REQUEST: Community Development Department presents to the City Commission a
revised phasing plan for the 15.08 acre IDC Calhoun, Inc. property.
PURPOSE: The purpose of this agenda item is to present to the Commission a revised phasing.
plan for development of the IDC Calhoun, Inc. property.
APPLICABLE LAW:
Development Agreement between JDC Calhoun, Inc. and the City of Winter Springs dated
August 1, 2000.
First Modification Agreement between JDC Calhoun, Inc., and the City of Winter Springs
dated July 2,2001
CHRONOLOGY:
The Development Agreement dated August 1, 2000 between IDC Calhoun, Inc., and the City
of Winter Springs included a phasing plan.
The First Modification Agreement dated July 2, 2001 between IDC Calhoun, Inc., and the City
of Winter Springs introduced a revised phasing plan to accommodate drainage in the east and
west basin.
The City Manager presented the phasing plan, which was approved as part of the Final
Development Plan (Public Hearing Item C) on October 22, 200 I.
The developer presented a revised phasing plan on October 26, 2001 which is consistent with
the existing development agreements and in effect reschedules the buildings on Main Street
from phase II to phase 1.
Regular "Cn IDC Calhoun
October 29,2001
FINDINGS:
· The revised phasing plan is consistent with the existing development agreement and
the modified agreement.
· The revised phasing plan creates the desired character of a Town Center through the
design and construction of one side of Main Street in the first phase of
development.
RECOMMENDATION:
Staff recommends approval of the revised phasing plan presented by IDC Calhoun, Inc.
ATTACHMENTS:
a) Phasing plan presented and approved October 22, 200 I.
b) Proposed phasing plan presented by the developer October 26, 200 I
COMMISSION ACTION:
ATTACHMENT A
00
t::
-r-!
"Cl
r-l
-r-!
;:::l
..c
H
Q)
t::
-r-!
r--. r-l
~
:<
'" 'r-!
~r-l
~..c
;:::l
L/") "'~
~ r--.
Q)
'" ",.c
N~ ..,
~
"'''Cl
"'L/") t::
~ Cil
~ '"
-.:to
'" "I
0 '"
~ C"') '"
0'\
'" "'~
0'\"1
'"
'" "'00
00 ~ ~
efJefJefJ
000
ZZZ
H H H
~~~
....:l....:l....:l
HHH
::J::J::J
~~~
I I I
I I I
~ "I C"')
WWW
efJefJefJ
~~~
~~~
"
,;
~
"
,
+~ri
"
"
,.::~~;
~OOC 6v :Lv :~~ 92 ~JO ~JJ 5MP'2NVld3SVHd\u5ISaO\800L9c\5MP\:H
. ....'4.,.6(\).
.... '4"'\"'\\1"-
O.."Ogo
I
;
I
I
I
I
I
i
I
~
:~!
a.oC CllOJ3H
_8
o NOU~n>LlS~
NOUdllOS3C
b
!:!-
CIODIJ.~.
':)fIll 'DMGlJC)1O (M\' fIOatJ
..,...... IOU... U''OHt_ ~
..0 CDWO:J ]I 10M .lo", IIft"'\d lS>>U
_lfVNI"nJHd 0 'IlOJ C31lSS'
KlI .... lOlYlllOHlrtr A 1LY.UUD3
DfilMJ]M')MJ CM'f
IDCaO CDGlIOJI Y ,..
CDSSIDGNJ . aJIIOI ISTN'1 0'lVA JCWIl
1WDlt.r....p,.o'_ ................,........, AO
tdo-lItt: Ctat)30.I CO;:O-bt: (lOt)=-.l ::W~. ..'~'
...,,-- @!1"~ ~
tOt WI,. '1'OOtt..., PYDS SOU .-.n~~ ;l.: i:~ri..."
""Vl' "V/
~_ ~ocIw<>opurJ ,. i' . " "
~0IIlIJJ.__~1'Cl
'ONI 'NnOH1VO oar
NVld 311S 3SVHd lvn1d30NOO
N
1.:1 'SDNIHdS H31NIM
H31N30 NMOl S9NIHdS H31NIM L:::-zo
ATTACHMENT B
,-,
"
PAVING ALTERNATES SUMMARY
TUSKAWILLA ROAD
a.k.a.
MAIN STREET
1 of 3
i\
,
Statistical Facts
Total Paved Area
63,900 sq. ft.
Accent Areas
Paved - Standard
Concrete Pavers
48,900 sq. ft.
15,000 sq. ft.
Pavement Type Unit Prices
Standard Asphalt $2.00/sq. ft.
Stamped Asphalt $7.47/sq. ft.
Stamped Concrete $10/sq. ft.
Concrete Pavers $4.50/sq. ft.
20f3
'-
Comparison of Probable Construction Cost
Pavement Type
Standard Asphalt
Standard Asphalt w/Concrete Pavers
(Accents)
Standard Asphalt w/Stamped Asphalt
(Accents)
Standard Asphalt w/Stamped Concrete
(Accents)
Stamped Asphalt Entire Area
Estimate
$127,800
$165,300
$209,850
$247,800
$477,333
3 of 3
2.
>=
-~
~-
.~
~=:
~.,
~
~
~
~=:
.~
~
~-4
?--4
.~
~-4
~
~
~
~.
~
=:
~
..