REQUEST: The Parks and Recreation Department is requesting that The City Commission
consider 2 approaches in regards to the Batting Cage Project at Trotwood Park, and
establish the appropriate direction.
PURPOSE: The purpose of this item is to receive direction on these approaches to finish this
project.
CONSIDERATION:
. On June 12, 2000, the City Commission approved charge order #2 to the Parks
Improvement Program, which included a dual batting cage at Trotwood Park,
at a cost of $ 52,348.00.
. On October 23, 2000, Homeowners, adjacent to Trotwood Park expressed their
displeasure with the location of the batting cage that was under construction.
Staff was directed to meet and come back with a creative solution.
. On November 30, 2000, a meeting was held.
. On December 2, 2000, Staff, Bill Starmer, and Homeowners met at Trotwood
Park to look at alternative locations.
. The homeowners, Winter Springs Little League, and staff support approach #2.
u. ~ ~~.
Approach #1
Complete batting cage with contractor at current location. $ 52, 348
City provides a landscape buffer from Tree Bank
Program. $ 4.000
$ 56,348
Approach #2
Relocate batting cage.
. Batting cage cost to date.
. Retain sub-contractor to install new cage.
. City install new concrete slab.
. City install electrical service & outlets.
. City install resilient slab surfacing.
. City install drainage pipe.
. City install landscape buffer
. City demolishes existing batting cage.
$ 30,348
$ 8,000
$ 5,500
$ 2,000
$ 5,000
$ 1,500
$ 2,000
$ 2.000
$ 56,348
FUNDING:
No additional funding needed. City labor, equipment, and tree bank funding
for landscape buffer in the amount of $ 4,000.
RECOMMENDATION:
The Parks and Recreation Department is recommending the second approach,
which involves relocating the batting cage, using City staff for most of the
construction and to provided a landscape buffer from the tree bank program.
IMPLEMENT A TION SCHEDULE:
Work order to begin on January 9, 2001, estimated completion, end of February
2001.
A TT ACHMENTS:
Attachment #1
Attachment #2
Minutes of batting cage meeting.
8M letter & drawing.
COMMISSION ACTION:
2
"
'- "~
.'
ATTACHMENT {fl
CITY OF WINTER SPRINGS, FLORIDA
<C~fP>Y
1126 EAST STATE ROAD 434
WINTER SPRINGS. FLORIDA 32708-2799
Telephone (407) 327-1800
MINUTES
BATTING CAGE MEETING
NOVEMBER 30, 2000 7:00PM
CITY HALL
This meeting was held on Thursday, November 30, 2000 with the following people in
attendance:
Participants:
Ron McLemore
Chuck Pula
Bill Starmer
Rosie Lombard
Wayne Conine
Louise Conine
Bill Bennett
Mary Jo Walsh-Bennett
Annette Pursley
Marc Arnold, Sr.
Lorraine Arnold
Lisa Hoekstra
Sal Aguda
City Manager ~
ParksfRecreation Director
SRI, Inc.
747 Sybilwood Circle
745 Sybilwood Circle
745 Sybilwood Circle
734 Sybilwood Circle
734 Sybilwood Circle
735 Sybilwood Circle
749 Sybilwood Circle
749 Sybilwood Circle
741 Sybilwood Circle
741 Sybilwood Circle
The purpose of this meeting was for the residents adjacent to Trotwood Park and staff to
discuss the neighbors concerns about batting cages and alternatives for resolving these
. .
Issues.
The residents noted the visual problems, sound problems, excessive pedestrian traffic, and
kids urinating in their yards as their major concerns.
The residents also desired that the concrete pad be demolished rather than adopted for
some other type of recreational purpose.
It was decided that the cages should be moved to another location in the park further away
from the houses.
A meeting will be held in the Park this Saturday to further define the alternative location.
The meeting adjourned at!approximately 8:30PM.
cc: Mayor and Commfssion
Ijp
!
- I'"J .,
Battin Ca es at Trotwood Park are
'. w' ~. ", . . '"
well hidden from general-public by mature trees.-
~
- ""', "'.
~
~.:'
--0'
- "
; .:"'!
~ ~:..,k~"~~';
.~ ", ';.~
. ..'--&.;-0. " '" '.".~ r.
. . ~.
.'- ,'..
t,"~
..:~~ ~.' ", .
.' ~ .....,..
. t~.
.~ ;....
,. !
elwin-lillked cages., heavy netting, secluded areas.
and e.xcessiJ'e Iloise so close to so many homes will
subject Sybilwood Circle residents and homes tv
criminal mischief especially at night as-1Ycl1 as
result in a loss of property values. and a decline in
_ q~;tJ.!tY.9{Uf~.
ATTACHMENT 112
t' ~ '~.....;;.... .
srI
14 Dec 00
Chuck Pula, Director
Park and Recreation Department
City' of Winter Springs
1000 East SR 434 .
Winter Springs, Florida 32708
Re: Trotwood
Batting Cage
Chuck
Based on our meeting at the City with you, Kip Lockcuff, and Alan Hill, there are basically two approaches
to finishing out the batting cage project which are summarized below including their associated costs:
1. Leave the batting cages where they are (location "a" on attached site plan) and provide a
landscaped buffer per our 20 Oct 00 letter.
a) batting cage construction cost
b) landscape buffer
. total
$ 52,348
$ 4.000
$ 56,348
2. Relocate the batting cage per our meeting with the local residence (location "b" on attached
site plan) using City staff per our 2~ Nov 00 meeting.
a) batting cage cost to date $ 30,348
b}retain sub-contractor to install new cage $ 8,000
c} City install new cone slab $ 5,500
d) CitY install electrical service and outlets $ . 2,000
e) City.install resilient slab surfacing $ 5,000
f) City mstalldrainage pipe $ 1,500
g) City install landscape buffer $ 2,000
f)Cit;y demolish existing batting cage $ 2.000
total $ 56~348
Note that option no. 2 above is predicated on lowering the batting cage height down to 14' so that we can
cut off the existing 17' high poles at the slab and reuse them. This revised location also calls for the b!ltting
cages to be side by side vs end to end as in the original location. This lower height and side by side .
arrangement should be confirmed asnot creating a safety issue by the little league association. If this lower
height is determine not to be acceptable than you can add approximately $ 4,000 to the no. 3 option
construcUon cost above.
Please advise ~ which direction you would like us to proceed, so we can help you wrap up this portion of
the project.
Stanner Ranaldi Planning and Architecture Inc. AA-002984
890 Northern Way Suite E- I Winter Springs. Rorida 32708 Phone 407 977 1080 Fax 407 977 1019
,
~
.
DP~tIC>>tf.....
PA ~.IoIIIII!'"
.. ~T1CIoIIQCl8IIC.
PA"~~
pp 1"'lIOllC"'~
IC ~=-
SP ~..-o<;;
Il1l IIIIt~
SJl """"",..."
TC mHO =-
1]t rOT ,.""...y~
VB ....................
yp TQIt.. ~TCA:UC
Site Plan
e
. .. .~.
- ~
~ ~
'~J
e
,;aRT..
~
sri
.--
...,...cc_
e
"
;.