REQUEST: Community Development Department is advising the City Commission of
the status of various current planning projects.
PURPOSE: This agenda item is to update the Commission on the status of current planning
projects.
CONSIDERATION:
Avery Park - Construction continues. The parking study, required by Code for a special
exception for Morrison Homes to install inoperable plastic shutters, has been' provided - thus
completing the requirements set forth in the Code for the special exception. per 9/23/02
agenda
Belfaire(formerly Battle Ridge) - In May, all files and correspondence relating to the final
engineering/subdivision plan and modification to the annexation and pre-development
agreement were copied for Stenstrom, McIntosh, Colbert, Whigham and Simmons (the City of
Oviedo's Attorney). Construction has been proceeding. A representative from both the
Seminole County Planning Department and the Black Hammock citizens group inspected the
approved plan and the First Addendum to the Annexation and Pre-development Agreement.
Engle Homes is investigating the process for providing a sales trailer on-site. per 8/26/02
agenda
Fox Run Preliminary Subdivision Plan- On March 26, staff received the application and plans
for preliminary subdivision of a 5-lot residential subdivision on 1.28 acres at the west end of
Panama Circle. This item was reviewed at the April 2, 2002, DRC. Staff awaits are-submittal
per 4/22/02 agenda
Garcia Driveway Re-locate. - Staff received an application from Manny Garcia to relocate a
private drive/roadway from Tuscawilla Unit 5 onto an adjacent portion of Oak Forest Tract
"A" that Mr. Garcia owns. The item was initially scheduled for the June 18, 2002, DRC, but
was re-scheduled for the July 2, 2002, DRC. Staff received a partial response to the DRC
November 11, 2002
Information Item A
Page 2
comments and awaits a complete response. Due to the complexity of the issue, the partial
response was addressed at the September 3,2002, DRC. Based on a clarification from the City
Attorney, the applicant has provided additional information for staff to review. The necessary
variance for the 12' wide roadway, without a sidewalk or curbing was heard at the October 23,
2002, BOA meeting but deferred until the November 12,2002, meeting. per 11/11/02 agenda
Highlands Apts., Phase II - The 42 unit apartment final site plan was approved on October
14, 2002. per 10/28/02 agenda
JDC Calhoun - Construction continues. Buildings 9 and 11 are under construction. Buildings
13 and 14 are still in the permit stage. No solution for the Wendy's (Building No. 15) drive-
thru access has been reached. Any modification of the approved site plan must be approved by
the City Commission. Publix was issued a CO on Friday, October 18,2002. The applicant's
engineer met with the staff DRC on November 5, 2002, to discuss the plans depicting minor
site plan changes. On November 5, 2002, staff received revised architectural renderings of
Building No.1. per 11111/02 agenda
Miranda - Staff has inquired of Dover Kohl & Partners of specifics of the frontage roadway.
This information was been forwarded to the applicant, who submitted a site plan on October
17,2002. The staffDRC reviewed the plans and provided comments at the November 5,2002,
staffDRC meeting. per 11111102 agenda
Nursery Road (Phil Reece) - Staff awaits a building plan submittal for the walls and
engineering plans for the storm-water pond. The City Manager sent Mr. Reeece a letter on
August 23, reminding him of the requirements (improvements and park dedication) set forth in
the development agreement that was approved on July 8 and executed August 1, 2002. per
8/26/02 agenda
Oak Forest Unit 7 (Triangular-shaped O.86-Acre Tract between Oak Forest & Tuskawilla
Office Park) Trees that the homeowners removed without a permit have not been replaced.
BJM Associates has submitted 2 draft plats and 1 boundary survey for preliminary review. No
application or title certifications have yet been provided. per 10/28/02 agenda
Parkstone - Construction continues. Since the City Commission accepted those potable
water and sewer improvements that were to be dedicated to the City, the applicant has
requested that the performance bonds (guaranteeing their installation) for units 3 and 4 be
returned. A letter was sent to the bonding company clarifying this and that the City is ready to
return the bonds. per 8/26/02 agenda
SR 434 Retail(a.k.a. Villagio) - The applicant resubmitted revised plans on October 2, 2002.
Staff reviewed the plans and the engineer is correcting the discrepancies. per 11111102 agenda
SR 434 Roadway Improvements Project - No additional information. per 4/22/02 agenda
Torcaso Park Improvements- On March 27, staff received the final engineering/site plan for
the City's Torcaso Park improvements. This item was reviewed at the April 2, 2002, DRC
meeting. The City Engineer is working on plans for the park. per 8/26/02 agenda
November 11,2002
Information Item A
Page 3
Tuskawilla Office Park - Construction is proceeding. per 10/28/02 agenda
Tuskawilla Trails. - The preliminary subdivision plan (36 lots and a storm-water pond on 8.64
acres) was approved at the June 10, 2002, City Commission meeting. The final engineering
plans were reviewed and comments provided by staff at the November 5, 2002, DRC. per
11/11/02 agenda
Wagner's Curve - The final subdivision plan was submitted May 24, 2002, and reviewed at
the June 4, 2002, DRC meeting. Staff awaits a re-submittal of the final subdivision plans. A
variance application was submitted on August 22, 2002, requesting relief from the City's
Subsection 9-241 (e) storm-water management requirements. This variance was heard by the
BOA on October 23, 2002. A final subdivision plat was submitted on August 22, 2002,
proposing to split the commercial from the residential portions of the site. The plat was
reviewed at the September 3, 2002, DRC. Staff received additional information/material on
October 2 and 3. The final engineering and variance are scheduled for the November 11, 2002,
City Commission meeting. per 11/11/02 agenda
Winter Springs Elementary. - A memo has been sent to the City Attorney requesting
verification of the applicability of the City's sign and dumpster pad enclosure regulations on
school sites. The City Attorney has verbally opined that signage is subject to the City's
regulations. per 9/23/02 agenda
Winter Springs Elementary (New - located on SR 419) - A preliminary site plan for a new
elementary school, located generally northwest of the intersection of SR 434 and SR 419, was
submitted August 21 and reviewed at the September 3, 2002, DRC. Staff awaits a re-
submittal. per 9/09/02 agenda
Board of Adjustment - The Board of Adjustment (BOA) will hear an application by M. A.
Garcia from the City's roadway standards requirements to allow a 12' wide roadway without
sidewalks or curbs, an application from Paul Starks to build a detached garage (accessory
building) larger than 240 square feet, and an application from Mr. and Mrs. Ogus to allow a
building to encroach into a building setback area. A BOA meeting has been scheduled for
November 11,2002. per 11/11/02 agenda
FUNDING: None required
RECOMMENDATION: None required
ATTACHMENTS: None