REQUEST: The Community Development Department requests that the City Commission and
Local Planning Agency (LPA) conduct a workshop to review the recommendations of
Land Design Innovations (LDI) for the Evaluation and Appraisal Report (EAR) based
amendments to the Housing, Water, Sewer, Drainage, Aquifer Recharge, Capital
Improvements, Recreation and Open Space and Intergovernmental Coordination
elements/subelements of the City of Winter Springs Comprehensive Plan.
PURPOSE: The purpose of this item is to solicit comments and recommendations for the EAR
Based Amendments to the Comprehensive Plan from the City Commission and LP A,
prior to formal consideration and transmittal to the Department of Community Affairs
(DCA).
CONSIDERATIONS:
The Comprehensive Plan is the guiding document that identifies the future
development patterns in the City and the services that will be necessary to meet the
demands of future growth. The City's Comprehensive Plan was adopted in 1992 and
was based primarily on data available as of 1990. The City is required by State
Statutes to prepare an evaluation of the Comprehensive Plan and update the
Comprehensive Plan with current data every seven (7) years. The City successfully
completed the evaluation of the Comprehensive Plan, which was determined sufficient
by DCA.
The City originally had until September 26, 2000 to complete the update of the entire
Comprehensive Plan, which afforded the Comprehensive Planning Coordinator
eighteen (18) months to complete the task. The Comprehensive Planning Coordinator
subsequently requested a six (6) month extension to complete the amendments by
March 26, 2001, and the request was granted by the State. However, the
Comprehensive Planning Coordinator left the City on March 26, 2001 without having
completed any of the required updates to the plan. The Community Development
Director reviewed the situation and immediately requested another six (6) month
extension from the State to complete the EAR Based Amendments. In response, the
October 1, 2001
Regular Agenda Item A
Page 2
State extended the deadline to September 26, 2001 in a letter dated May 4, 2001; the
State has no authority to issue additional extensions. Therefore, if the Comprehensive
Plan updates are not completed by September 26, 2001, the State will no longer allow
the City to process large scale comprehensive plan amendments.
The Evaluation and Appraisal Report for the Comprehensive Plan identified that the
entire document was poorly written and should be completely re-written as part of the
EAR Based Amendments. This was an enormous undertaking that was further
complicated by the resignations of both the Comprehensive Planning Coordinator and
Current Planning Coordinator in March 2001. Consequently, a supplemental
appropriation of $46,310 from the General Fund was approved to hire LDI to prepare
the EAR Based Amendments to the Comprehensive Plan.
STATUS REPORT AND ADOPTION SCHEDULE:
A complete copy of the comprehensive plan, containing second drafts of all elements
was distributed on September 11,2001. This submittal addressed and/or included the
comments and recommendations of the City Commission, LP A and staff.
Based on discussions by the City Commission and LP A at their August 20, 2001
workshop, specific elements of the comprehensive plan were originally planned for
discussion over a series four (4) special meetings, the first and second of which
occurred on September 13,2001 and September 25, 2001, respectively. At the
September 25,2001 meeting, the City Commission and LPA decided to cancel Special
Meeting 4 and consider all the remaining elements at Special Meeting 3. The revised
schedule for special meetings is as follows:
Special Date Elements Discussed Discussion Status
Meetinl!s
I 09-13-01 Population, Future Land Use, Complete
Transportation
2 09-25-0 I Conservation, Solid Waste Complete
3 10-01-0 I Housing, Water, Sewer, Drainage, Incomplete
Aquifer Recharge, Capital
Improvements, Recreation and
Open Space, & Intergovernmental
Coordination
Following the completion of the scheduled workshops, the plan adoption schedule is
projected as follows:
. November 7, 2001
. November 26,2001
. November 28,2001
. May 1,2002
. May 27, 2002
Local Planning Agency Public Hearing
City Commission Public Hearing for plan transmittal
Plan transmittal to DCA
Local Planning Agency Public Hearing
City Commission Adoption Hearing
October 1, 200 1
Regular Agenda Item A
Page 3
RECOMMENDATION:
Staff recommends that the City Commission and LPA REVIEW, RETAIN, AND
BRING the complete draft of the Comprehensive Plan to the workshop for discussion,
in order to provide direction to LDI.
COMMISSION ACTION: