REQUEST: Community Development Department is advising the City Commission of
the status of various current planning projects.
PURPOSE: This agenda item is to update the Comm.ission on the status of current planning
projects.
CONSIDERATION:
Avery Park - Construction continues. per 8/26/02 agenda
Belfaire(formerly Battle Ridge) - In May, all files and correspondence relating to the final
engineering/subdivision plan and modification to the annexation and pre-development
agreement were copied for Stenstrom, McIntosh, Colbert, Whigham and Simmons (the City of
Oviedo's Attorney). Construction has been proceeding. A representative from both the
Seminole County Planning Department and the Black Hammock citizens group inspected the
approved plan and the First Addendum to the Annexation and Pre-development Agreement.
Engle Homes is investigating the process for providing a sales trailer on-site. per 8/26/02
agenda
Fox Run Preliminary Subdivision Plan- On March 26, staff received the application and plans
for preliminary subdivision of a 5-10t residential subdivision on 1.28 acres at the west end of
Panama Circle. This item was reviewed at the April 2, 2002, DRC. Staff awaits are-submittal
per 4/22/02 agenda
Garcia Driveway Re-locate. - Staff received an application from Manny Garcia to relocate a
private drive/roadway from Tuscawilla Unit 5 onto an adjacent portion of Oak Forest Tract
"A" that Mr. Garcia owns, The item was initially scheduled for the June 18,2002, DRC, but
was re-scheduled for the July 2, 2002, DRC. Staff received a partial response to the DRC
comments and awaits a complete response, Due to the complexity of the issue, the partial
response will be addressed at the September 3, 2002, DRC. per 9/09/02 agenda
September 9,2002
Information Item A
Page 2
Highlands Apts., Phase II - The 42 unit apartment preliminary site plan was approved on
April 22, 2002. The final engineering/site plan was scheduled on the August 12 City
Commission agenda, but was not heard, The Commission directed that the plans be completed
before being brought back to the City Commission. per 9/09/02 agenda
JDC Calhoun - Construction continues. Buildings 9 and 11 are under construction. Buildings
13 and 14 are still in the permit stage. No solution for the Wendy's (Building No. 15) drive-
thru access has been reached. Any modification of the approved site plan must be approved by
the City Commission. Building 10 (Washington Mutual) received a special exception but has
not submitted building plans. per 8/12/02 agenda
Miranda - Staff has conducted a pre-application conference with the applicant's engineer and
awaits a site plan submittal. Staff has inquired of Dover Kohl & Partners of specifics of the
frontage roadway. per 8/26/02 agenda
Nursery Road (Phil Reece) - Staff awaits a building plan submittal for the walls and
engineering plans for the storm-water pond. The City Manager sent Mr. Reeece a letter on
August 23, reminding him of the requirements (improvements and park dedication) set forth in
the development agreement that was approved on July 8 and executed August 1, 2002. per
8/26/02 agenda
Oak Forest Unit 7 (Triangular-shaped 0.86-Acre Tract between Oak Forest & Tuskawilla
Office Park) Trees that the homeowners removed without a permit have not been replaced,
per 8/26/02 agenda
Parkstone - Construction continues. Since the City Commission accepted those potable
water and sewer improvements that were to be dedicated to the City, the applicant has
requested that the performance bonds (guaranteeing their installation) for units 3 and 4 be
returned. A letter was sent to the bonding company clarifying this and that the City is ready to
return the bonds. per 8/26/02 agenda
SR 434 Retail(a.k.a. Villagio) - The FDOT conducted a meeting to discuss access
alternatives, The applicant has submitted another site plan design, minus the connection to
Stone Gable Circle, with two curb-cuts onto SR 434, and a median-cut to serve the project.
The applicant has held a meeting with the homeowners to discuss potential ways to mitigate
the effects of the project (08/20/02), As a result of that meeting, several design professionals
residing within Stone Gable met with the applicant's design team on August 27, 2002, to try to
re-design the site to make it as acceptable to the residents as possible while still remaining a
financially viable project. per 9/09/02 agenda
SR 434 Roadway Improvements Project - No additional information. per 4/22/02 agenda
Torcaso Park Improvements- On March 27, staff received the final engineering/site plan for
the City's Torcaso Park improvements. This item was reviewed at the April 2, 2002, DRC
meeting. The City Engineer is working on plans for the park. per 8/26/02 agenda
September 9,2002
Information Item A
Page 3
Tuskawilla Office Park - Construction is proceeding. A proposed entry feature with signage
was forwarded to Dover Kohl for review, but no solution has been attained. per 8/12/02
agenda
Tuskawilla Trails. - The preliminary subdivision plan (36 lots and a storm-water pond on 8.64
acres) was approved at the June 10, 2002, City Commission meeting, The final engineering
plans were reviewed at the August 20, 2002, DRC. Staff awaits resubmittal. per 8/26/02
agenda
Wagner's Curve - The final subdivision plan was submitted May 24, 2002, and reviewed at
the June 4, 2002, DRC meeting. Staff awaits a re-submittal of the final subdivision plans, A
variance application was submitted on August 22, 2002, requesting relief from the City's
Subsection 9-241 (e) storm-water management requirements. A final subdivision plat was
submitted on August 22, 2002, proposing to split the commercial from the residential portions
of the site. The plat will be reviewed at the September 3,2002, DRC. per 9/09/02 agenda
Winter Springs Elementary. - A memo has been sent to the City Attorney requesting
verification of the applicability of the City's sign and dumpster pad enclosure regulations on
school sites. per 8/26/02 agenda
Winter Springs Elementary (New - located on SR 419) - A preliminary site plan for a new
elementary school, located generally northwest of the intersection ofSR 434 and SR 419, was
submitted August 21 and will be reviewed at the September 3, 2002, DRC. per 9/09/02 agenda
Board of Adjustment - The Board of Adjustment (BOA) will hear an application by Centex
for relief from the City's Subsection 9-241 (e) storm-water management requirements. No
BOA meeting has been scheduled for September 5, 2002, because a quorum cannot be
assembled. per 9/09/02 agenda
FUNDING: None required
RECOMMENDATION: None required