REQUEST: Public Works Department Updating the City Commission on the Status of
the Town Center Roads project.
PURPOSE: The purpose of this agenda item is to update the City Commission on the progress
of the Town Center Roads project for July 2002.
CONSIDERATIONS:
Attached is the July 2002 monthly progress report for the Town Center Roads
project as well as the updated contractors schedule. The project which includes the
reconstruction and construction of Tuskawilla Road and Hickory Grove Boulevard is 33%
complete. Hickory Grove Boulevard and Doran Drive are scheduled for completion
September 13th. Completion of all the road work including street pavers is mid December.
The streetscape and hardscape improvements are estimated to be completed in February
2003.
The trail crossing permit for the stormwater piping and temporary road has been
submitted to the State. The County is tentatively scheduling a resolution supporting the
permit for August 26th.
ATTACHMENTS:
1. July Report
COMMISSION ACTION:
rains to the area for approximately 15 to 20 workdays, (6/17 - 7/23) the contractor has
not made noticeable progress in the grading and stabilization along Hickory Grove Road.
The following items are items that are in progress:
1 Tinklepaugh Surveying has drafted the locations and legal descriptions of the right-
of-way and utility easements along the east side of Tuskawilla Road. This
information has been provided to the Engineer. The Engineer is currently awaiting
documentation from the City that the Property owner approved the dedication of the
right-of-way.
2
The location and description of the additional right-of-way along the west side of
Tuskawilla Road at SR 434 has been submitted to the City and CPH. CPH drew the
proposed dedication areas in based on. the descriptions on the provided drawings.
This drawing was compared to the current plans to confirm that the proposed ROW
dedication matches the CPH plans. The AutoCad drawing did not match the
proposed ROW locations along the west side of Tuskawilla Road and additional
correspondence and conversations with Avid Engineering are ongoing to clarify the
discrepancies and dedicate the necessary right-of-way.
3 The Florida Power "switch gear" location has been finalized and it is the Engineer's
understanding that the location will be inside the Winter Springs Town Center Publix
site. Once the switch gear is in place, Florida Power will coordinate with Esterson
Construction as to the relocation of the existing power utilities from the west side of
Tuskawilla Road to the east side. Also, the Engineer contacted with the Power
Company to determine the location of any additional conduits to be placed under the
proposed road. Florida Power is overseeing installation of their own conduits.
4 CPH Engineers has submitted an application for an easement along the east side of
Tuskawilla road at the State Land crossing. Based on recent conversations with the
County and the State, CPH expects the application to receive preliminary approval
from the State by August 2. Additional permitting information shall be sent from the
State to the City for their review and re-submittal to the State with the application fee
for final approval. Once approved, the Contractor may begin construction of the
gravity sewer and storm water collection system in this area.
Please review the above listed items and if you have any comments or questions, please
contact Allen Lane.
Sincerely,
C~)d9~c/~ ~
~ane, Jr.
CC: David Mahler, P.E.
J:\W04100.1\WD\0708 Monthly Report.DOC
A TT ACHMENT NO. 1
Owner:
Contractor:
City of Winter Springs
Esterson Construction Co., Inc.
CPH Engineers, Inc.
1117 East Robinson Street
Suite C
Orlando, Florida 32801
Phone: 407-425.0452
Fax: 407.648-1036
www.cphengineers.com
Hickory Grove Park Road
CPH Project No. W04100.1
MONTHLY PROGRESS REPORT
July 30, 2002
Kip Lockcuff, City of Winter Springs
Kip,
The following it~ms reflect the current status of work completed for the above listed project:
1. The subcontractor has begun installation of the vinyl sheet pile and currently has
installed approximately 80% of the sheets around the retention pond. Once the vinyl
sheet pile wall has been installed and the tie-back system is in place. backfill will begin
over the tie-backs and installation of the decorative block wall shall begin. The projected
date to begin installation of the block wall is August 12, 2002.
2. The stormwater collection system has been completed from the retention pond to
Hickory Grove Park Road. The installation of the 42" storm pipe from the storm manhole
S 19 into the retention pond has been completed and the installation of the 24" storm
pipe from the existing system on the west end ofthe retention pond is to be completed
by August 2, 2002. The entire storm system still needs to be lamped and witnessed by
the Engineer and the City~
3. The contractor has completed installation of the sanitary sewer system from the lift
station along the north side of the retention pond and to the south towards Hickory
Grove Park Road and including sanitary manhole NO.1. Final installation of the sanitary
sewer manhole ring and covers and installation of the grout in.side the manholes has .
also been completed. This system shall need to be video taped and presented to the
Engineer for review and comment. The contractor has installed the force main from
sanitary sewer manhole No. 1 south across s.R. 434. The force main has been
connected to the sewer pipe extending from manhole 1. This force main needs to be
pressure tested by contractor and witnessed by the City and Engineer.
4. To date there have been two submittals for Change Orders. Based on the current
redesign of the parking along Hickory Grove Park Road, there will be an additional
Change Order for additional survey services required for staking out the new parking
spaces as well as some additional earthwork and grading. Also, there will be a Change
Order for new sanitary sewer manholes installed as part of the realignment of the gravity
.sanitary sewer system along Tuskawilla Road.
5. The contractor has completed the installation of the road sub-base and approximately
80% of the sub-base for the revised parking spaces. A portion of the standard curbing
and ribbon curb has also been installed. Due to weather conditions, which have brought
SANFORD . ORLANDO . DELAND . PALM CITY . CAPE CORAL . JACKSONVILLE . PALM COAST . PUERTO RICO
Esterson Construction Company Inc.
Comofele She Deve''''''''''''1
794 Big Tree Drive. Sulle 108 Longwooo, FL 32750
Phone (407) 830-8788 Fax (407) 830-7550
~/ 01 O~..
I QuraOOnaI Schedule
Hid<orv Grove Pari< Road
JuI 29'AuQ 2 5-9 12-16 19-23 26-30 Sept 2-6 9-13 16-20 23-28 3O-Qct 4 7-11 14.19 21.25 28-Nov 1 4-S' 11.15 18-22 25-29 Dee 2-6 9.13
Clear
Oemofllioo
Ea<1hwo<1< -
a. cut fill roadway
b. retention poocI
c. vinvI sheet pile ~... ........()Q(). .. ....
d. key block waft .. )(1(1 )00:'=== . ~D.J '\JCOC ~ .. " "-""()(): <<l ~::l = ~
e. poocI fence ..... ......."')11................ ..... <Xj()"" KY. ()"""""..,:.;,.v
f. site oracle .
Sanitary Sewer
a. onMlv
b. force main
Slcnn Drain
ConcrelIl Curb XlCXX ..< . :.::
Pavement I
a. subbase .vc;............
b. base .
c. asp/> xxx xx
d. oavir brick lOOOOOOCXX
e. sod .Qto- ...()-- ()()(;()O{)O... JUo
T usl<wiIla Road ,
I
Clear I
0em0Iili0n
a. concrete XlCXX XXlOt xxxx xxxxxxxxx xxxxxx XXXXlCXX
b. asphall xxxx XXlOt xxxx xxxxxxxxx xxxxxx XXXXlCXX
c. Dioe xxxxxx
Ear1tlWOfl<
a. import fill xxx x
b. site orade xxx x
Sanitary Sewer . ...... ... ... .... ...
SlDnn urainaae ... ..... .. rYYYY"lOOCX X}t.xxyr"
Polable Waler 10...>_ ..;Jt>.. .. .......JOe
ConcrelIl .. xxx XlOOOOOCXX xx ..<< ;:;)(;'<:'1fll'lI'XXX xxxxx XlOOOOOCXX
Pavement I
a. subbase xxxxx xxxxxxxx ............. xxxxx .... ".... " .xxxxx
b. base xxx xxxxxxxxx )QO()(JOr....... xx xxxxxx YYYYlOOOQ(xxxxxx
c. asohan I
d. P3Vino brick lOOCXXXXXXX xxx xxxxxxxxx xxx xxxxxxxxx
e.sod I .. XXlOOCXXXX xxxxxxxx xxxxxxxx
;::
I:'
~~!
).:~
.~
)~~
Page 1
"1.;
+:~li'.:,i,._;....
'.'