Loading...
HomeMy WebLinkAbout2006 02 13 Consent 403 Architectural Engineering Starmer Ranaldi Planning Utility Public Works Compound COMMISSION AGENDA ITEM 403 CONSENT X I February 13, 2006 Meeting MGR / DEPT Authorization REQUEST: Public Works Department Requesting Authorization for Architectural/Engineering Construction Administration Services with Starmer Ranaldi Planning and Architecture Inc. for the Utility/Public Works Compound Construction PURPOSE: The purpose of this Board item is to receive approval for Construction Administration Services with Starmer Ranaldi Planning and Architecture Inc. for the Utility/Public Works Compound at a cost $30,000. CONSIDERATIONS: This agenda item is needed to provide supplemental construction administration services for the construction of the Utility/Public Works Compound. City staff will provide the primary construction administration function and inspection but there are professional architectural services (structural, mechanical, electrical, etc.) required that are outside the expertise of staff The proposed scope of services include permitting assistance, shop drawing reviews, responding to Requests for Additional Information (RA!' s), drawing clarifications, limited periodic inspections, and review of pay applications. Consultant time is estimated at 6 to 8 hours per week for the 12 month project duration. The cost for these services is projected at $30,000. SRI was previously approved by the City Commission for continuing services for general architectural services in response to RFP-008-99-KL on March 22, 1999. They performed the design of the Utility/Public Works compound. Consent Agenda Item 403 February 13, 2006 Page 2 FUNDING: The funding source of the $30,000.00 will be the Utility/Public Works Capital Project Fund line code (311-65000-30037). Sufficient funds are available for these services. RECOMMENDATION: It is recommended that the City Commission authorize Architectural/Engineering Construction Administration Services with Starmer Ranaldi Planning and Architecture Inc. for the Utility/Public Works Compound at a cost of $30,000 from the Utility/Public Works Capital Project Fund line code (311-65000- 30037). IMPLEMENTATION SCHEDULE: The scope of work will be performed during the 12 month construction period. ATTACHMENTS: 1. SRI Professional Service Proposal COMMISSION ACTION: Planning and Architecture Inc Ranaldi 18 Jan 06 Kipton Lockcuff Director of Utilities and Public Works City of Winter Springs 1126 East SR 434 Winter Springs, Florida 32708 Re: Public Works Complex NE Design Services Professional Services Proposal Kip We appreciate the opportunity of being your design consultant for the above referenced facility, have enjoyed working with you and your staff through out this project and offer the following proposal for construction administration services for your review and consideration. I. Scope of Project Construction of 3 buildings including all associated site work for the new Public Works Complex located on Old Sanford Oviedo Road in the City of Winter Springs. II. Scope of Basic Services sri shall provide construction administration services for this project including architecture, structural engineering, mechanical engineering, fire protection engineering, and electrical engineering with the following tasks: A. Periodic problem solving B. Periodic site inspection C. Review and approval of shop drawings D. Review and approval of written requests for information from the contractor E. Review and approval of written requests for clarification from the building official F. Review and recommendation on change orders G. Review and recommendation on contractor payment applications H. Assistance with obtaining all close out documentation from the contractor III. Scope of Additional Services The following services are considered beyond the scope of basic services and can be provided by sri upon confirmation of scope and written authorization of the client: A. Owner / Contractor dispute resolution B. Contractor / Sub-contractor dispute resolution C. Public hearing and/or presentations D. Expert witness / legal testimony IV.Schedule of Fees a.Hourly at $ 95 per hour not to exceed $ 30,000 b.We anticipate this to be approximately a 12-month project and we estimate our involvement to be approximately 6 to 8 hours per week, which at $ 95 per hour is $ 30,000 +1-. V.Clarifications A. Fees quoted herein are based on our current understanding of the scope of work and should the scope change significantly additional compensation may be warranted. B. Note fees quoted herein are based on public works staff performing the daily on site inspections, attendance at all meetings, and documentation of progress. We trust this proposal will be well received and we look forward to helping you make this project a continued success. Regards William E. Starmer AlA, NCARB President