REQUEST: Utility Department Presenting Alternatives for Implementation of the
Utility/Stormwater Rate Study.
PURPOSE: The purpose of this Board item is for the City Commission to direct staff on the
implementation of the recommendations and alternatives presented in the Utility and
Stormwater Rate Study.
CONSIDERA TIONS:
The City Commi~sion reviewed the water, wastewater, and stormwater rate and charge
study at the workshop on November 12' 2001. An additional workshop was conducted on
March 4,2002 to review the capital improvement program included in the rate study. Three
options for implementation as well as other issues were discussed in November and staff needs
a final decision in order to proceed with implementation.
The main issues for discussion are:
· Implementation of the water and wastewater rates over 1, 2 or 3 year period.
· Reclaimed water charges/metering.
· Other miscellaneous Water and Wastewater Fees.
· Monthly StormwaterFee
Public Resource Management Group prepared the study and they will be on hand to
review the options again and answer questions. A copy of their presentation is attached to this
agenda.
..
Regular Agenda Item B
April 22, 2002
Page 2
RECOMMENDATION:
Staff makes the following recommendations:
· Implementation of the water and wastewater rates over 1, 2 or 3 year period
1
It is recommended to adopt the two-year option to reduce the impact on the customers ,and not
allow the fund balance to diminish significantly.
· Reclaimed water charges/metering.
It is recommended that all reclaimed services be metered over the next 12 months as a way to
control consumption and add customers utilizing the existing supply. Option 2 of the rate
options is recommended to recover the operating costs and meter installation cost.
· Other miscellaneous Water and Wastewater Fees.
It is recommended that the service availability charges be adopted as proposed and also that a
25% surcharge be added to the rate structure for non-City customers.
· Monthly StormwaterFee
It is recommended that Alternative 1 is adopted which would increase the monthly stormwater
fee to $3.25 to maintain current operations, fund. mosquito control, and fund deferred, current.
and future capital needs.
IMPLEMENTA TION:
An ordinance will be brought back incorporating the final direction. We are required to
provide 30 days notification to all customers of any proposed rate adoption hearings, which
will be done through the water bill.
ATTACHMENTS:
I. PRMG Presentation
COMMISSION ACTION:
01>
City of Winter Springs, Florida.
Wt W t t. d.
~ 'I ~ . i '( I ""f/:' r"" r .~ : i (; r ;
- I i - , ; __, I ..,
a ~er, as ~ewa ~er an_ _.__~
S't t R;' t d' C'h: . S't d
- r . ( -. ~ ( '~- I ',( :. '. (! (. ".:': I (~, ; '__, ':" I '. !. ~.
, ormwa era e an,-, .",-~-,arge ,J' ;,uy
~ -
Presented By:
Public Resources Management Group, Inc.
~
)>
---i
---i
)>
o
:r
rn
Z
---i
Z
o
.
.
April 22, 2002
What Are We Addressing?
- --
· Monthly Water and Wastewater User Charges
· Reclaimed Water Charges
· Other Miscellaneous Water and Wastewater Fees
. Monthly Stormwater Fees
e
2
19
-
- ...
-
~~ -..IIISI~
W:A'T'-E"R' A, N.D:. W' fA: S.-.T-...E....WiA. T-:.'E---:R'~'
,.--.- .-" " ! i f' ;' ,'" / j ,'" . :..- :
-- - ".. __,_'!!f" _.1 _.j ,,_ . ..~ ..../ ___"_m ."'" . 'j!!.l _.. .__, ,.,...,._..i ,_, __
USE.... R--!!Y C;H-. .A'-, R..~G(-.E.~-S.:
.. , -." - __. ..00 ... _.~ _.".____., _~~
fJ
3
(9'
.-...
Water' and Wastewater Mo,nthly User
Fees Require Rate Adjustments
· Previously Enacted Rate System Adjustments
- East System (Tuscawilla) Rates Have Not Increased Since
1991
- West System Rates Have Not Increased Since 1984
- Exception was 1998 When Water Conservation Blocks
were Adopted
· Over These Time Periods, System Operating Costs Have
Risen (Inflation Rate Averaged 2.3% Per Year)
e
4
IH
.-
~' Issue: Water and Wastewater Month.ly
_ ~.., User Fees Require Rate Adjustments (can't)
--
--
· System Benefits Have Minimized Need for Rate
Adjustments Over Last Several Years
- High Historical Customer Growth Levels
(325-550 Accounts Per Year Over Recent Period)
- Improvements in Technology
- Restruc~ured Debt Reduced Net System Cost
($385,000 Reduction in Annual Debt Payments Realized)
.
· All Possible Benefits Have Been Realized Ilmplellj1ented
5
HI'
Issue: Water and Wastewater Monthly User Fees
Require Rat.e Adjustments (con~t.)
--
· Fund Balances Have Been Diminished
Operating Fund Expensec:t $0.4 Million on Reclaimed Water
Projects Over Last Five Years (Over $ 4.0 MM Debt
Financed From Rates)
Budgeted Use of Fund Balances in FY2002 = $0.5 MM
· Regulatory Requirements Impacting System Costs
Sludge Disposal Costs ($48K to $150K Over Last Three Years)
Operation and Maintenance of Reclaimed Water System
., Customer Growth Recently Experienced Projected to Diminish
I
6
19
Need: Rate Adju~tment of Appro}ximat.ely 17.25%
-
· Eliminates Utility Budget ,Deficiency Projected for Fiscal
Year 2002
- Approximately $0.5 Million Currently Estimated to be
Funded From Cash Reserves
· Revenue Increase Will Meet System Operating and
Capital Needs through Projection Period
(FY 2002 to 2006)
· Equates to 1.0% Annual Compound Rate Increase if
Performed Each Year Since 1984 (Consumer Price Index
e
Average - 2.3% per Year)
7
HI'
CITY OF WINTER SPRINGS
Monthly Rates for Water and Wastewater Usage of 6,000 Gallons
Historical and Forecast Consumer Price Index (CPI) Adjustments
vs.
Proposed 17.25% FY 2002 Rate Increase
$65.00
$60.00
"f::.
.f::. '
$55.00 ~6 '
.f::.
..
$50.00
$45.00 ..[]
.l3-..[3.
..[3-
$40.00
~.~-~-~.-o
$35.00 .
,
,
.
"",..,rt, ^r..
~.)v.vv
. ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ * ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
-.- Historical and Forecast With CPI Adjustments - Historical and Forecast With 50% CPI Adju~tments
-+- Proposed 17.25% Rate Increase in FY 2002
10
Rate Adjustment Options
-.--
· Option 1 - System-wide One Time Increase of 17.250A>
· Option 2 - System-wide Two'Year Increases of 9.250/0 per Year
· Option 3 - System-wide Three Year Increases of 6.75% per Year
9
w"
R- e~.s. ults o. f: p... .~Or p.'ose-d Ai d~:iU: !str'm, (len, it;-s
- I'.-II,~' ..~ _ _.. __ I ~ t!) .. _ _,_'9.. _I _ ..<7
,,;
...
· Allows Preservation of Adequate Working Capital Reserves
· Provides Funding Mechanism for Future System Renewals and
Replacement of Assets (Accrues Funds For Future)
· "Across-The-B~ard" Rate Adjustments Serve to Minimize
Impact to Low End User
· Rates Remain Competitive with Surrounding Utilities
II
10
~
-
~.
I~.,l
- ~~
-BIII:Ill
R"~E'.- C". LA, I'MED" . Wi A' T" --E'-'-;R...-~ R..", iAT' '..-'CE---~.S'- A' N',.D." ,
.-."-- ..~. ,. . ,.' -:' ,- :-_._!J , '. ,
-,' r ' ,.- . ,- " ~ i-" , . ,i
-- - _. -. .- -- -'~~-".. ." - -'. -~ _ _D ~-_ ____..".= ' __ _.. _0J0. __..._~
OTHER MISCELLANEOUS CHARGES
.
11
(I
Issue: Reclaimed Water Rate Adjustments
.-
· Rates Have Not Been Adjusted Since Originally
Impleme'nted in 1989
· Benefit - Existing Reclaimed Customers Pay One-
Fifth the Amount the Equivalent Potable Water
Customer Pays for Irrigation
· Reclaimed System is Not Self-Supporting and
Reduces Available Funds From WaterlWastewater
e System
· Metering vs. Non-Metering Residential Class
12
m
Issue:
Reclaimed Water Rate Adjustment (con 't.)
-
13
19
~
.
1?:~~,
I ~~cd ~
.. 1959
_ ~". :n:. .
-
Service A vaUability Charges
..~
~mEI
· Assigns Growth-Related Capital Costs to Those Customers
Responsible for Such Additional Costs
· Generally Labeled as "Growth Paying Its Own Way"
Water System
Char~er ERC
Existinq Proposed
$392.00 $515.00
Wastewater System
$1,890.00
$2,195.00
.
14
II'
Or-. .t.h,er M, ,iscel:l:a:- in! leoUi 'S Ch:8- irig' i8S
- . ~ ~ -~!!!!I.~ ~ ~.!!!J - .~ i! ~ .!!!" ~ .. -, .~ ~ .i!!J ~ !!!!I
-BIll
· Reviewed Other Fees and Charges for the Provision of Certain
Services Performed By the Utility
Meter Installation I Tap-In Charge
Returned Check Charge
Application Fee
Service Reinstatement Fee
Inspection Fee
Meter Reinstallation Charge
Late Payment Fee
Water Line I Meter Tampering Fee
e
Fire Protection Charge (New Fee)
15
19-
- ~ __'......""".,11PNii...........:M~
S- TO' 'R-- MWA TER
11 __I .1 I f = rJ _J ._rr _" = ~ ~ _
ill
16
IH
Issue: Sto.rmwater Utility Syst.em Requires
Rate Adjustmen.t
--- .........- -- - -..-.ow"
· Current Stormwater Rates Have' Not Been Adjusted Since 1992
· Anticipated Shortfall of Approximately $107,000 Anticipated in Fiscal
Year 2002
· Require Funds to Perform Needed Improvements That Have Been
Deferred for Several Years
Little Lake Howell Culvert ($156,000)
Gee Creek Sedimentation Pond ($122,000)
No Name Creek Drainage and Swales ($190,000)
II! Operating Reserves Budgeted to Decrease During Course of Fiscal Year
2002
17
Em
Need: Rate Adjustment to Existing Stormwater
Fees of Approximately $1.21 Per Month
· Increased Revenue Will Provide Sufficient Funds to
Maintain Current Level of Operations
· Additional Funds Will Also Support Mosquito Control
Program and Projects Identified in Five Year Capital
Program
-
· Three Alternatives Have Been Provided for the City's
fJ
Consideration
18
~~mIilI
ID
e
R~ tAd'. t' t' 0 t.~
'ae ~'. ~. .Jus:.'mlenj:' r~)p J,ons
~ -
RlJLlI!lIl:~-=-'.lItJI!'<i('nc"'~'!:'\"M-:':>h','il~
Rates Comparable to Monthly Fee Recommended in City;s Stormwater Master Plan
19
IB-
-
.
~
l~~l
_ __....T?U~ ..
-
, "
COMMISSION
DIRECTION
e
I
-.
20 19'