HomeMy WebLinkAbout2007 07 23 Public Hearing 502 Amendment to Aesthetic Review for West End Offices
COMMISSION AGENDA
ITEM 502
Consent
Informational
Public Bearing X
Regular
July 23,2007
Meeting
MGR.
REQUEST:
The Community Development Department- Planning Division requests the City Commission hold a
Public Hearing for an amendment to the previously approved West End Offices Aesthetic Review, to
include the buffer wall at the rear property line. West End Offices is under construction at 1135 E
State Road 434 in the Town Center.
PURPOSE: To encourage creative, effective, and flexible architectural standards and cohesive
community development consistent with the intent and purpose of Article XI - Minimum
Community Appearance and Aesthetic Review Standards.
APPLICABLE LAW AND PUBLIC POLICY:
Ordinance 2003-43, Aesthetic Review Standards, City of Winter Springs
Section 9-601. Approval prerequisite for permits.
Section 9-605. Submittal requirements.
Section 20-469 Buffers and Walls (SR 434 New Development Overlay District)
". . . shall construct, at the developer's expense, an opaque wall of six (6) feet in height along the full
length ofthe property line. . . The wall shall be constructed of concrete block, brick, or other durable
material (wood not allowed) which is compatible with the surrounding area, and acceptable to the
development review committee as to compatibility, design, and compliance with this section and the
City Code... The wall requirements of this section shall apply along the boundary of property that
also constitutes the outer perimeter of the existing area zoned Town Center."
CHRONOLOGY:
Feb. 27.2006- Concept Plan Approval
June 26. 2006-Aesthetic Review Approval
Aug. 14. 2006-Final Engineering Approval
Dec. 1 L 2006-Development Agreement Approval
Jan. 8.2007- Modification to Development Agreement Approval
July 23, 2007
PUBLIC HEARING ITEM 502
CONSIDERA TIONS:
West End Offices is located on the south side of State Road 434 at 1135 E State Road 434, immediately
west of Jesup's Reserve in the Town Center. It is currently under construction and will include two
matching, symmetrical office buildings, each three stories in height.
West End Offices previously received Aesthetic Review Approval over a year ago, but this Approval
did not include a review or approval of the rear buffer wall. City Code [so 20-469] requires an opaque
buffer wall of six (6) feet in height along the boundary of property that also constitutes the outer
perimeter of the existing area zoned Town Center. As a result, West End Offices is proposing a buffer
wall along its rear property line. The wall will buffer residents of the Tuscawilla Trails Manufactured
Homes Park from the West End Offices parking lot.
The request is for Aesthetic Review approval of this required buffer wall. The wall includes the
combination of both a retaining wall and a free standing, six (6) foot wall above it. The proposed wall
is to be constructed out ofthe same materials as the retaining wall surrounding the stormwater pond.
A thirty foot wide right-of-way extends along the southern property boundary. The Development
Agreement of Dec. 11,2006 allows the property owner to construct and maintain improvements (such
as the proposed buffer wall) in this ROW.
The submittal requirements for aesthetic review are set forth in Section 9-605 and include the
following: (a) a site plan; (b) elevations illustrating all sides of structures facing public streets or
spaces; (c) illustrations of all walls, fences, and other accessory structures and the indication of
height and their associated materials; (d) elevation of proposed exterior permanent signs or other
constructed elements other than habitable space, if any; (e) illustrations of materials, texture, and
colors to be used on all buildings, accessory structures, exterior signs; and (f) other architectural and
engineering data as may be required. The procedures for review and approval are set forth in
Section 9-603.
The City Commission may approve, approve with conditions, or disapprove the application only
after consideration of whether the following criteria have been satisfied:
(1) The plans and specifications of the proposed project indicate that the setting, landscaping,
proportions, materials, colors, textures, scale, unity, balance, rhythm, contrast, and simplicity are
coordinated in a harmonious manner relevant to the particular proposal, surrounding area and
cultural character of the community.
The proposed wall is to be constructed of grey split-face concrete block and is the same material
utilized around the retention pond. The buildings are also grey.
(2) The plans for the proposed project are in harmony with any future development which has been
formally approved by the City within the surrounding area.
The proposed wall appears in harmony with existing and future development in the area.
(3) The plans for the proposed project are not excessively similar or dissimilar to any other building,
structure or sign which is either fully constructed, permitted but not fully constructed, or included on
the same permit application, and facing upon the same or intersecting street within five hundred
(500) feet of the proposed site, with respect to one or more of the following features of exterior
design and appearance:
(A) Front or side elevations,
July 23, 2007
PUBLIC HEARING ITEM 502
(B) Size and arrangement of elevation facing the street, including reverse arrangement,
(C) Other significant features of design such as, but not limited to: materials, roof line, hardscape improvements,
and height or design elements.
The proposed wall is approximately 400' long and will include ten 2-foot wide pilasters every 40' to
help add dimension and detail. It will also include a concrete cap.
(4) The plans for the proposed project are in harmony with, or significantly enhance, the established
character of other buildings, structures or signs in the surrounding area with respect to architectural
specifications and design features deemed significant based upon commonly accepted architectural
principles of the local community.
The proposed wall will help screen the neighboring Tuscawilla Trails development from the West End
Offices parking lot. The wall is to be constructed of durable split-face concrete block that will require
little, if any, maintenance.
(5) The proposed project is consistent and compatible with the intent and purpose of this Article, the
Comprehensive Plan for Winter Springs, design criteria adopted by the city (e.g. SR 434 design
specifications) and other applicable federal state or local laws.
The West End Office Centre buffer wall meets the requirements of the city's design criteria as
specified in the Code.
(6) The proposed project has incorporated significant architectural enhancements such as concrete
masonry units with stucco, marble, termite-resistant wood, wrought iron, brick, columns and piers,
porches, arches, fountains, planting areas, display windows, and other distinctive design detailing
and promoting the character of the community.
The use of split-face concrete block material and the addition of the pilasters and cap gives detailing
and durability to the proposed buffer wall.
FINDINGS:
· The wall meets code requirements and is to be constructed of durable material.
· The wall includes plasters and a cap to give it detailing and make it more attractive.
The proposed wall is grey and will complement the buildings which will also be grey.
STAFF RECOMMENDATION:
Staff recommends that the Commission grant Approval of the amendment to the West End Offices
Aesthetic Review package.
ATTACHMENTS:
A. Buffer Wall Aesthetic Review package (includes site plan and elevation)
COMMISSION ACTION:
;' .:
hi I
!H ~
_zH
NVld 311S lVI::tn1031IHOl::lV
l~ 'SDNI~dS ~31NIM
3NO ~31N381\fNOISS3:jO~d ON31S3M
~ g ~ L
g~lld~ i~
lu
<8
~
~~
~~
Ol'
z1j
~!
~'I
(/)w
~o::
~
il
<0
m
!!I
z ;~
0
f=
z
t UJ
I-
UJ
Cl
, .- I-
UJ
~It :s:
.~
.~
~ t
(!(
.s
,.
ol
~~
~~
~g
".,'"G'I
J i ~d.'
II ij~~.
~ flit
II
dY:l'C+Ol
a.ioIOl'P""'.\
~'O"'O.l.
.0000'o........"\
I
..-, IT
II!
11".I.~i."".
i~!
IIi
I ~NIH3aN3H "YM N33H:>S I ! I I II
I I I
lj 'S~NllldS ll3J.NIM ~! !!: i
3NO ~3jN3~ ~JOlId ON31S'I\\ J ~ ~ i I I I
!'l
~
~
~
~
~
z
w
W
0:
o
III
"
W
"
5
z
w
I
~
IE
'"
~
w
~
z
w
W
0:
o
III