REQUEST: City Manager requesting the Commission to review plans and costs related
to Magnolia Park, streetscapes in the Town Center and fencing of the Town Center
retention pond located behind City Hall.
PURPOSE: This agenda item is needed to provide the Commission additional information
regarding the design and cost of streets and streetscapes on Town Center streets, Magnolia
Park, and the retention pond located behind City Hall.
NOTE: Updated concepts and costs will be presented at the Commission meeting,
CONSIDERAli'ION: On October 8,2001, Conklin, Porter & Holmes, the City's Consulting
Engineering Firm presented the Commission with concepts for streetscapes inthetown'Center-
and the retention pond located.-behind City Hall.
The Commission provided numerous comments and requested that the consultant return to the
Commission with updated concepts incorporating the Commission's comments,
FUNDING: Funding for Magnolia Park, and street and drainage improvements will be
provided by the Local Option Infrastructure Sales Tax, 1999 Revenues Bond Issue, Road
Improvements Impact Fees, and T-21 Transportation Grant Funds.
RECOMMENDATION: It is recommended that the Commission review the prepared plans
and costs and provide staff with direction the Commission deems appropriate.
A TT ACHMENTS:
October 8, 2001 Regular Agenda Item "C".
COMMISSION ACTION:
; "~
COMMISSION AGENDA
ITEM
c
CONSENT
INFORMA TIONAL
PUBLIC HEARING
REGULAR X
October 8, 200 I
Meeting
MGR
IDEPT
Authorization
REQUEST: Public Works Department Presenting the Hickory Grove Park Boulevard and
Main Street Engineering drawings
PURPOSE: The purpose of this Board item is to provide a brief presentation to the City
Commission of the proposed construction improvements for Hickory Park Grove
Boulevard and Main Street prior to bidding.
CONSIDERA TIONS:
This presentation is being provided to bring the City Commission up to date on the
final design of the Hickory Park Grove Boulevard and Main Street construction
improvements. Terry Zaudtke, P.E, and David Mahler, P,E, ofCPH Engineers, Inc, will
briefly provide an overview of the 'road layouts, intersection geometry, improvement
schedule, and aesthetic improvements. Once the Commission provides their input and
direction, the plans will finalized for bidding.
RECOMMENDA TIQN:
It is recommended that a City Commission provide any input deemed
appropriate for the engineer to finalize the construction drawings.