HomeMy WebLinkAboutMonthly Report_ ,.
~~,.
City of Winter Springs
Oak Forest Wall and Beautification District
Overview Urban Beauti acation Coordinator
Meeting Report -May 13, 2004 Steven T. Richart
Office:407-327-5976 Fax:407-327-6695
Email: srichart winters rin sfl.or
A. Budget Review
1. YTD budget report -191 Oak Forest Maintenance.
2. YTD budget report - 309 Oak Forest Capital.
B. Reuorts and Information
1. The bricks that were found to be loose at Forest Creek entrance,
planter area, have been repaired.
2. Eastwood Tuff Turf is performing to standard.
3. At last month's meeting Louise Allen requested (2) items regarding the
wall expansion. First, the question was raised as to the City
participating in the purchase of the Newby parcel for the wall
expansion. After speaking with Mr. McLemore, it was determined that
the land purchase would be the sole financial responsibility of the Oak
Forest Wall and Beautification District. Second, the question was
asked about condemning the properly as mentioned by Mr. McLemore
in the past. This could be done by way of quit claim deed or a formal
hearing process and would be costly to the District. It is my
recommendation that we continue talks with Mr. Newby and make
condemnation a last resort effort.
D. Proiects
1. Entrance sign painting quotations. Discussion.
2. Wall Expansion Project -Awaiting response from letter written to Mr.
Newby, current owner of the parcel.
3. Landscaping and Irrigation Project -Spoke with GSG about timeline
and details. They are finalizing the information for Seminole County
tax roles. FYI: As of Sept' 03, the amount outstanding on the original
principal was $495,906.00. Maturity date is 06/05.
NOTES:
05/12/2004 ***LIVE***REFRESHED 04/30/04*** PAGE 1
09:52:22 YTD BUDGET REPORT - MAY '04 glytdbud
FOR 2004 08
ACCOUNTS FOR: ORIGINAL TRANFRS/ REVISED AVAILABLE PCT
191 OAK FOREST MAINTENANCE APPROP ADJSTMTS BUDGET YTD ACTUAL ENCUMBRANCES BUDGET USED
------------------------------------------------------------------------------------------------------------------------------------
191 OAK FOREST MAINTENANCE
-----------------------------------
191-000-000-0000-315100 ASS COLL
191-000-000-0000-361100 INTEREST
191-000-000-0000-361101 CNTY INT
191-000-000-0000-389100 APP FD BAL
191-000-000-0000-53211 ADMINFEE
191-000-000-0000-53410 CONT SERV
191-000-000-0000-54210 POSTAGE
191-000-000-0000-54310 UTILITIES
191-000-000-0000-54682 RM GROUNDS
191-000-000-0000-55230 OP SUPPLY
191-000-000-0000-55251 RM SGN/WAL
191-000-000-0000-59130 TR GEN FUN
191-000-000-0000-59310 STAT RESER
TOTAL OAK FOREST MAINTENANCE
TOTAL OAK FOREST MAINTENANCE
TOTAL REVENUES
TOTAL EXPENSES
-22,700 0 -22,700 -21,677.78
-500 0 -500 -271.87
0 0 0 -3.64
-5,800 0 -5,800 .00
5,500 0 5,500 3,100.00
150 0 150 107.77
300 0 300 .00
2,000 0 2,000 915.74
9,500 0 9,500 3,599.20
50 0 50 30.00
6,000 0 6,000 1,930.49
4,600 0 4,600 3,066.64
900 0 900 .00
0 0 0 -9,203.45
0 0 0 -9,203.45
-29,000 0 -29,000 -21,953.29
29,000 0 29,000 12,749.84
.00
.00
.00
.00
.00
.00
.00
.00
4,224.95
.00
100.00
.00
.00
-1,022.22
-228.13
3.64
-5,800.00
2,400.00
42.23
300.00
1,084.26
1,675.85
20.00
3,969.51
1,533.36
900.00
95.5$
54.4$*
.0$
.0$*
56.4$
71.8$*
.0$
45.8$
82.4$*
60.0$
33.8$
66.7$
.0$
PRIOR FUND BALANCE
CHANGE IN FUND BALANCE
CURRENT FUND BALANCE
n
25,411.85
9,203.45
34,615.30
4,324.95
4,324.95
.00
4,324.95
4,878.50
4,878.50
-7,046.71
11,925.21
.0$
0$
• • •
05/12/2004 ***LIVE***REFRESHED 04/30/04*** PAGE 1
09:52:56 YTD BUDGET REPORT - MAY '04 glytdbud
FOR 2004 08 JOURNAL DETAIL 2004 1 TO 2004 7
ACCOUNTS FOR: ORIGINAL TRANFRS/ REVISED AVAILABLE PCT
191 OAK FOREST MAINTENANCE
--------------------------------------- APPROP ADJSTMTS
----------------------------- BUDGET YTD ACTUAL ENCUMBRANCES BUDGET
------------------------------------------------------- USED
---------
191 OAK FOREST MAINTENANCE
-----------------------------------
191-000-000-0000-315100 ASS LOLL
2004/01/000692 11/01/2003 BUC
2004/02/000230 11/13/2003 C/R
2004/02/000230 11/13/2003 C/R
2004/02/000368 11/20/2003 C/R
2004/03/003188 12/09/2003 C/R
2004/03/003404 12/19/2003 C/R
2004/04/004178 01/12/2004 C/R
2004/05/005300 02/12/2004 C/R
2004/06/006284 03/15/2004 C/R
2004/07/007167 04/08/2004 C/R
191-000-000-0000-361100 INTEREST
2004/01/000692 11/01/2003 BUC
.2004/01/000759 10/31/2003 GEN
2004/02/000508 11/30/2003 GEN
2004/03/003601.12/31/2003 GEN
2004/04/004663 01/31/2004 GEN
2004/05/005737 02/29/2004 GEN
2004/06/006756 03/30/2004 GEN
2004/07/007583 04/30/2004 GEN
2004/07/007586 04/30/2004 GRV
191-000-000-0000-361101 CNTY INT
2004/01/000322 10/15/2003 C/R
2004/01/000322 10/15/2003 C/R
2004/01/000322 10/15/2003 C/R
2004/01/000709 10/01/2003 GRV
2004/05/005120 02/06/2004 C/R
191-000-000-0000-389100 APP FD BAL
2004/01/000692 11/01/2003 BUC
191-000-000-0000-53211 ADMINFEE
2004/01/000692 11/01/2003 BUC
2004/03/003155 12/08/2003 API
2004/06/006198 03/10/2004 API
•
-22,700
-22,700.00 REF
-21.87 REF 529325
-270.73 REF 529324
-10,108.50 REF 533695
-8,356.36 REF 544880
-1,048.05 REF 550625
-618.09 REF 563129
-270.72 REF 580300
-220.02 REF 598978
-640.56 REF 614530
-500
-500.00 REF
-26.04 REF 401043
-50.04 REF 402030
-68.53 REF 403046
-58.29 REF 404039
-34.02 REF 405033
-34.95 REF 406038
-34.95 REF 40717
34.95 REF 40717
0 -22,700
RAY VALDES
RAY VALDES
RAY VALDES
RAY VALDES
RAY VALDES
.RAY VALDES
RAY VALDES
RAY VALDES
RAY VALDES
0 -500
-21,677.78
ORIGINAL B1
OAK FOREST
OAK FOREST
OAK FOREST
OAK FOREST
OAK FOREST
OAK FOREST
OAK FOREST
OAK FOREST
OAK FOREST
-271.87
.00 -1,022.22 95.5$
JDGET 2004
- MAINTENANCE ASSES
- MAINTENANCE ASSES
- MAINTENANCE ASSES
- MAINTENANCE ASSES
- MAINTENANCE ASSES
- MAINTENANCE ASSES
- MAINTENANCE ASSES
- MAINTENANCE ASSES
- MAINTENANCE ASSES
.00 -228.13 54.4$*
ORIGINAL BUDGET 2004
TNTEREST ALLOCATION -OCT 03
INTEREST ALLOCATION-NOV 03
INTEREST ALLOCATION - DEC 03
INTEREST ALLOCATION - JAN 04
ALLOCATE FEB INTEREST
INT ALLOCATION - MARCH
INTEREST ALLOCATTON-MARCH 04
INTEREST ALLOCATTON-MARCH 04
0 0
-.36 REF 514267
-.36 REF 514236
.36 REF 514250
.36 REF 312072
-1.43 REF 576672
-5,800
-5,800.00 REF
5,500
5,500.00 REF
1,550.00 VND 001061 PO
1,550.00 VND 001061 PO
0 -3.64 .00 3.64 .0$
RAY VALDES LINE CODE REIMBURSEMENT
RAY VALDES LINE CODE REIMBURSEMENT
Reversal / 514236 LINE CODE REIMBURSEMENT
ACCRUE OAK FOREST CNTY INT
RAY VALDES LINE CODE REIMBURSEMENT
0 -5,800 .00 .00 -5,800.00 .0$*
ORIGINAL BUDGET 2004
0 5,500 3,100.00 .00 2,400.00 56.4$
ORIGINAL BUDGET 2004
GSG/GOVERNMENT SER ID# 206 OAK FOREST PYMT 1 13286
GSG/GOVERNMENT SER OAK FOREST PYMT 2 OF 4 15195
• •
05/12/2004 ***LIVE***REFRESHED 04/30/04*** PAGE 2
09:52:56 YTD BUDGET REPORT - MAY '04 glytdbud
FOR 2004 08
JOURNAL DETAIL 2004 1 TO 2004 7
ACCOUNTS FOR: ORIGINAL TRANFRS/ REVISED AVAILABLE PCT
191 OAK FOREST MAINTENANCE
------------------------------------ APPROP ADJSTMTS
--------------------------------- BUDGET YTD ACTUAL ENCUMBRANCES
---------------------------------------
---- BUDGET
------------ USED
--------
191-000-000-0000-53410 CONT SERV 150 0 150 107. 77 .00 42.23 71.8~*
2004/01/000692 11/01/2003 BUC 150.00 REF ORIGINAL BUDGET 2004
2004/03/003299 12/15/2003 API 93.79 VND 000302 PO RAY VALDES, SEM CO T COMM ON COLLECTIONS 13540
2004/05/005523 02/23/2004 API 9.68 VND 000302 PO RAY VALDES, SEM CO T OAK FOREST-12/03 -1/04 14899
2004/07/007464 04/26/2004 API 4.30 VND 000302 PO RAY VALDES, SEM CO T WINTER SPRINGS OAK FOREST 16354
191-000-000-0000-54210 POSTAGE 300 0 300 . 00 .00 300.00 .0~
2004/01/000692 11/01/2003 BUC 300.00 REF ORIGINAL BUDGET 2004
191-000-000-0000-54310 UTILITIES 2,000 0 2,000 915. 74 .00 1,084.26 45.8
2004/01/000301 TO/15/2003 API 129.11 VND 000716 PO PROGRESS ENERGY FLOR ACCT 98765 22190 12255
2004/01/000692 11/01/2003 BUC 2,000.00 REF ORIGINAL BUDGET 2004
2004/02/000195 11/12/2003 API 131.73 VND 000716 PO PROGRESS ENERGY FLOR ACCT 98765 22190 12771
2004/03/003302 12/15/2003 API 145.27 VND 000716 PO PROGRESS ENERGY FLOR ACCT 98765 22190 13536
2004/04/004336 01/22/2004 API 194.96 VND 000716 PO PROGRESS ENERGY FLOR ACCT 98765 22190 14153
2004/05/005348 02/16/2004 API 131.41 VND 000716 PO PROGRESS ENERGY FLOR ACCT 98765 22190 14703
2004/06/006350 03/17/2004 API 82.72 VND 000716 PO PROGRESS ENERGY FLOR ACCT 98765 22190 15397
2004/07/007234 04/14/2004 API 100.54 VND 000716 PO PROGRESS ENERGY FLOR ACCT 98765 22190 16004
191-000-000-0000-54682 RM GROUNDS 9,500 0 9,500 3,599.20 4,224.95 1,675.85 82.4~*
2004/01/000153 10/08/2003 POE 7,935.00 VND 003421 PO 40217 EASTWOOD TUFF TURF LANDSCAPE MAINT. OAK FOREST
2004/01/000692 11/01/2003 BUC 9,500.00 REF ORIGINAL BUDGET 2004
2004/02/000175 11/11/2003 API 575.00 VND 003421 PO 40217 EASTWOOD TUFF TURF LANDSCAPE MAINT. OAK FOREST 12716
2004/02/000175 11/11/2003 POL -575.00 VND 003421 PO 40217 EASTWOOD TUFF TURF LANDSCAPE MAINT. OAK FORES2004
2004/03/003091 12/03/2003 API 9.02 VND 003421 PO 40217 EASTWOOD TUFF TURF LANDSCAPE MAINT. OAK FOREST 13262
2004/03/003091 12/03/2003 API 575.00 VND 003421 PO 40217 EASTWOOD TUFF TURF LANDSCAPE MAINT. OAK FOREST 13262
2004/03/003091 12/03/2003 POL -9.02 VND 003421 PO 40217 EASTWOOD TUFF TURF LANDSCAPE MAINT. OAK FORES2004
2004/03/003091 12/03/2003 POL -575.00 VND 003421 PO 40217 EASTWOOD TUFF TURF LANDSCAPE MAINT. OAK FORES2004
2004/03/003332 12/16/2003 API 30.15 VND 003421 PO 40217 EASTWOOD TUFF TURF LANDSCAPE MAINT. OAK FOREST 13469
2004/03/003332 12/16/2003 POL -30.15 VND 003421 PO 40217 EASTWOOD TUFF TURF LANDSCAPE MAINT. OAK FORES2004
2004/04/004214 01/14/2004 API 575.00 VND 003421 PO 40217 EASTWOOD TUFF TURF LANDSCAPE MAINT. OAK FOREST 13986
2004/04/004214 01/14/2004 POL -575.00 VND 003421 PO 40217 EASTWOOD TUFF TURF LANDSCAPE MAINT. OAK FORES2004
2004/05/005155 02/09/2004 API 113.75 VND 003421 PO 40217 EASTWOOD TUFF TURF LANDSCAPE MAINT. OAK FOREST 14517
2004/05/005155 02/09/2004 API 575.00 VND 003421 PO 40217 EASTWOOD TUFF TURF LANDSCAPE MAINT. OAK FOREST 14517
2004/05/005155 02/09/2004 POL -95.28 VND 003421 PO 40217 EASTWOOD TUFF TURF LANDSCAPE MAINT. OAK FORES2004
2004/05/005155 02/09/2004 POL -18.47 VND 003421 PO 40217 EASTWOOD TUFF TURF LANDSCAPE MAINT. OAK FORES2004
2004/05/005155 02/09/2004 POL -575.00 VND 003421 PO 40217 EASTWOOD TUFF TURF LANDSCAPE MAINT. OAK FORES2004
2004/06/006242 03/11/2004 API 575.00 VND 003421 PO 40217 EASTWOOD TUFF TURF LANDSCAPE MAINT. OAK FOREST 15335
2004/06/006242 03/11/2004 API 50.00 VND 003421 PO 40217 EASTWOOD TUFF TURF LANDSCAPE MAINT. OAK FOREST 15335
2004/06/006242 03/11/2004 POL -50.00 VND 003421 PO 40217 EASTWOOD TUFF TURF LANDSCAPE MAINT. OAK FORES2004
2004/06/006242 03/11/2004 POL -575.00 VND 003421 PO 40217 EASTWOOD TUFF TURF LANDSCAPE MAINT. OAK FORES2004
2004/06/006371 03/17/2004 API -110.85 VND 003421 PO 40217 EASTWOOD TUFF TURF LANDSCAPE MAINT. OAK FOREST 15631
2004/07/007265 04/15/2004 API 575.00 VND 003421 PO 40217 EASTWOOD TUFF TURF LANDSCAPE MAINT. OAK FOREST 16117
2004/07/007265 04/15/2004 API 50.00 VND 003421 PO 40217 EASTWOOD TUFF TURF LANDSCAPE MAINT. OAK FOREST 16117
`2004/07/007265 04/15/2004 POL -575.00 VND 003421 PO 40217 EASTWOOD TUFF TURF LANDSCAPE MAINT. OAK FORES2004
2004/07/007265 04/15/2004 POL -50.00 VND 003421 PO 40217 EASTWOOD TUFF TURF LANDSCAPE MAINT. OAK FORES2004
•
05/12/2004 ***LIVE***REFRESHED 04/30/04*** PAGE 3
09:52:57 YTD BUDGET REPORT - MAY '04 glytdbud
FOR 2004 08 JOURNAL DETAIL 2004 1 TO 2004 7
ACCOUNTS FOR: ORIGINAL TRANFRS/ REVISED AVAILABLE PCT
191 OAK FOREST MAINTENANCE
--------------------------------- APPROP
------------------------- ADJSTMTS
----------- BUDGET YTD ACTUAL ENCUMBRANCES BUDGET
------------------------------------------------------- USED
--------
191-000-000-0000-55230 OP SUPPLY 50 0 50 30.00 .00 20.00 60.0
2004/01/000692 11/01/2003 BUC 50.00 REF ORIGINAL BUDGET 2004
2004/06/006223 03/11/2004 POE 30.00 VND 000981 PO 42934 SIGN MAN, THE BOARD MEMBER NAME PLATES
2004/06/006370 03/17/2004 API 30.00 VND 000981 PO 42934 SIGN MAN, THE BOARD MEMBER NAME PLATES 15409
2004/06/006370 03/17/2004 POL -30.00 VND 000981 PO 42934 SIGN MAN, THE BOARD MEMBER NAME PLATES 2004
191-000-000-0000-55251 RM SGN/WAL 6,000 0 6,000 1,930.49 100.00 3,969.51 33.8
2004/01/000440 10/22/2003 POE 321.29 VND 003555 PO 40544 LIGHTS UNLIMITED,INC REPAIRS TO LIGHTS AT OAK FORES
2004/01/000526 10/27/2003 API 321.29 VND 003555 PO 40544 LIGHTS UNLIMITED,INC REPAIRS TO LIGHTS AT OAK FORES 12587
2004/01/000526 10/27/2003 POL -321.29 VND 003555 PO 40544 LIGHTS UNLIMITED,INC REPAIRS TO LIGHTS AT OAK F2004
2004/01/000692 11/01/2003 BUC 6,000.00 REF ORIGINAL BUDGET 2004
2004/02/000191 11/12/2003 POE 53.79 VND 004834 PO 40981 HICKS ELECTRIC, INC. REPAIR SIGN LIGHTING
2004/02/000243 11/14/2003 API 53.79 VND 004834 PO 40981 HICKS ELECTRIC, INC. REPAIR SIGN LIGHTING 12900
2004/02/000243 11/14/2003 POL -53.79 VND 004834 PO 40981 HICKS ELECTRIC, INC. REPAIR SIGN LIGHTING 2004
2004/03/003347 12/17/2003 POE 300.00 VND 004834 PO 41584 HICKS ELECTRIC, INC. LIGHT REPAIRS AT OAK FOREST
2004/04/004333 01/22/2004 POM 122.75 VND 004834 PO 41584 HICKS ELECTRIC, INC. ADDITIONAL COST 41584 2004
2004/04/004510 01/28/2004 API 422.75 VND 004834 PO 41584 HICKS ELECTRIC, INC. LIGHT REPAIRS AT OAK FOREST 14544
2004/04/004510 01/28/2004 POL -122.75 VND 004834 PO 41584 HICKS ELECTRIC, INC. LIGHT REPAIRS AT OAK FORES2004
2004/04/004510 01/28/2004 POL -300.00 VND 004834 PO 41584 HICKS ELECTRIC, INC. LIGHT REPAIRS AT OAK FORES2004
2004/05/005611 02/26/2004 POE 1,132.66 VND 003421 PO 42726 EASTWOOD TUFF TURF PLANT INSTALLATION AT ENTRANCE
2004/06/006598 03/25/2004 API 1,132.66 VND 003421 PO 42726 EASTWOOD TUFF TURF PLANT INSTALLATION AT ENTRANCE 15631
2004/06/006598 03/25/2004 POL -1,132.66 VND 003421 PO 42726 EASTWOOD TUFF TURF PLANT INSTALLATION AT ENTR2004
191-000-000-0000-59130 TR GEN FUN 4,600 0 4,600 3,066.64 .00 1,533.36 66.7
2004/01/000692 11/01/2003 BUC 4,600.00 REF ORIGINAL BUDGET 2004
2004/04/004423 01/27/2004 GEN 383.33 REF 113 OF MNT REIMB GF FOR CLERKS
2004/04/004433 01/27/2004 GEN 383.33 REF 113 OF MNT REIMB GF FOR CLERKS
2004/04/004449 01/27/2004 GEN 383.33 REF 113 OF MNT REIMB GF FOR CLERKS
2004/04/004465 01/27/2004 GEN 383.33 REF 113 OF MNT REIMB GF FOR CLERKS
2004/05/005249 02/11/2004 GEN 383.33 REF 113 OF MNT REIMB GF FOR CLERKS
2004/06/006019 03/01/2004 GEN 383.33 REF 113 OF MNT REIMB GF FOR CLERKS
2004/07/007033 04/01/2004 GEN 383.33 REF 113 OF MNT REIMB GF FOR CLERKS
191-000-000-0000-59310 STAT RESER 900 0 900 .00 .00 900.00 .0~
2004/01/000692 11/01/2003 BUC 900.00 REF ORIGINAL BUDGET 2004
TOTAL OAK FOREST MAINTENANCE 0 0 0 -9,203.45 4,324.95 4,878.50 .0~
TOTAL OAK FOREST MAINT ENANCE 0 0 0 -9,203.45 4,324.95 4,878.50 .0~
TOTAL REVENUES -29,000 0 -29,000 -21,953.29 .00 -7,046.71
TOTAL EXPENSES 29,000 0 29,000 12,749.84 4,324.95 11,925.21
05/12/2004 ***LIVE***REFRESHED 04/30/04*** PAGE 4
09:52:57 YTD BUDGET REPORT - MAY '04 glytdbud
FOR 2004 08
JOURNAL DETAIL 2004 1 TO 2004 7
ACCOUNTS FOR: ORIGINAL TRANFRS/ REVISED AVAILABLE PCT
191 OAK FOREST MAINTENANCE APPROP ADJSTMTS BUDGET YTD ACTUAL ENCUMBRANCES BUDGET USED
------------------------------------------------------------------------------------------------------------------------------------
PRIOR FUND BALANCE 25,411.85
CHANGE IN FUND BALANCE 9,203.45
CURRENT FUND BALANCE 34,615.30
• • •
05/12/2004 ***LIVE***REFRESHED 04/30/04*** PAGE 1
09:53:52 YTD BUDGET REPORT - MAY '04 glytdbud
FOR 2004 08
ACCOUNTS FOR: ORIGINAL TRANFRS/ REVISED AVAILABLE PCT
309 OAK FOREST CAPITAL FUND
------------------------------------------- APPROP
------------- ADJSTMTS
------------- BUDGET
------------ YTD ACTUAL
-------------- ENCUMBRANCES
--------------- BUDGET
-------------- USED
--------
309 OAK FOREST CAPITAL FUND
-----------------------------------
309-000-000-0000-361100 INTEREST -500 0 -500 -231.17 .00 -268.83 46.2$*
309-000-000-0000-389100 APP FD BAL -26,587 0 -26,587 .00 .00 -26,587.00 .0$*
309-000-000-0000-65000 CAP-CIP 27,087 0 27,087 4,225.00 950.00 21,912.00 19.1$
TOTAL OAK FOREST CAPITAL FUND 0 0 0 3,993.83 950.00 -4,943.83 .0$
TOTAL OAK FOREST CAPITAL FUND 0 0 0 3,993.83 950.00 -4,943.83 .0$
TOTAL REVENUES -27,087 0 -27,087 -231.17 .00 -26,855.83
TOTAL EXPENSES 27,087 0 27,087 4,225.00 950.00 21,912.00
PRIOR FUND BALANCE
CHANGE IN FUND BALANCE
CURRENT FUND BALANCE
30,140.32
-3,993.83
26,146.49
• • •
•
May 10 04 10:29a
Carmen M. Tenon
40?-523-4776
(~ 1~ ~-o+~S~J
•
World Painting
Exterior Painting Proposal
Prepared For: Steven T. Richert
Urban Beautification Coordinator
For The City of Winter Springs
p.l
•
May 10 04 10:29a
w
Carmen M. Tanon
World Paintin
407-523-4776
p.2
St. Andrews Circle • Orlando, FL 32835 ~ Tel: (4Q7) 948-8122
•
•
May 10, 2004
Dear Mr. Richart
Thank you for the opportunity to provide you with a proposal for your Exterior Painting
Project. Along with the attached proposal you will fnd a list of services we can provide to
you and a partial list of our previous customers. We are proud of our fine reputation that
was established in 1990.
Our office is located in Central Florida and as you can see by our fist of references, we can
travel anywhere in Central Florida to service your painting needs. Our company specializes
in large projects, interior, exterior, minor repairs, difFcult to reach areas, etc. However, no
project is too small.
We take a lot of pride in our work and strive to give each customer a quality paint job at an
affordable price. We stand behind a!I of our work and offer a 5-year warranty agains# all
defects caused by.material failure or workmanship. Please Note: Same natural fading may
occur depending on color selected. We are available to answer any questions you may have
about your painting project. Thank you for your time and consideration we look forward to
hearing from you soon.
Sincerely,
Jose Espinosa
Owner
May 10 04 10:29a Carmen M. Tanon 407-523-4776 p.3
World Paintin
7925 St. Andrews Circle • Oflando, FL 32835 • Tel: (40'7)
May, 10 2004
Mr. Steven T. Richart (C.W.S.) Customer#2783
1126 East S.R. 434 Proposal # 3275
Winter Springs, F132708
(407) 327-1800 East. 315
RE: Exterior
SCOPE OF WORK
A. SURFACE PREPARATIOIV.•
1. GENERAL: All surfaces shall be cleaned, scraped, sanded, sealed, primed or otherwise properly
prepared as needed prior to paint application.
2. CLEANT~VG: All surfaces shall be pressure cleaned and chemically treated to remove aU dirt;
mold, mildew, chalk, oxidation, peeling paint or any other foreign matter which may affect the
adhesion or performance of the finish products.
3. PRIMER: All new wood and bare wood shall be properly primed with the appropriate primer as
neec ec~. "-
4. SEALER: App1 one.coat of masonnrryy surface conditioner to all surfaces as needed to insure
proper esion of the finish coat. PLEASE NOTE even after pressure cleaning there still maybe
some evidence of oxidation. The application of the surface conditioner will bond the remaining
oxidation to the substrate and provide an acceptable surface for the new paitrt to adhere to.
5. CRACgREFAIR 3./16" OR LESS: Cracks and voids in masonry 1/16" or less shall
be: filled or patched with a 100% acrylic brush grade elastomeric patching material to match existing
texture as close as possible.
6. CRACg REPAIR GREATER 7~91V U16": Cracks and voids in masonry greater
than 1/16" shall be cut out to forma "V", install backing rod if necessary and tool in a bead of a one
part urethane tube type sealant, tooled to manufacturer's specificatioas. Then bridge the crack with a
100% acrylic brush grade elastomeric patching material to match existing texture as close as possible.
7. CAULKING: Caulk all windows, doors, and Haters, etc. as needed with a 40-year
acry c s'"T'" eafanl""-
8.PROTECTION: All windows shall be masked and bagged and all other surfaces not scheduled
to receive paint shall be fully protected at all times.
~~
•
May 10 04 10:30a Carmen M. Tanon
407-523-4776 p.4
B. FINISHFAINTS & COATINGS: Mr. Steve Ricttart (407) 327-1800 Ext. 315
I. Exterior Painting/ Pressure Cleaning
a. Pressure wash 8 Subdivision signs
b. Caulk any crack on concrete
c. Paint concrete wall around letters
COSTS BREAKDOWN
DESCRIPTION COST
Labor and Materials INITIALS
Exterior Painting /Pressure Cleaning
Sherwin Williams paint will be used for this project $ 1950.00
To paint letters it will be: $ 200.00
25% Required prior to beginning project; Balance due
upon completion.
Total $ 2150.00
•
PROPOSAL
VVe hereby Propose to accomplish the above project in accordance with the above
specification for the sum as determined by the options chosen. Payment shall be due upon
completion. All material in this proposal is guaranteed to be as specified, the entire job is to be done
in a neat and substantial manner. Any alteration or deviation from these specifications here in agreed
upon involving extra cost and labor will be executed only upon written change order for the same, and
will become an extra charge over the sum mentioned in 's proposal. This proposal is void 94 days
from date unless signed and returned to bidder. f
DATE: S ~ 4 ~ SIGNED:
~_
Owner
ACCEPTANCE OF PROPOSAL
The foregoing terms, specifications and conditions are satisfactory, and the same are hereby
accepted and agreed upon, and you are hereby authorized to execute the same.
PROPOSAL ACCEPTED BY:
Officer, Owner, /Tine /Date
•
•
May 10 04 10:30a
Carmen M. Tanon
407-523-4776 p.5
CONTRACTOR'S AND OWNER'S RESPONSIBILITIES
A. GENERAL
The Contractor shall supply all labor and materials and equipmem necessary for the total completion of the work
as peT the specifications.
The Contractor shall be responsible for and use due care to protect Owner's property such as screens, windows,
shrubbery, walkways and other areas from paint or damage.
The Contractor shall be solely responsible for rectifying a~ damage caused by his employees including
paint drips and over spray.
All work is to be performed in a workman like manner by skilled mechanics and carved out in such a way
as to minimize arty inconvenience to Owner tenants and occitpauts. The contractor shall mairttairt a full work farce
and a qualified foreman on the job at all times from start to completion.
B. SAFETY
Contractor shall rope offand erect signs, where necessary, in areas where over spray or dripping may occur.
No damages will be paid for items located or vehicles parked within the zoned areas.
Contractor shall be responsible fior safety administration on the job (including tools, equipment and work methods)
and shall be in compliance with all OSHA safety regulation.
•
C. SCHEDULE OF WORK CONTRACT
Contractor shall state the approxi~rnate time required to complete the work (bad weather days to be added).
The starting date shall be determined by mutual agreement at the signing of the Contract.
D. OWNER RESPONSIBILITIES
Owner will provide water and electricity for equipment as necessary to facilitate Corrtractors work. Use of
sanitary facilities and telephone will be by mutual agreement.
Owner shall be responsible for removing or protecting miscellaneous loose objects in the work area, i.e.,
Potted plants, patio furniture, removable door and window screens, etc. If items are not removed,
Contractor shall take due care to protect them but shall not be responsible for any damage that may occur.
Owner shall be responsible for cleaning miscellaneous dirt, chalk and water spots from window frames and
glass after the work is completed. Contractor shall be responsible only to remove any of his coating materials,
which may adhere to the door and window frames and glass.
Owner shall be responsible for notifying all concerned of the work being performed in order to avoid
any damage to personal belongings. Areas of possible over spray or dripping of material shall be marked
off and Contractor shall erect signs, if necessary. No damages will be paid for items located or vehicles
parked within the zoned areas.
Owner shall be responsible for any trimming or pruning of foliage, which may itrterfere with the contracted work.
•
May 10 04 10:30a
•
Carmen M. Tenon
407-523-4776 p•6
COLOR SELECT'IONS'
I URFACE /TYPE i NOLOR 1 COLOR ~ ISH MANUFAC't'U,RER INITIALS I
AME + CODE
INTERIOR
ROOM /SURFACE COLOR
NAME COLOR
CODE
FINISH
MANUFACTURER
~ INITIALS
•
•
May 10 04 10:31a Carmen M. Tanon 407-523-4776
REFERENCES
1. Mr. Dusty Rhodes 8. Mr. Matthews Dorsey
7917 St. Andrews Cir. 7903 St. Andrews Cir.
Orlando, FL 32835 Orlando, FL 32835
Tel: (407) 521-8610 Tel: (407) 445-5905
2. Mr. Ron Silvers 9. Mr. Andy Schulman
556 Saddle Bay Lp. 1219 Royal Oaks
Ocoee, FL 32 Winter Springs, FL 32708
Tel: (407) 758-7876 Tel: (407) 366-6885
3. Ms. Lisa Bowers 10. Mrs. Irma Moreno
7941 St. Andrews Cir. 8118 Lake Serene Dr.
Orlando, FL 32835 Orlando, FL 32819
Tel: (407) 298-2310 Tel: (407) 345-5199
•
4. Mr. Mike Calvo 11. Mr. Mike Feorene
1319 Country Ridge 8713 South Bay Dr.
Orlando, FL 32835 Orlando, FL 32819
Tel: (407) 532-3351 Tel: {407) 497-8260
5. Shirley Sheer 12. Pam Budhu
7205 Black Bull Ln 1983 Westpointe Dr.
Orlando, FL 32805 Orlando, FL 32835
Tel: (407) 295-1693 Tel: (407) 294-6481
6. Mrs. Lillian Aviles 13. Mr. & Mrs. Oscar Pietri
140 Coral Woods 9119 Balmoral Mears
Kissimmee, FL Orlando, FL 32835
Tel: (407} 344-9840 Tel: (407) 296-5531
7. Mr. David Contaxis 14. Mrs. Elsie Gray
1175 Palm Cove Dr. 3807 Sea Island Ct.
Orlando, FL 32835 Orlando, FL
Tel: (407) 296-3244 Tel: (407) 423-5434
p.7
•
•
~,q y
;~
~~
~ ~~~~
Urban Beautifica'~Fe~
Grounds
-~ f3~b-~~~/
nspection Report
ance
Vendor: ~i ~-~~'~ ~ I ~r T~~ Date: 13 0
Project: w5~~~. l 1 ~ ~~ ~ ~~~~s1~
Safety and Eauiament: `~fr~
1
Service Requests: (To be handled within 7 working days unless otherwise noted.)
~ ~.r~i1,`fs ~~ w~h ~ d~ 1~ n~oc~ oa ~ _~ee~~, ~~s;s v~ ~, ~~,n., 0913,
P ~f'1$~ ~/~ ILA 5 ire T-y ~: s /7h~i~S • ~'~' C % ~ A~'~' '~-G~L,M 7"o E~ ~LDe-~ '~'~IS (r~2i'~,
Mc~C~~h`ipr ( ~ e~ b~ cam/\~.c,~- S Z,~{1-c.~~e~ ~ p i1~ c~-o r~~ 2 el` eS~/L , ~GC.A S-~.
. ~,VL 7~r.. k~Y"lxN `.~-hl S 1 / ~ ~Cr~~I`t~ f
Monthly Maintenance Reports
Yes No Date:
•
1. Mowing, mechanical trimming, and cleanup of turf areas.
?
2
3
4-
5
2. Weeding of planters; curbs, walks, and hardscape areas. 1 2 3 4 5
3. Trash and debris removal.. 1 2 3 4 5
Edging of planters and hardscape areas. 1 2 3 4 5
5. Irrigation system coverage. 1 2 3 4 5
6. Fertilization and chemical program. 1 2 3 4 5
7. Trimming of shrubs and hedges. 1 2 3 4 5
8. Overall appearance and curb appeal. 1 2 3 4 5
9. Vendor communication. 1 2 3 4 5
~ ~~y
•
Urban Beautification Quality inspection Report
Grounds Maintenance
Vendor: ~ ~'-~~'~°~-° ~ "~ ~ I `~ Date: ~ ~`~
Project: C~~~ ~'z'``effi`
II Safety and Eauipment: ~~ ~
1
Monthly Maintenance Resorts
Yes No Date:
1. Mowing, mechanical trimmfng, and cleanup of turf areas. 1 2 3 4 5
2. Weeding of planters, curbs, walks, and hardscape areas. 1 Z 3 4 5
3. Trash and debris removal. 1 2 3 4 5
Edging of planters and hardscape areas. 1 2 3 4 5
5. Irrigation system coverage. ~'~` ~~-0.
A I ( (~r~-S 1 2 3 4 5
6. Fertilization and chemical program. ~~ iN .~r~ 1 2 3~ 4 5
7. Trimming of shrubs and hedges. 1 2 3 4 5
8. Overall appearance and curb appeal. 1 2 3 4 5
9. Vendor communication. 1 2 3 4 5
Service Requests: (To be handled wJit_h-in 7 wor~k~i~n(g d~ay-s^• unless ot4herwi(se noted.) t /~ t'
~O~~f1-Cn JiA-~1~ ~~/~nh~-- /Y1~,~7 7`~ Try..! ~GS v~,~-°C- ~~ /~"'`°/~
'~ W~e.9..~5 ,~ A n)~Jk. S - vu S.2.e (~ ~- -#-~:-c. f~.a ~
11 ~
Oak Forest Wail and Beautification DlstMct
CITY OF WINTER SPRINGS
MbNTHLY LIGHTING INSPECTION
Date: Sr 14 I ~ ~.` Ins tor: Steven Richart
E~rances:
1. Tuskawilla Road and Winter Springs Blvd.
2. Tuskawilla Road and Trotwood. UI'~
3. Tuskawilla Road and Oak Forest Drive.
4. Tuskawilla Road and Forest Creek Drive.
Notes:
•
Utility / Pubiic Works
Department
•
May 7, 2004
Mr. Todd Newby
3801 Bee Ridge Road
Suite 12
Sarasota, FL 34233
1128 EAST STATE ROAD 434
WINTER SPRINGS, FLORIDA 32708-2799
Telephone (407) 327-1800
Fax (407) 327-8695
RE: Parcel 26-20-30-SAR-OD00-0730 Tax Dist: Wl -Winter Springs
Dear Mr. Newby,
I am writing this letter in reference to the small parcel of land that you currently own on
Tuskawilla Road, adjacent to Oak Forest. As I expressed when we spoke recently, The
Oak Forest Wall and Beautification District would like to acquire this property for the
purpose of continuing the wall that currently ends at your property.
A fax describing the property was sent to your office detailing the parcel, which is
currently `Just Market' valued at $ 1,320.00. I can see no reasonable future use for this
parcel other than installation of the wall.
Please contact me at your earliest convenience so we discuss this issue further.
Best regards,
Steven T. Richart
City of Winter Springs
Urban Beautification Coordinator
407-327-5976 Office
321-377-4059 Cell
407-327-6695 Fax
email: srichart(a~winterspringsfl.org
CITY OF WINTER SPRINGS, FLORIDA
•
Terry,
Please make sure communication between board members, related to Oak Forest
Wall and Beautification District business, happen only during the monthly meetings
unless directly through my office. I would be happy to distribute any
communications to other board members. --Being cautious of the Sunshine Law
Thank you for taking time to look at the lighting and offer suggestions. Let me
make the following comments to your email.
Lightscapes did recommend lighting based upon their expertise and experience as
well as offer the opportunity for this board to review the results once installed. I
brought this back to the board and asked for opinions. At the time, I received no
direction that the lighting was unacceptable or it should be changed. I
communicated that Lightscapes would work with us if the lighting was not
acceptable. They have done this. I do not feel holding payment to the vendor is a
variable in achieving the results we desire on this project.
I still believe one of the major problems is the background color, it simply washes
out the light. Additionally, the reflective tone of the lettering still seems to be an
issue.
Thank you very much,
Steven T. Richart
City Of Winter Springs
Urban Beautification Coordinator
(407) 327-5976 Office
(321) 377-4059 Celi
162*19978*164 Nextel
(407) 327-6695 Fax
srichart@winterspringsfl.org
-----Original Message-----
From: Terry Lynn [mailto:TP@cfl.rr.com]
Sent: Sunday, May 02, 2004 1:33 PM
To: Steven Richart; smokeyandlouise@cfl.rr.com; boliverl@cfl.rr.com
Cc: Andrea Lorenzo-luaces
Subject: RE: Oak Forest Lighting Report
Mr. Ted J Zeiher,
Thank you for accepting this undertaking and giving of your time to further
investigate the options available to us, the Wall Committee and Oak Forest
Community.
Since receiving your correspondence, Ihave gone to the Trotwood entrance
where the test was made to observe for myself the differences, if any, the
lighting change would or could make.
It does appear that the change of lighting has some benefits and some
disadvantages. For example, with the test lighting, the Oak Tree logo does
seem to stand out more. However, the lighting on the lettering has uneven
lighted areas. The overall effect on the lettering seems to be no
discernable improvement.
At this time, my recommendation is that each committee member observe the
test entrance (the left side of the Trotwood entrance as one is entering the
subdivision) after dark in order to be able to discuss the matter further at
our next (May) meeting.
Whatever our decision may be at this time, I suggest in the future whenever
we contract with a lighting expert we put into the contract/agreement that
the expert make recommendations based upon their expertise and, guarantee,
in writing, the results his or her firm expects to get from their proposed
changes and that until such time as the Committee is fully and completely
satisfied the results are exactly (or a reasonable facsimile thereof) what
was proposed and recommended by the experts to the Committee, that no funds
change hands. If need be and permissible under Statute, to show good faith
on the part of the Committee, the funds for such changes be placed into an
escrow account.
I welcome comments, suggestions and feedback from all.
Respectfully,
Terry Patten, Chairman
-----Original Message-----
From: Steven Richart [mailto:srichart@winterspringsfl.org]
Sent: Wednesday, April 21, 2004 7:28 AM
To: smokeyandlouise@cfl.rr.com; tp@cfl.rr.com; boliverl@cfl.rr.com
Cc: Andrea Lorenzo-luaces
Subject: FW: Oak Forest Lighting Report
-----Original Message-----
From: tedjayz@cfl.rr.com [mailto:tedjayz@cfl.rr.com]
Sent: Monday, April 19, 2004 8:58 AM
To: Steven Richart
Subject: Oak Forest Lighting Report
Steven,
Attached is the report from my meeting with Steve Piermont last week.
I'll let you send copies to the other committee members, especially
since I don't have all their email adresses with me.
Let me know if you have any questions.
Ted ] Zeiher
Oak Forest
•
Urban Beautification Quality Inspection Report
Grounds Maintenance
Vendor: ~~~~ ~~ ~~~ Date: ~ ~ ~
Project:~l~-~re~rl-~"
Safety and Eauipment:
Monthiv Maintenance Reports
Yes No Date:
1. Mowing, mechanical trimming, and cleanup of turf areas. 1 2 3 4- 5
2. Weeding of planters, curbs, walks, and hard r~s.~ ~ 2 3 4 5
3. Trash and debris removal. 2 3 4 5
Edging of planters and hardscape areas. 2 3 4 5
5. Irrigation system coverage. ~~ ~-~~ , •' 2 3 4 5
6. Fertilization and chemical program. IvC~~ ;w~~2..!'~- 1 2 3 4 5
7. Trimming of shrubs and hedges. 1 2 ~ 4 5
8. Overall appearance and curb appeal. 1 2 3 4 5
9. Vendor communication. 1 2 4 5
_,,,~Se ice Requests: (To be handled within 7 working days unless otherwise noted.)
--® r. ~P n Try ~ rUnlt~.~ 6'~ » A i'
•
Eastwood Tuff Turf of Central Florida, Inc.
161,E Oklahoma Street
Oviedo, FL 32765
•
M T W T F S S
M T W T F S S
CURRENT
`A' Run Days
`B' Run Days
CLOCK#
M T W T F S S
M T W T F S S
ADJUSTED
`A' Run Days
`B' Run Days
`A' StartTime
`B' Start Time
ZONE NUMBER 1 2 3 4 5 6
SPRAY OR ROTOR (S or R) S S S S S S
CURRENT RUN TIME 1:15 1:20 1:20 1:15 1:15 1:15
FIXED NOZZLES
NO FAULTS FOUND
4" POP UP
6" POP UP
12" POP UP
ROTOR
CHANGE 4" TO 6" POP UP
CHANGE 6" TO 12" POP UP
AD RAISED SHRUB
ERE CLOG
INCORRECT NOZZLE
RELOCATION
LEAK IN HEAD
LEAK IN PIPE
BROKEN RISER
VALVE NOT OPERATING
OTHER -SEE COMMENTS
COMMENTS: (Attach extra sheet if necessary): Found flow control turned off in Oak Forest end of median valve #5. Turned it back
Rob Schroeder & David Ruiz
INSPECTED BY
Job Name: C.O.W.S Oak Forest
Date: 4/23/04
Page 1 of 1
•
Oak Forest Wall and Beauttflcation District
CITY OF WINTER SPRINGS
~7 MbNTHLY LIGHTING INSPECTION
D e: t Inspector: Steven Richart
Entrances:
1. Tuskawilla Road and Winter Springs Blvd. ~~
2. Tuskawilla Road and Trotwood.
3. Tuskawilla Road and Oak Forest Drive. ~
4. Tuskawilla Road and Forest Creek Drive. (fib
Notes:
•
•
~p4N~
u
959
~~'ORt°P Urban Beautification Quality Inspection Report
Grounds Maintenance
Vendor: ~ l~:~r~-c_,~,~ `~-~ ~~~~ Date: ~' ~
Project: _ ~>~. j~C.r ~ l`e~'~-''"...
Safetv and Eguiament:
C
Monthly Main//tenance Reports
_Yes_'"No Dafe:
..1~"~-~
Service Requests: (To be handled within 7 workin days unless othervvise noted.)
I.v,ro~.~{tc~H-sue ci i-- ~.~.,~a$--.:vo~~' i~3i' ~ ~ ~-o ~2 .r-(:P (fl C.f? .e~ w~.e_~ t~.Y~r~ _.
•
~~6~ ~/~,
Urban Beautification Quality Inspection Report
Grounds Maintenance
Vendor: T ~~~'° ~ ~ j`.-~-~i~ ~~~Date: ~;~~
Project: ~~~- ~~~
Safety and Equipment: J~ /
Monthly Maintenance Reports
Yes No Date:
1. Mowing, mechanical trimming, and cleanup of turf areas. 1 2 3 4- 5
2. Weeding of planters, curbs, walks, and hardscape areas. 1 2 3 4 5
3. Trash and debris removal. 1 2 3 4 5
Edging of planters and hardscape areas. 1 2 3 4 5
5. Irrigation system coverage. 1 2 3 4 5
6. Fertilization and chemical program. 1 2 3 4 5
7. Trimming of shrubs and hedges. ~ 2 3 4 5
8. Overall appearance and curb appeal. ~'~ 3 4 5
9. Vendor communication. 1 3 4 5
--,
•
Service Requests: (To be handled with ^n 7 working days unl ~ s attierwise`iio~d~
~• /'awl . _- .~~ ,.~,J.~c~' Qf../1 ~~.tin1• /~/~ACe ~~.- ~ ~ y~/-.. Q DA1fC.
Rpr 20 04 O1:lOp Eastwood Tuff Turf (4071 366-4547 p.z
- 'EaSt~vood Tuff T~Erf of Central Florida, Inc.
1615 Oklahoma Street
Oviedo, FL 32765
M T W T F S S
M T W T F S S
•
CURRENT
`A' Run Days
`B' Run Days
CLOCK# 1
M T W T F S S
M T W T F S S
Job Name: COWS Oak Forest
Date: 3/15/04
Page~_ of_.~_,
ADJUSTED
`A' Run Days
`B' Run Days
`A' Start Time
`B' Start Time
ZONE NUMBER 1 2 3 4 5 6 28 29 33
CURRENT RUN TIME 15 m 20 m 20 m 15 m 15 rn 15 m 20 m 20 m 20 m
DAYS OF WEEK WBc
Su W&
Su W&
Su W&
Su W&
Su W&
Su W&
Su W&
Su Wd'c
Su
START TIMES 3:30
am 3:45
am 4:00
am 4:15
am 4:30
am 4:45
am 2:00
am 2:00
am 2:30
am
4" POP UP
6" POP UP
12" POP UP
ROTOR
CHANGE 4" TO ti" POP UP
CHANGE 6" TO 12" POP UP
HEAD RAISED SHRUB
SEVERE CLOG
INCORRECT NOZZLE
RELOCATION
LEAK IN HEAD
LEAK IN PIPE
HEAD NOT ROTATING
VALVE NOT OPERATING
OTHER -SEE COMMENTS
COMMENTS: (Attach extra sheet if necessary): Zone 6. Hawthornes need to be lowered in median. Zone 1, (1) nozale 8c screen
renlaced. Zone 3, replaced (1) 12" ~ up & %" Street Ell.
Douglas Dickerman
INSPECTED BY
•