HomeMy WebLinkAbout2001 12 10 Informational A Tarcaso Park Expansion
COMMISSION AGENDA
ITEM A
CONSENT
INFORMA TIONAL X
PUBLIC HEARING
REGULAR
12/10/2001
Meeting
MGR. P ~EPT C. ,(/
Authorization
REQUEST: The Parks and Recreation Department is informing the City Commission of the
Preliminary Site Plan, Design Development Schedule and Construction Budget of the
CDBG Funded Torcaso Park Expansion.
PURPOSE: The purpose of this item is to inform the City Commission of the progress in the
Torcaso Park Expansion.
CONSIDERATIONS:
. On August 13, 2001, The City Commission approved the Seminole County/City of Winter
Springs Inter-Local Agreement Community Block Grant Program.
. On November 12, 2001, The City Commission approved the contract with CPH for Consulting
Engineering Services for the Torcaso Park Expansion.
. Due to the site limitation, the football/soccer field will be reduced in size from 360' feet to 315'
feet long and thus be a practice field.
. Also the splash pad (playground) will be a re-circulation type rather than directly to drain and
underground fixture sprays.
FUNDING: N/A
1
RECOMMENDATION: N/A.
IMPLEMENTATION SCHEDULE:
January 2002
February 2002
Feb-June 2002
June 2002
July 2002
August 2002
December 2002
ATTACHMENTS:
Attachment # 1
Soils Information and Preliminary Engineering Design.
Final Design and Costs.
Approvals
Advertise
Accept Bid.
Construction
Close Out
CPH Letter, Site Plan, Dev. Schedule, and Construction Budget.
COMMISSION ACTION:
2
ATTACHMENT.. III
November 30,2001
CPH Engineers, Inc.
1117 E. Robinson St., Suite C
Orlando, FL 32801
Phone: (407) 425-0452
Fax: (407) 648-1036
www.cphengineers.com
Mr. Chuck Pula, Director
Parks and Recreation
City of Winter Springs
1126 East S.R. 434
Winter Springs, Florida 32708
RE: Torcaso Park
CPH Project No. W041 09
Dear Mr. Pula:
Attached please find a copy of a preliminary site plan, design development schedule, and
construction budget for the above referenced project. These exhibits, together with this letter,
will constitute a brief status report on the above referenced project.
The site plan is a reproduction of the layout prepared by SRI, inserted into an existing survey.
We are awaiting additional survey information to tie down the exact location of the
improvements. Please note that the layout specifies a soccer field and a "mini football field".
Site restraints limit the size of the football field to 315' rather than the normal full size 360' to
avoid modifying the existing ponds and playground layouts.
On Wednesday, November 14, 2001, we met with Lori Solitro and Robert Keenan, Seminole
County, to discuss the requirements, conditions and limits of the CDBG funding.
On November 19, 2001, we met with Ron George, President of Raindrop Products to discuss
his equipment, design, costs, layout, etc. for a fully functional splash pad with play equipment.
He furnished us a list of similar splash pads in Florida. We understand that the Recreation
Department will evaluate sites where these products have been installed.
We conducted telephone interviews with Mr. John Bert, City of Kissimmee, and Mr. Bill Afgar,
Vol usia County Parks and Recreation, who were involved in the design, installation and
operation of similar water park playground equipment. We discussed their experiences with the
design and installation of this equipment and sent the City's Recreation and Utility Departments
copies of memos outlining the items discussed.
There has been considerable discussion about the advantages, disadvantages, and cost of
using recirculated potable water system. The local Health Department informs us that the water
is to be treated to swimming pool treatment levels and as a result, the cost of equipment to
rechlorinate and recycle the water does not appear to be prohibitive. We recommend that
recirculated potable water be incorporated in the design.
SANFORD . ORLANDO . DELAND . PALM CITY . CAPE CORAL . JACKSONVILLE
We will meet with SJRWMD to discuss permitting issues and will proceed with the design as
soon as additional soil and survey information is received. In the meantime, we will fine-tune
the site plan so that design and permitting can proceed in accordance with this schedule. If you
have any comments, questions or concerns, please advise.
Sincerely,
Cc: Kipton Lockcuff, P.E.
J:IW04109IWD\PULA L TR RE PRELlMINARIES,DOC
~~
LL
/
+-
-..Ii
/" <;
~
WETlAND LINE ~
LSO
-- .!02 -1 . ~q4- _
- -- -+--. --J:.4~ j y ~
2S' EAsEMEIVT ~ .<..., _
-- V <YA~..>
--'" ~ /
I 'v:s --.-<' E OITCtI
~ EXIsrr<Q llITcH Rel.<lCAnc." _' "'-" ^'
"'?~......A-1.C'C6
PROPOSED POND ~
EXPANSION
~
~
vI?
/"
t:
III
~
z
:i
lL
~
:>l
a:
<(
lL
~
ff
g
~
~
'<
~\.
<.">)
,,",,
',,'"
'i-'"
'9'" ~ _
~ ~. ~ . r--
<.~.,,,, ~<;:; !
rvr~' ~ --\
.. <..\}." ~<;,' i
f!-'" 'c" ",," I
'<>"'~:i' ~" !
, P0'i;0~~SS I
\ .....,gJ:v~'-~...
n\_ '~~""
I
Y
~ S
~ ~ ~
z z ~
~ w ~
~
lil ..
0
L'?:;:;
I ii~~fi!
h~i~i~
:~lf.~ij{t
. ~!-.-
~ ~{=i;
~ O!~li
- ~
r Off' IiIIDiWr~~ SPRINGS
~
Dr f>Av(~'",,,
. ~
\JL ...\>..... \.J,
- /'
.5' ctJNf'Ji!:rc IJ~I(
City of Winter Springs - Torcaso Park
Novembel DecemberT January I February I March
I I I I
ID T ask Name I Duration I Start I Finish
1
-
2 Meeting with Client o days Wed 11/14101 Wed 11114101
-
3 Submit for City agenda o days Fri 11/30101 Fri 11/30101
-
4 Submit exhibits, reports, etc, o days Man 12103101 Mon 12103/01
-S City Commission Briefing o days Man 12/10101 Man 12110/01
Ii Receive soil. survey information o days Mon 01/07102 Man 01/07102
-
7 Prelim, Engr, Design 14 edays Mon 01/07102 Mon 01121/02
-
8 Meeling WI City Staff o days Mon 01/21/02 Mon 01/21/02
-
g Final Design and Cost Eslimate 20 edays Wed 01/30/02 Tue 02l19/02
~ Approvals 150 edays Wed 02120102 Sat 07120/02
I- Mon 06124/02 Mon 06124/02
11 Advertise o days
I-
12 Accept Bids 1 day Man 07122102 Mon 07122102
I-
13 Check References I Award o days Man 08126102 Mon 08/26102
I-
14 Construction gO edays Man 08126/02 Sun 11/24102
I-
15 Close Out 30 edays Sun 11/24102 Tue 12124/02
Task
Project: T orcaso Park
Date: 11116/01
Revised 11127/01
Split
Progress
.11114
tt1130
!+ 12103
.
Milestone
Summary
Rolled Up Task
12110
, ,
, ,
~'
. . d1l21
lii)H'I
I
.
.....
.....
Page 1
I April
I
1 June
I
TJuly
I
August I Septemb I October I Novembe I December
I I T I
I May
,I
:
:
: :
:
:
: : :
i i::::i,j i" i;. n ~
i ":,,," '1
, · ~06124 t
Rolled Up Split
External Tasks
Rolled Up Milestone
o
Project Summary
Rolled Up Progress
. : 08126
U::'
I
V
:; PdUiiii
,,!iiIHI~!
".."" H
!
V
Torcaso Park Expansion
Opinion of Construction Value
Improvement Item
Parking (60 cars)
Full Size Soccer/Football Field
Splash Pool (8 Features)
Mitigation Wetland 4 (.82 Acre)
Sidewalk
Clearing
Fill
Walkway Lighting
Landscaping
Irrigation
Environmental Design & Permitting
AlE Design and Permitting
Project Contingency
Total
Cost
$ 90,000.00
$ 55,000,00
$175,000.00
$ 35,000.00
$ 8,000.00
$ 5,000.00
$ 15,000.00
$ 5,000.00
$ 10,000.00
$ 8,000.00
$ 6,000.00
$ 32,480.00
$ 40.600.00
$485,000.00