex plans to
submit the plat for the portion it plans to purchase for its 158 town homes. 2/10/03 agenda
Winter Springs Elemelltary. - A memo has been sent to the City Attorney requesting
verification of the applicability of the City's sign and dumpster pad enclosure regulations on
school sites. The City Attorney has verbally opined that signage is subject to the City's
regulations. per 9/23/02 agenda
Winter Springs Elementary (New - located on SR 419) - A preliminary site plan for a new
elementary school, located generally northwest of the intersection ofSR 434 and SR 419, was
submitted August 21 and reviewed at the September 3, 2002, DRC and again conceptually at
the January 7, 2002, DRC. Staff received a re-submittal for review and comment at the
February 4, 2003, DRe. per 2/1 0/03 agenda
, Board of Adjustment - No new BOA applications have been received. Two applications
received for the February 6, 2003, BOA meeting are scheduled for this City Commission
meeting. One is a conditional use to allow a tattoo and body piercing shop in the C-2 zoning
district along US 17-92 and the other is a setback variance request. per 2/24/03 agenda
FUNDING: None required
RECOMMENDATION: None required
ATTACHMENTS: None
COMMISSION ACTION: