HomeMy WebLinkAbout2005 08 08 Regular Item 510- Resolution 2005-29, Building Permit Fee Schedule
CITY COMMISSION
AGENDA
ITEM 510
Consent
Information
Public Hearin
Re ular
x
fDep~
August 8. 2005
Meeting
MGR. }t--
REQUEST: The Community Development Department/Building Division requests the City
Commission adopt Resolution 2005-29 which revises the Building Permit Fee schedule for new
construction and provides for a methodology for computing and updating the Permit Fee Multiplier.
PURPOSE: The purpose ofthis agenda item is to recommend approval of Resolution 2005-29 which
revises certain portions of Section V of Resolution 2001-45. This revision updates the Building
Valuation Data to reflect current construction values as well as providing for regular updates to these
values as determined by the International Code Council. This revision also provides a methodology for
updating the Building Permit Fee multiplier annually.
APPLICABLE REGULATIONS:
Florida Municipal Home Rule Powers Act
Florida Statute 166.201. Taxes and chan!es
A municipality may raise, by taxation and licenses authorized by the constitution or general law, or by user
charges or fees authorized by ordinance, amounts of money which are deemed necessary for the conduct of
municipal government and may enforce their receipt and collection in a manner prescribed by ordinance not
inconsistent with law.
CHRONOLOGY:
December 10,2001 - Adoption of Resolution 2001-45 amending and revising the City's fee schedule
January 10, 2005 - City Commission adopted Resolution 2005-04 amending and revising the Schedule
of Fees for Zoning, Planning, and Development Services.
August 8, 2005
Regular Item 510
Page 2
CONSIDERATIONS:
Since the adoption of Resolution 2001-45 in December 2001, the cost of building construction has
experienced tremendous increases brought about by costs of materials, labor, and market demand. These
costs increases are not reflected in the City's current Building Valuation Data or Permit Fee Multiplier.
In addition, the new building codes have continually placed higher requirements for inspections on the
City's Building Department. The number of inspections required for a single-family home has increased
by 60 % since the City's current valuation data was published. The number of inspections for a
townhouse (currently the City's most prevalent type of residential construction) has increased by 129%.
In addition, when the current valuation data was published, most of the construction in the City was
single family type housing. Now, the Building Department is being called upon to inspect not only
townhouses but buildings with mixed-use occupancies, structures that are taller and require additional
coordination of threshold inspections, and developments that are arranged with higher densities that
require a substantial increase in review and inspection time for separation requirements, rated-
assemblies, and partial inspections on a single assembly.
The Southern Building Code Congress International (SBCCI) that had been publishing the building
valuation data used by the City is no longer publishing said data and no updates will be available for that
valuation data. The SBCCI has joined with the International Code Council (ICC) in an effort to bring
about a unified organization to deal with the International Building Code. The current (2004) Florida
Building Code is closely modeled after the International Building Code. At the present time, the ICC
Building Valuation Data is the only building valuation data that is researched by industry leaders and
published to aid local governments in the assessment of building permit fees. This data is updated every
six (6) months. The Proposed Resolution would also allow the City to automatically incorporate the
updates to the Building Valuation Data. If the City does not adopt this data, the only options are to stay
with the out-dated data currently in use or to undertake an independent study to attempt to set valuation
data amounts.
The ICC also provides a methodology to determine the Building Permit Multiplier. This is an important
aspect of the ICC provisions since updates to the local multipliers currently in use are not longer
published. This methodology is used to provide a multiplier that will allow for the accurate assessment
of permit fees based upon the historical operating costs of the Building Department. This multiplier is
updated by the Building Department on an annual basis, based upon the previous year's operating costs
and the total annual construction value.
FINDINGS:
1. The amount and complexity of construction within the City has increased significantly in the past
four years since the current construction valuation data and permit fee multiplier was adopted by
the City.
2. The type of construction and increased complexity of said construction have and will continue to
increase the City's cost for outside consultants for inspection and plans review.
August 8, 2005
Regular Item 510
Page 3
3. There is a need to update the Building Valuation Data and the Permit Fee Multiplier to account
for the exponential rise in construction cost over the past four years since the City's current
Valuation Data was published.
RECOMMENDATION:
Staff recommends that the City Commission amend and revise its Building Valuation Data and Permit
Fee Multiplier by adopting Resolution 2005-29.
ATTACHMENTS:
A. Resolution 2005-29
B. International Code Council Building Valuation Data
CITY COMMISSION ACTION:
ATTACHMENT A
RESOLUTION NO. 2005-29
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF WINTER
SPRINGS, FLORIDA, AMENDING SECTION V. OF RESOLUTION 2001-45 TO
REVISE THE SOURCE FOR BUILDING V ALUA TION DATA AND
INCORPORATING THE PERMIT MULTIPLIER METHODOLOGY AS
SPECIFIED BY THE INTERNATIONAL CODE COUNCIL; PROVIDING FOR
CONFLICT; PROVIDING FOR REPEAL OF PRIOR INCONSISTENT
RESOLUTIONS OR PORTIONS THEREOF; PROVIDING FOR
SEVERABILITY; AND PROVIDING FOR AN EFFECTIVE DATE.
WHEREAS, the City of Winter Springs has the authority to amend and repeal
resolutions; and
WHEREAS, a municipality may raise, by taxation and licenses authorized by the
constitution or general law , or by user charges or fees authorized by ordinance, amounts of money
which are deemed necessary for the conduct of municipal government and may enforce their
receipt and collection in a manner prescribed by ordinance not inconsistent with law, See Florida
Statute 166.201; and,
WHEREAS, the City Commission deems it is in the best interests of the City to amend the
Building Permit Fee schedule to update the construction valuation data and to amend the Permit Fee
Multiplier to current rates in accordance with the International Code Council recommendations; and
WHEREAS, the current methodology utilized by the City for construction valuation and permit
fee multiplier are outdated and are no longer being updated by the issuing agency;
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY
OF WINTER SPRINGS, SEMINOLE COUNTY, FLORIDA, AS FOLLOWS:
Section 1.
follows:
Building Permit Fees. Section V of Resolution 2001-45 is hereby amended to read as
Building Permit (for each $1,000 valuation or portion thereof)
Minimum Fee
R17
45
(Valuation of construction is determined by the most recent December publication of the Building
Valuation Data table as printed in the Southern Building magazine Buildin~ Valuation Data as
published by the International Code Council and the Permit Fee Multiplier is determined in
October of each year utilizing the most recent methodology as specified by the International Code
Council. )
The plan review fee for mechanical. plumbing and electrical reviews associated with new
construction is computed at twenty-five (25%) percent of the building plan review fee for each
discipline ($250 minimum).
The plan review fee for accessibility and energy reviews associated with new construction is also
computed at twenty-five (25%) percent of the building plan review fee for each discipline ($250
minimum),
The Sprinkler Review fee is simply based on the number of sprinkler heads: 1-100. $275. 101-
200. $325. 201-300. $350. 301-400. $375. 401-500. $425. over 500. $500 plus $0.33 per
sprinkler over 500. For hydraulicallv designed system. multiply the fee by two.
(All other fees stated in Section V of Resolution 2001-45 shall remain in full force and effect)
Section 2. Repeal of Prior Inconsistent Resolutions. All prior Resolutions or parts of Resolutions
in conflict herewith are hereby repealed to the extent of the conflict.
Section 3. Severability. If any section, subsection, sentence, clause, phrase, word, or portion of
this resolution is for any reason held invalid or unconstitutional by any court of competent jurisdiction,
such portion shall be deemed a separate, distinct and independent provision and such holding shall not
affect the validity of the remaining portion hereto.
Section 4. Effective Date. This Resolution shall become effective immediately upon adoption by
the City Commission of the City of Winter Springs, Florida.
RESOLVED by the City Commission of the City of Winter Springs, Florida, in a regular meeting
assembled on the 8th day of August, 2005.
JOHN F. BUSH, Mayor
ATTEST:
ANDREA LORENZO-LUACES, City Clerk
APPROVED AS TO LEGAL FORM AND SUFFICIENTCY
FOR THE CITY OF WINTER SPRINGS ONLY
ANTHONY A. GARGANESE, City Attorney
ATTACHMENT B
BUILDING VALUATION DATA
The International Code Council is pleased to provide the following
Building Valuation Data (BVD) for its members. The BVD will be
updated and printed at six-month intervals, with the next update in
August 2005. ICC strongly recommends that all jurisdictions and other
interested parties actively evaluate and assess the impact of this
BVD table before utilizing it in their current code enforcement related
activities.
The BVD table provides two main functions. In addition to providing
the "average" construction costs per sq. ft., the data can be used in de-
termining permit fees for a jurisdiction as well as calculating the antici-
pated plan review fee charges by the ICC plan review service. Permit
fee schedules are addressed in Section 108.2 of the 2003/ntemationa/
Building Code" (I BC") whereas Section 108.3 addresses building
permit valuations. The permit fees can be established by using the
BVD table and a Permit Fee Multiplier, which is based on the total con-
struction value within the jurisdiction for the past year. The Square Foot
Construction Cost table presents factors that reflect relative value of
one construction classification/occupancy group to another so that
more expensive construction is assessed greater permit fees than less
expensive construction.
ICC has developed this data to aid jurisdictions in determining
permit fees. It is important to note that while this BVD table does de-
termine an estimated value of a building (i.e., Gross Area x Square
Foot Construction Cost), this data is only intended to assist jurisdic-
tions in determining their permit fees. This data table is not intended to
be used as an estimating guide since the data only reflects average
costs and is not representative of specific construction.
This degree of precision is sufficient for the intended purpose which
is to help establish permit fees so as to fund code compliance activi-
ties. This BVD table provides jurisdictions with a simplified way to de-
termine the estimated value of a building that does not rely on the
permit applicant to determine the cost of construction. Therefore, the
bidding process for a particular job and other associated factors do not
affect the value of a building for determining the permit fee. Whether a
specific project is bid at a cost above or below the computed value of
construction does not affect the permit fee since the cost of related
code enforcement activities is not directly affected by the bid process
and results.
Building Valuation
The following building valuation data represents average valuations for
most buildings. In conjunction with IBC Section 108.3, this data is
offered as an aid for the building official to determine if the permit
valuation is underestimated. Again it should be noted that, when using
this data, these are "average" costs based on typical construction
methods for each occupancy group and type of construction. The
average costs include structural, electrical, plumbing, mechanical, in-
terior finish, normal site preparation, architectural and design fees,
overhead and profit. The data is a national average and does not take
into account any regional cost differences. To this end, the table con-
taining the regional cost modifiers was last printed in the October 2003
issue and has been discontinued.
PERMIT FEE MULTIPLIER
Determine the Permit Fee Multiplier:
1. Based on historical records, determine the total annual construction
value which has occurred within the jurisdiction for the past year.
2. Determine the percentage (%) of the building department budget
expected to be provided by building permit revenue.
Permit Fee Multiplier = Bldg. Dept. Budget x (%)
Total Annual Construction Value
Example
The building department operates on a $300,000 budget, and it
expects to cover 75 percent of that from building permit fees. The total
annual construction value which occurred within the jurisdiction in the
previous year is $30,000,000.
Permit Fee Multiplier = $300.000 x 75% = 0.0075
$30,000,000
PERMIT FEE
The permit fee is determined using the building gross area, the Square
Foot Construction Cost and the Permit Fee Multiplier.
Permit Fee = Gross Area x Square Foot Construction Cost x
Permit Fee Multiplier
Example
Type of Construction: liB
Height: 2 stories
Permit Fee Multiplier = 0.0075
Use Group: B
1. Gross area:
Business = 2 stories x 8,000 sq. ft. = 16,000 sq. ft.
2. Square Foot Construction Cost:
BIIIB = $119.12/sq. ft.
3. Permit Fee:
Business = 16,000 sq. ft. x $119.12/sq. ft x 0.0075 = $14,294
Area: 1st story = 8,000 sq. ft.
2nd story = 8,000 sq. ft.
Important points to know
. In most cases the BVD does not apply to additions, alterations or
repairs to existing buildings. Because the scope of alterations or
repairs to an existing building varies so greatly, the Square Foot Con-
struction Cost does not reflect accurate values for that purpose.
However, the Square Foot Construction Cost can be used to determine
the cost of an addition which is basically a stand-alone building which
happens to be attached to an existing building. In the case of such ad-
ditions, the only alterations to the existing building would involve the at-
tachment of the addition to the existing building and the openings
between the addition and the existing building.
. For purposes of establishing the Permit Fee Multiplier, the estimated
total annual construction value for a given time period (1 year) is the
sum of each building's value (Gross Area x Square Foot Construction
Cost) for that time period (e.g., 1 year).
. The Square Foot Construction Cost does not include the price of the
land on which the building is built. The Square Foot Construction Cost
takes into account everything from site and foundation work to the roof
structure and coverings but does not include the price of the land. The
February 2005 Building Safety Journal 37
BUilDING VALUATION DATA
cost of the land does not affect the cost of related code enforcement
activities and is not included in the Square Foot Construction Cost.
ICC PLAN REVIEW FEE SCHEDULE
The Plan Review fee is based on the estimated construction value cal-
culated in accordance with the Square Foot Construction Costs in the
Table (gross area x Square Foot Construction Costs). For buildings
with an estimated construction value up to $3,000,000, the Building
Plan Review fee is 0.0012 of the estimated value ($250 minimum). For
buildings with an estimated construction value over $3,000,000 up to
$6,000,000, the fee is $3,600 plus 0.0005 of the estimated value over
$3,000,000. For buildings over $6,000,000, the fee is $5,100 plus
0.00035 of the valuation over $6,000,000.
Special consideration may be given in computing Plan Review fees
for buildings such as large warehouses or indoor recreational facilities
due to their plan review simplicity. Such considerations may also be
given to buildings with repetitive floor plans such as high-rise buildings.
Structural reviews in areas of high seismic or wind risk will have an
additional surcharge. Please contact your local ICC district office for
more details.
The plan review fee for Mechanical, Plumbing and Electrical
Reviews is computed at 25 percent of the Building Plan Review fee for
each discipline ($250 minimum).
The plan review fee for Accessibility and Energy Reviews is also
computed at 25 percent of the Building Plan Review fee for each disci-
pline ($250 minimum).
The Sprinkler Review fee is simply based on the number of sprin-
kler heads: 1-100, $275; 101-200, $325; 201-300, $350; 301-400,
$375; 401-500, $425; over 500, $500 plus $0.33 per sprinkler over 500.
For hydraulically-designed systems, multiply the fee by two.
SAMPLE PLAN REVIEW CALCULATION
Type of Construction: IIIB Use Group: B
Height: 3 stories, 35 feet Area/Floor: 15,000 sq. ft.
Solution:
1. Gross square footage: 3 stories x
15,000 square feet
2. Compute estimated construction value:
Square Foot Construction Costs
Estimated Construction Value:
45,000 sq. ft. x $106.00/sq. ft.
3. Compute Plan Review fee:
Building: $3,000,000 x 0.0012
$4,777,000 - $3,000,000
$1,770,000 x .0005
Total Building Review Fee
Mechanical, Plumbing, Electrical: (.25)($4,485)
Accessibility and Energy: (.25)($4,485)
= 45,000 sq. ft.
= $106.00/sq. ft.
= $4,770,000
= $3,600
= $1)70,000
= $885
= $4,485
= $1,121 each
= $1,121 each
Questions concerning the service should be directed to:
Christopher R. Reeves, P.E.
Manager, Plan Review Services
1-888-ICC-SAFE Extension 4309
Square Foot Construction Costsa, b, C
Group (2003 International Building Code) Type of Construction
IA IB IIA liB iliA IIIB IV VA VB
A-1 Assembly, theaters, with stage 175.32 169.68 165.73 158.91 147.77 146.99 153.89 136.91 131.98
Assembly, theaters, without stage 161.71 156.07 152.12 145.30 134.16 133.38 140.28 123.30 118.37
A-2 Assembly, nightclubs 132.76 128.65 125.40 120.51 111.89 111.60 116.32 102.86 99.40
A-2 Assembly, restaurants, bars, banquet halls 131 .76 127.65 123.40 119.51 109.89 110.60 115.32 100.86 98.40
A-3 Assembly, churches 162.43 156.79 152.84 146.02 134.85 134.08 141.00 124.00 119.07
A-3 Assembly, general, community halls, 134.48 128.84 123.89 118.07 105.89 106.12 113.05 95.04 91.11
libraries, museums
A-4 Assembly, arenas 131.76 127.65 123.40 119.51 109.89 110.60 115.32 100.86 98.40
B Business 133.93 129.08 124.97 119.12 106.63 106.00 114.57 95.23 91.59
E Educational 140.45 135.71 131.83 125.99 116.21 113.47 121.83 103.83 99.95
F-1 Factory and industrial, moderate hazard 81.27 77.54 72.95 70.70 61.13 62.13 67.81 52.13 49.47
F-2 Factory and industrial, low hazard 80.27 76.54 72.95 69.70 61.13 61.13 66.81 52.13 48.47
H-1 High Hazard, explosives 76.28 72.55 68.96 65.71 57.30 57.30 62.82 48.30 N.P.
H234 High Hazard 76.28 72.55 68.96 65.71 57.30 57.30 62.82 48.30 44.64
H-5 HPM 133.93 129.08 124.97 119.12 106.63 106.00 114.57 95.23 91.59
1-1 Institutional, supervised environment 132.08 127.54 124.11 119.07 109.24 109.18 115.46 100.39 96.42
1-2 Institutional, incapacitated 222.91 218.06 213.95 208.11 195.19 N.P. 203.55 183.79 N.P.
1-3 Institutional, restrained 152.14 147.29 143.18 137.34 126.08 124.44 132.78 114.68 109.03
1-4 Institutional, day care facilities 132.08 127.54 124.11 119.07 109.24 109.18 115.46 100.39 96.42
M Mercantile 98.85 94.74 90.49 86.61 77.50 78.21 82.42 68.47 66.01
R-1 Residential, hotels 133.46 128.92 125.49 120.45 110.67 110.61 116.90 101.82 97.85
R-2 Residential, multiple family 111.15 106.61 103.18 98.14 88.52 88.47 94.75 79.68 75.70
R-3 Residential, one- and two-family 107.30 104.37 101.80 98.99 94.44 94.22 97.31 89.97 84.71
R-4 Residential, care/assisted living facilities 132.08 127.54 124.11 119.07 109.24 109.18 115.46 100.39 96.42
S-1 Storage, moderate hazard 75.28 71.55 66.96 64.71 55.30 56.30 61.82 46.30 43.64
S-2 Storage, low hazard 74.28 70.55 66.96 63.71 55.30 55.30 60.82 46.30 42.64
U Utility, miscellaneous 57.40 54.28 51.05 48.50 42.07 42.07 45.77 34.59 32.93
a. Private Garages use Utility, miscellaneous
b. Unfinished basements (all use group) = $15.00 per sq. fl.
c. N.P. = not permitted
38 Building Safety Journal February 2005