HomeMy WebLinkAbout2006 10 09 Consent 402 SR 434 and Vistawilla Drive Intersection Improvements
COMMISSION AGENDA
ITEM 402
Consent
October 9.2006
Regular Meeting
Mgr. /,/ Dept.
Authorization
REQUEST:
Public Works Department is Requesting Authorization to
Retain the Services of Professional Engineering Consultants
(PEC) for the Design of State Road 434 and Vistawilla Drive
Intersection Improvements.
PURPOSE:
To enter into a contract with PEC through the Seminole County Minor
Roadway and MBSU Design contract to design and prepare construction
plans and obtain permits for improvements (construction of an eastbound
right turn/ deceleration lane) to the intersection of State Road 434 and
Vistawilla Drive in the amount of $20,975.40.
CONSIDERA TIONS:
This intersection was identified in the Right Turn/ Deceleration Lane
Study in November 2004 as the number one priority for the installation of
an eastbound right turn/ deceleration lane.
Recent development at this intersection and anticipated increased traffic
volumes increases the need for improvements.
The developers of the Colonial Bank and the Metro Church of Christ,
through development agreement, have agreed to donate the required land
needed for the rights of way for the construction of the turn lane.
FUNDING:
CITY OF WINTER SPRINGS CITY COlVllVllSSION
REGULAR MEETING - OCTOBER 9, 2006
CONSENT AGENDA ITEM 402
PAGE 2 0F 2
The funding for the design of this project has been budgeted this fiscal
year (FY 2006-07) under the Transportation Impact Fund (140-65000-
30112).
RECOMMENDATIONS:
The Public Works Department recommends that Professional Engineering
Services, Inc be retained for the design of the right turn/ deceleration lane
for State Road 434 and Vistawilla Drive Intersection Improvements in the
amount of $20,975.40.
ATTACHMENTS:
Professional Engineering Services Proposal
COMMISSION ACTION:
PROFESSIONAL ENGINEERING CONSULTANTS, iNC.
August 30, 2006
P-6311
MK-03
Mr. Brian Fields, P.E.
City Engineer
City of Winter Springs
1126 E. State Road 434
Winter Springs, Florida 32708
RE: State Road 434 / Vistawilla Drive Inter.section Improvements
Proposal for Professional Engineering Services
Dear Mr Fields:
Professional Engineering Consultants, Inc.. (PEC) is pleased to present this proposal for
professional engineering design, analysis and permitting services for the State Road 434/
Vistawilla Drive intersection improvements project which consists of the addition of
eastbolmd right-turn deceleration lane at this intersections.
The terms of this proposal are consistent with om continuous Seminole County Minor
Roadway and MSBU Design contract terms and conditions, including manhoms and hourly
rates
SCOPE OF SERVICES
Design, Construction Plans, Preparation and Permitting
1
Design topographic survey to include locating all improvements and utilities as
evidenced by above ground features or as marked by the designated utility company
representative.. The coveragellimits of this survey will be sufficient to construct the
proposed improvements
2
Design right-of-way established based on existing right-of-way maps and
monumentation
3
Execute a program of subsurface sampling and field testing, This includes
perfOIming auger borings to a depth of 7 feet for the proposed turn lane widening.
4
Visually classify and stratify representative soil samples in the laboratory using the
Unified Soil Classification System
Engineering Our Community
200 East Robinson Street 0 Suite 1560 Orlando, Florida 32801
Mr. BIian Fields, P.E.
August 30, 2006
Page 2
P-6311
5. Collect groundwater level measurements and estimate normal wet seasonal high
groundwater levels
6. Prepare complete construction plans in accordance with the latest design standards,
design manuals and policies adopted by FDOT and Seminole County as applicable,
and in accordance with the City of Winter Springs criteria and preferences
7. Perform utility coordination.. The cost for relocation design of water mains, force
mains or gravity sanitary sewer is not included in this proposal. If required, a
separate proposal will be provided for approval
8 Submit the construction plans to FOOT for review and approval
SCHEDULE
A ninety (90) day proj ect schedule is anticipated to complete the construction drawings.. This
time is exclusive of any review time by FDOT, and the utility owners. Close coordination
will be required in order to minimize the review time by the various agencies..
PROFESSIONAL FEES
Design, Construction Plans Preparation and Permitting
$20,97540
The attached sheet provides a breakdown of the manhours and fees
We appreciate the opportunity to submit this proposal and look forward to working with you.
If you have any questions, please contact me..
Very truly yours,
Professional Engineering Consultants, Inc.
Fursan S. Munjed, P.E.
Project Manager
Mr Brian Fields, P E..
August 30, 2006
Page 3
P-6311
City of Winter Springs
State Road 434/ Vistawilla Drive Intersection Improvements
PEC Manhour and Fee Estimate
Design, Construction Plans, Preparation and Permitting.