HomeMy WebLinkAbout2005 01 10 Informational Item 300 Status of Planning Projects
COMMISSION AGENDA
ITEM 300
CONSENT
INFORMATIONAL X
PUBLIC HEARING
REGULAR
January 10,2005
Meeting
MGR. (l-" IDEPT II)/'
Authorization
REQUEST: Community Development Department is advising the City Commission of the
status of various current planning projects.
PURPOSE: This agenda item is to update the Commission on the status of current planning
projects.
CONSIDERATION:
(1) Badcock Shopping Center - The final site plan, development agreement, and a general
depiction of signage were approved at the June 28, 2004, City Commission meeting. Staff has
reviewed the building plans and awaits revisions. No pre-construction meeting has been
scheduled, at this time. per 8/09/04 agenda.
(2) Barclay Reserve (Previously Barclay Woods) - 88 Units. At its October 11, 2004, meeting,
the City Commission approved a modification to the development agreement to expedite
provision of model home units. An aesthetic review of the town homes and entrance sign was
conducted at the October 25, November 8, and November 22, 2004, City Commission
meetings. The final plat and restrictive covenants are scheduled for this City Commission
meeting.. per 01/10/05 agenda
(3) Belle Avenue Warehouse - Plans for a 4 building (3 new buildings totaling 9,000 SF and
one existing 2,728 SF building) warehouse complex on 1.174 acres were received on August
10,2004, and received DRC review on August 24 (revisions reviewed on January 4). On
November 17, DRC reviewed applicant's request to have part of David Street vacated (at the
rear of his property), and recommended approval. The vacation is scheduled for this meeting
(Ist reading of Ordinance No. 2004-52 was December 13). per 01/10/05 agenda
(4) Bledsoe Estates Plat - A final subdivision plat for dividing an existing 5+ acre platted lot,
located at the southeast comer of S. Moss Road and Bahama Road, into 2 lots, was received
June 10,2004. The plat was reviewed at the June 15,2004 DRC. per 9/13/04 agenda
January 10, 2005
Information Item 300
Page 2
(5) Bruster's Ice Cream - The site is located at the southeast comer of Costa Rica Drive and
SR 434 and abuts Hacienda Village. Final engineering/site plans for a 1,213 square foot ice
cream drive-thru facility on 1.35 acres were submitted on May 5,2004. Revised plans went to
the DRC on September 7, 2004. A concept plan, complete with renderings was presented at
the September 20 City Commission meeting. A revised architectural rendering of the building
was accepted at the November 22 meeting. The final engineering/site plan will be reviewed at
the January 5 P&Z. per 01/10/05 agenda.
(6) Carnero Office Site - On October 15,2004, the final engineering plans to convert an
existing residence (approximately 1,400 SF) at the NW comer of Charles Street and SR 434
was received by the City. It was reviewed at the October 19 DRC. Staff received a resubmittal
on November 29. per 12/13/04 agenda
(7) Dlutz (Apex)Transmission Shop - The final engineering/site plan and aesthetic review
were approved at the October 25,2004, City Commission meeting. A preconstruction meeting
was held on November 9. per 11/22/04 agenda
(8) Harbor Winds (a.k.a. Big Cypress) - 94 Units. The conditional use for town-homes on the
15 acres east ofthe Golf Terrace Apartments approved at the August 9, 2004, City
Commission meeting for a maximum of94 unit (6.27 d.u./acre). Ordinance No. 2004-49
extended the approval of a conditional use from 6 months to 2 years. per 01/1 0/05 agenda.
(9) Highlander Property(Town Homes) - 170 units. A concept plan was approved on August
23,2004, for as many as 170 town home units on 11 acres of unincorporated county enclave,
located between Tuskawilla Trails and SR 434. An Annexation and Pre-development
Agreement was approved at the September 20, 2004, City Commission meeting. Reynolds,
Smith and Hills met with the staffDRC on October 12 for a pre-application meeting. The
property was annexed on October 25,2004. The City Commission held a transmittal hearing
to change the land use on October 25,2004. per 11/22/04 agenda.
(10) Highlands Apts., Phase II - The 42 unit apartment (3 floor) final site plan was approved
on March 8, 2004. There have been delays, due to conflict with the existing storm-water
system at Seville on the Green. The water system installation had also been held up, while
waiting for FDEP clearance. Workers have completed the storm system and are constructing
the block wall along the building pad. per 12/13/04 agenda
(11) ICI Homes- 480 condo units. 80,000 SF of office. A Large Scale Future Land Use
change was transmitted to DCA on October 25,2004.
(12) JDC CalhounPhase II - 100,000 SF Retail. (350 Units over retail). Future = 400,000 SF
retail, 500 residential units. Construction continues. Buildings 8, 9, 10, 11, 12, 13, and 14 have
received certificates of occupancy (COs). Building 1 has received its certificate of completion.
Building 2 is under construction. City records indicate the following businesses are locating in
the JDC Calhoun Town Center:
Building 1 - Tijuana Flats (restaurant), Art Studio, Cristiano's (wine bar cafe), a coffee shop,
an Italian restaurant;
Building 8 - Leslie Pool Supply, a dentist, tutor, and a tanning salon;
January 10, 2005
Information Item 300
Page 3
Building 9 - Red Bug Cleaners, E-Nails, Great Clips, Famous Uncle AI's Hotdogs, and
Subway;
Building 10 - Washington Mutual;
Building 11 - State Farm, H & R Block, Rachel Nicole's Salon, Shape Xpress, and a dentist;
Building 12 - Publix;
Building 13 - Winter Springs Liquors, Mailboxes, Etc., and Choice Cellular;
Building 14 - Papa Via's Take & Bake and China Feast; and
Building 15 - Wendy's.
On September 15,2004, the City received final engineering plans from Lochraine Engineering
for the northeast portion of the JDC site (that area north of Tree Swallow Drive and east of
Cliffrose Drive including buildings 3, 4, 16, & 17). The latest submittal will be reviewed at the
January 11 staffDRC. Final engineering had not been completed for that portion of the
approximately 15 acre site. per 01/10/05 agenda
(13) Jessup Reserve (previouslyBarclay II) 207 Units. At its October 11, 2004, meeting, the
City Commission approved a concept plan for as many as 207 town house units with rear-
loaded 2 car garages and 128 on-street parking spaces on 17.15 acres along the south side of
Orange Avenue. Final Engineering plans were submitted on November 15 and were reviewed
at December 16 DRC. Orange Avenue must be rebuilt to accommodate this or the proposed
adjacent development. Storm-water management and financing for Orange Avenue are major
issues. per 01/10/05 agenda
(14) Medallion Convenience Store - Final engineering/site plans were submitted for a
convenience store and car wash at the SW comer of SR 434 and Hayes Road, on March 24,
2004. This site is adjacent to the intersection that was demonstrated to need an east-bound
right-hand auxiliary turn lane. The applicant's team has been advised of City Commission
concerns about a car wash at that location. Staff (including the City Attorney) met with
applicant on November 22,2004, to discuss application status. per 12/13/04 agenda
(15) Miranda - Site clearing is completed and no further activity has occurred on-site. per
7/12/04 agenda
(16) Moss Road Town homes - 84 units. At its April 12, 2004, meeting, the City Commission
approved the Metropolis Homes conditional use application and concept plan to build as many
as 84 condominiums and commercial development on an "L" shaped 9.10 acre site fronting on
both SR 434 and Moss Road, adjacent to the Bank of America and Victorio's Pizza. On
September 20, the City Commission approved a 6 month extension for the conditional use. per
10/11/04 agenda
(17) Nursery Road (Phil Reece) - The final engineering/site plan was approved at the March
8, 2004, City Commission meeting and a preconstruction meeting was held on March 30. The
City Commission approved the aesthetic review of the first new building at its July 12, 2004,
meeting and a building permit has been issued. Crews are installing the infrastructure
(working on the storm-water facilities and have completed a portion of the potable water
system). Shop drawings for the pre-cast concrete structures as well as the site sanitary and
water facilities have been approved. per 12/13/04 agenda
January 10, 2005
Information Item 300
Page 4
(18) Landings @ Parkstone - 104 Town Home units. A PUD master plan amendment,
preliminary subdivision plan, and final subdivision plan were approved by the City
Commission at its July 26,2004, meeting. On September 1, a revised final engineering plan
was submitted, proposing to re-locate the entrance more southerly along Parkstone Boulevard
and lower the approved final grade. Morrison Homes has sold the site to First Orlando
Development Co., Inc. (per City Attorney) and a revised Development Agreement is
forthcoming from the City Attorney. A PUD master plan amendment, modified final
engineering plans, and aesthetic review were discussed at the December 13, 2004, Commission
meeting and were continued. per 01/10/05 agenda
(19) Public Works Site Plan - Final engineering plans for the City Public Works complex on
Old Sanford-Oviedo Road were received on December 23, 2004, and are scheduled for the
January 11,2005, DRC.
(20) Sprint- On August 27,2004, Sprint (applicant) and Spectra Site (tower owner) submitted
plans to co-locate and extend the existing 144.5' tall telecommunications tower on the Weaver
site, between Barrington Estates and DeLeon Road. The applicant proposes to extend the
height of the tower as much as 20' and add a Sprint antennae. The City Attorney has advised
staff to process this as a special exception for the additional equipment near the tower, using
pertinent Seminole County regulations. At its November 4 meeting, the Board of Adjustment
recommended approval, subject to staffs recommendations (landscaping). The special
exception request was tabled at the November 22 Commission meeting. A workshop will be
held in March to discuss the county's FLU/ zoning requirements. per 01/10/05 agenda
(21) SR 434 Retail (a.k.a. Villagio) - Vertical construction continues - the 2 out-buildings are
being constructed and brick work is being done on the front of the main building. The
applicant is nearing completion of the building shell for the major structures. Potable water
main issues with the FDEP have been resolved. Concerns about light spillage and wall height
were raised during public input at the November 22, 2004, City Commission meeting. per
12/13/04 agenda
(22) Tuscawilla Square - On June 2,2004, a preliminary site plan was submitted for
Tuscawilla Square, a restaurant and retail development, totaling 13,600 square feet, on 1.41
acres at Gary Hillary (formerly Colt) Drive. The existing Tuscany Restaurant currently
occupies a portion of the site. The applicant has been negotiating a development agreement
with the City Manager and City Attorney. A re-submittal was reviewed at the July 20 DRC
and the overall project was subsequently addressed with the City Manager, City Attorney, and
planning staff. A new re-submittal was provided January 5. A concept plan was approved at
the November 22 Commission meeting. The development agreement was approved on
December 13,2004. per 01/10105
(23) Winter Springs Town homes - Preliminary plans for approximately 436 town-homes on
40 acres within the Town Center were received from Engle Homes on July 2 and were
reviewed at the July 20 DRC. The City Commission approved a concept plan at its August 9,
2004, meeting and refined it at its September 27 meeting. The City Attorney noted that the
concept plan, as proposed, would require a development agreement or special exception or
January 10, 2005
Information Item 300
Page 5
both. Final engineering plans were submitted on November 15, and will be reviewed at Dec 16
DRC. per 12/13/04 agenda
Board of Adjustment
(24) The Lacey building setback variance request was deferred until the City Commission
adopted the new waiver/variance ordinance and is scheduled for the January 6 BOA meeting as
a waiver request. On December 27,2004, the City received a conditional use request to
demolish and replace an existing barn at 405 S. Moss Road. per 01/10/05 agenda
FUNDING: None required
RECOMMENDATION: None required
ATTACHMENTS: None
COMMISSION ACTION: