HomeMy WebLinkAbout2002 04 08 Consent A Seminole County Contract
s'
COMMISSION AGENDA
ITEM A
CONSENT X
INFORMATIONAL
PUBLIC HEARING
REGULAR
April 8, 2002
Meeting
MGR A IDEPT j/Y
Authorization
REQUEST: Public Works Department Requesting Authorization to Piggyback ofT of the
Seminole County contract for the design of the turn lane on S.R. 419 at Moss
Road.
PURPOSE: The purpose of this Board item is to request authorization to Piggyback off of
Seminole County contract (PS-590-01/BJC) for the S.R. 419/Moss Road intersection
improvements including design, plan preparation, and permitting with PEC, Inc. at a
cost of$36,503.00.
CONSIDERA TIONS:
The City Commission directed staff at the CIP workshop to make the addition of a left
turn lane on S.R. 419 at Moss Road a high priority project. FDOT had previously indicated
that this project did not meet their warrants for inclusion in the recently completed deceleration
lane project. However, if the City were to fund the improvements this safety enhancement
could be made,...... .... .......,. ........ .... ......_-...... .... .........
We are proposing to piggyback off of Seminole County's Minor Roadway contract
(PS-590-01/BJC) with PEC, Inc. of Orlando. The scope of work includes surveying,
subsurface sampling and field testing, intersection design, and permitting for the turn lane and
intersection improvements at Moss Road and S.R. 419. Bidding Services and Post Design
Services are not part of this request. The preliminary construction cost estimate is $210,000.
FUNDING:
The funding source for the design cost of$36,503.000 is from the consulting line code
of the Transportation Impact Fee Fund - (140-53 180). The funds for this project will
..
be expended over the next 120 days.
,
April 8, 2002
Consent Agenda Item A
Page 2
RECOMMENDATION:
It is recommended that authorization be given to Piggyback off of Seminole
County contract (PS-590-0 l/BJC) for the S.R. 419/Moss Road intersection
improvements including design, plan preparation, and permitting with PEC, Inc. at a
cost of $36,503 .00 payable from the consulting services line code of the Transportation
Impact Fee Fund - (140-53180).
IMPLEMENTATION SCHEDULE:
The scope of services will be completed within 120 days of approval.
A TT ACHMENTS:
1. PEC Inc. Proposal
COMMISSION ACTION:
..
;,
ATTACHMENT NO. 1
~c
\.
PROFESSIONAL ENGINEERING CONSUL TANTS, INC.
March 21,2002
P-2075RI
MK-03
Mr. Kipton Lockcuff, P.E.
Public Works Director/ Utilities Engineer
City of Winter Springs
1126 E. State Road 434
Winter Springs, Florida 32708
RE: State Road 419/ Moss Road Intersection Improvements
Proposal for Professional Engineering Services
Dear Mr. Lockcuff:
Professional Engineering Consultants, Inc. (pEC) is pleased to present this proposal for
professional engineering design, analysis and permitting services for the State Road 419 / Moss
Road intersection improvements project which consists of the addition of a westbound to
southbound left turn lane on State Road 419.
The terms of this proposal are consistent with our continuous Seminole County Minor Roadway
and MSBU Design contract (PS-590-0l/BJC) terms and conditions, including manhours and
hourly rates.
PEC staff has a great deal of experience in similar projects throughout Central Florida. This
experience includes the permitting process through the Florida Department of Transportation
District 5 and Seminole County.
SCOPE OF SERVICES
Desit!n. Construction Plans Preparation and Permittinl!
1
Design topographic survey to include locating all improvements and utilities as evidenced
by above ground featmes -or as -marked .by.the'de$-i.gnatcdutil-i.ty-companYTepn;;sentati.v~. .
The coverage/limits of this survey will be sufficient to construct the proposed
improvements.
2.
Design right-of-way establ ished based on existing right-of-way maps and monumentation.
3.
Execute a program of subsurface sampling and field testing. This includes perfor,ming
auger bori ngs to a depth of 7 feet for the proposed turn lane widening.'
4.
Visually classify and stratify representative soi I samples in the laboratory using the Unified
Soil Classification System.
5.
Collect groundwater level measurements and estimate normal wet seasonal high
groundwater levels. ,'"
i!'I'!jf,';{}c't:;
.' 1;,;111::1.'1;110 Qllr (;01111111111;1:'
fJ/~ iI/l:r .IIS
:a:r:'{.'y:..K::
. ,.C. . C!i;;I"!(::) Florid:! J?srJi . '..-:;' .:);'/;:~:) . ;:(,"/ ::;.1:: 0,19-1),101
~.
Mr. Kipton Lockcuff, P.?_
March 2 i, 2002
Page 2
P.:2075Rl
6. Prepare complete construction plans in accordance with the latest design standards, design
manuals and policies adopted by FDOT and Seminole County as applicable, and in
accordance with the City of Winter Springs criteria and preferences.
7. Perform utility coordination. The cost for relocation design of water mains, force mains
or gravity sanitary sewer is not included in this proposal. Ifrequired, a separate proposal
will be provided for approvaL
8. Submitthe construction plans to FDOT and Seminole County for review and approvaL
SCHEDULE
A one hundred twenty (120) day project schedule is anticipated to complete the construction
drawings. This time is exclusive of any review time by FDOT and Seminole County. Close
coordination will be required in order to minimize the review time by the various agencies_
PROFESSIONAL FEES
Design, Construction Plans Preparation and Permitting
$36,503.00
The attached sheet provides a breakdown of the manhours and fees.
We appreciate the opportunity to submit this proposal and look forward to working with you. If
you have any questions, please contact me.
Very truly yours,
PROFESSIONAL ENGINEERlNG CONSULT ANTS, me.
~;/~t ---..-..--------------------.--
- .- --.-- -....-.--.-.----------.----- - ---
. " ... ~ .'...... On ~_._ ._ _ .
. -- . - ..
Fursan S. Munjed, P.E.
Project Manager/Associate Principal
Attachment
cc: Kenneth R. Hooper, Y.P., PEC
Approved for Professional Engineering Consultants, Inc.
~
{/p
Officer's Title
f}1cYch 22/ ZWL-
Date
G:lckricalllllGI rw ^ YlI'EC\MK-03\1'-2075r1.llr
+'
..
City of Winter Springs
State Road 419 / Moss Road Intersection
PEC Manhour and Fee Estimate
.....".. ........ ..... .................... .... ................ ....... .... n.
................... ...... ......................................... ............. ....... .... ....
,;i.:i:i:8:t9Jg?t:::,:-:Iii:.;:.:.:.i::~Am:QI::.:::i::,i:Ii':::i:W!lPli::ii!'::} :E:im9t~):i.:.:
:'.!.;!::~m~!.mffiffif::!:'!:l ,':::::..::::.:mie~f:il:.'::':;:i:i...:~~Bf:.~:~~W::::: ,i:i:i.i!iiRH.%:.::
.... ............ ............ ...........
.............................. -........--............
......... '...................
I:.::::~!~;~g:::::::.r:::::li:::I~~9Q:ImI::
'\
Roadway Design
Drainage Design and Permitting
Maintenance of Traffic
24 72 94 16 206
12 32 24 8 76
8 8 18 4 38
4 8 12 2 26
8 16 8 4 36
8 8 4 20
8 8 16
....
Signing & Pavement Marking
Utility Coordination
Coordination With FOOT
Quality Control/Constructibility Review
ii~p~:T@TA8.M~~ffl:8Yg$IP.6S~::I:::'.:I::........
Sutvey/Right-of-Way
Geotech
Direct Reimbursables
$14,158.00
$5,340.00
$2,653.60
$1,805.80
$2,603.60
$1,519.60
$1,322.40
...... ---............................
.. ',..-.... .. ,"----. -......-.
..-......................................
.~.:':..:....:.~3~.i~M8gg:.:
$4,200.00
$2,400.00
$500.00
G:lclerical\HIGHWA YlPEClMK-03\P-2075r1.1tr
..
,