HomeMy WebLinkAbout2005 04 11 Informational 309 Installation of Sidewalks on Northern Way, Shetland Avenue and Dyson Drive
COMMISSION AGENDA
ITEM 309
CONSENT
INFORMATIONAL X
PUBLIC HEARING
REGULAR
April 11, 2005
Meeting
MGR;2- IDEPT
Authorization
Iff
REQUEST: Public Works Advising the City Commission that the Public Meeting on the
Installation of Sidewalks on Northern Way, Shetland Avenue and Dyson Drive is
scheduled for April 21st.
PURPOSE: The purpose of this Board item is to advise the City Commission that the public meeting is
scheduled for April 21, 2005, City Hall Commission chambers, 7:30 PM.
CONSIDERATIONS:
Staff has scheduled the public meeting for the sidewalk project for April 21, 2005 at 7:30
PM in the City Commission chambers. Design consultants and staff will be available at 6:30 PM to
individually discuss the project.
Notices of the meeting will be sent to the property owners abutting the project. The City
newsletter will also contain information about project.
RECOMMENDATION:
It is recommended that the City Commission support this project and authorize staff
to work with the County on informing the public on the safety benefits of this project.
IMPLEMENTATION SCHEDULE:
The results and recommendations of the public meetings will be brought back to the City
Commission for a final decision.
ATTACHMENTS:
1. Public Meeting Notification letter
COMMISSION ACTION:
Attachment No. 1
NOTICE
PUBLIC WORKSHOP
CONSTRUCTION OF SIDEWALKS ON
NORTHERN WAY, SHETLAND AVENUE AND DYSON DRIVE
April 21, 2005 7:30 PM
Winter Springs City Hall
You are invited to a public meeting held by the City of Winter Springs and Seminole County regarding
proposed sidewalk safety improvements on Northern Way, Shetland Avenue and Dyson Drive. The
meeting will be held on April 21st at 7:30 PM in the Winter Springs City Hall City Commission chambers.
Representatives from the design consultants and staffwill be available from 6:30 to 7:30 PM to individually
discuss the proposed improvements.
The proposed improvements are for five foot sidewalks along the south side of Northern Way, west side of
Shetland Avenue, and both sides of Dyson Drive. All three roads are part of the City collector road system
and it is a goal of the City to provide sidewalks on all collector roads for safe recreational pedestrian
activity as well as for school children within the two mile no bus radius.
Previous public meetings have resulted in the plans being modified by reducing the initial ten foot sidewalks
and the addressing of various drainage problems brought to the consultants attention. The proposed
improvements are being funded through the County at a cost savings to the City of approximately
$800,000. The input received from the public meeting will be provided to the Winter Springs City
Commission who will subsequently make a final decision on whether to proceed to bidding and
construction of this project
Please plan on attending so concerns you may have can be addressed or input can be documented. If you
are unable to attend, but would like to still provide input, please contact Brian Fields, P.E., City Engineer,
(407-327-7597). If you have any questions, please feel free to contact Brian or myself
Kipton Lockcuff, P.E.
Utility/Public Works Director