COMMISSION AGENDA
ITEM D
CONSENT
INFORMATIONAL
PUBLIC HEARING
REGULAR X
November 25, 2002
Meeting
MGR fb /DEPT //1/
Authorization
REQUEST: Public Works Department Responding to the City Commission's Request for the
Tuskawilla Office Park Wall Height.
PURPOSE: The purpose of this Board item is to respond to the City Commission request to verifY
the wall height for the Tuskawilla Office Park.
CONSIDERA nONS:
The height of the Tuskawilla Office Park waIl was questioned at the November 11,
2002 City Commission meeting. Staff measured the waIl height on both the north and south
sides of the wall. The majority of the wall is six feet or greater on both sides. However, there
were two sections of the wall that were not six feet as measured on either side.
The two sections are a 160' section near pad 11 (by the dumpster in question) and a
60' section centered on the pond. The section near Pad 11 is approximately 5' 1" on the office
park side and 5'6" on the homeowner's side. The section adjacent to the pond is
approximately 4'6" on the office park side and 5'9" on the homeowner's side.
The code specifies a six foot masonry wall but it does not define on which side it is to
be measured. The Building Dept. has not finaI inspected the waIl yet.
RECOMMENDATION:
It is recommended that staffbe directed to require the waIl to be six foot
minimum as measured from the earth line on either side.
ATTACHMENTS:
1. Site Plan sketch
COMMISSION ACTION:
. " 'MOC.' '
"tct;i,,~~~o ARtA
o'f!O.~Tt':~.w.
r~""; :<Nt:~ ",
....... ......,
. " .' ",' ""
. . . ~, . '. .". . .'
.::~:,: ,~.
"\
..... .
&..,~~~~~: .
./..,.
/./~", .
.",' .
,-
,/
"~: --". ,",; "'Si
,-> ':',~f}4E~16~::,:';'
:-::",;,;',~,,:",~:','~:',':,~'~'\6~",J~,i.'
~ vr;, { '..'. ~,:;~~<,,:t;: ,~'):'. :~- .
,': 'S6n..~'ei,{:~~,,: '
"
.!
. i
I
I
i
i
" -:.~~.~~.
:;:-,',:..;";'
......'.. '...
......
..
"
,
,
\,
''"\.
\c)