Loading...
HomeMy WebLinkAbout2002 10 24 Regular Item A I Hound Ground J etta Park Winter Springs Florida ~ p',~l,l,~e I master p~~~ ~ c::J / / // / / LLf'~L I-' park rules ~ rule signage ~ keep ou, park clean sign/disp/waste ~- drinking/wash fountain ~u, Ranaldi Planning and Architecture Inc , " Jetta Park Hound Ground Master Plan Opinion of Construction Value (rev 1) 24 Oct 02 Description Unit QUdntity Value Subtotal Total Possible Project Phasing Site Work Phase I Phase II Phase III clear and grub ac 5 $ 3,500 $ 17,500 $ 17,500 import structure fill cv 880 $ 5 $ 3,960 $ 2,000 $ 1,960 roadway from 434 to site sy 6306 $ 22 $ 138,732 $ 70,000 $ 68,732 roadway parrallel to Darking sv 884 $ 21 $ 18,564 $ 18,564 roadway and parking with in site sy 5446 $ 16 $ 87,136 $ 20,000 $ 67,136 stormwater retention alow 1 $ 40,000 $ 40,000 $ 40,000 utilities allow 1 $ 50,000 $ 50,000 $ 5,000 $ 22,500 $ 22,500 concrete sidewalk cv 47 $ 160 $ 7,520 $ 7,520 resilient surface trail sf 10100 $ 6 $ 60,600 $ 30,000 $ 30,600 landscape and irrigation allow 1 $ 75,000 $ 75,000 $ 75,000 site lighting ea 48 $ 2,000 $ 96,000 $ 48,000 $ 48,000 subtotal $ 595,012 $ 147,500 $ 306,320 $ 141,192 Structures office I storage I restroom bldg sf 650 $ 150 $ 97,500 $ 97,500 maintenance building sf 500 $ 90 $ 45,000 $ 45,000 Davilions ea 8 $ 20,000 $ 160,000 $ 60,000 $ 100,000 covered entry gate ea 2 $ 10,500 $ 21,000 $ 10,500 $ 10,500 decorative fencing If 1470 $ 85 $ 124,950 $ 124,950 chain link fencing If 1090 $ 9 $ 9,810 $ 20,000 water feature allow 1 $ 60,000 $ 60,000 $ 60,000 subtotal $ 518,260 $ 20,000 $ 168,000 $ 340,450 Miscelaneous entry kiosk ea 2 $ 7,500 $ 15,000 $ 7,500 $ 7,500 signage I trash I dispenser ea 10 $ 2,200 $ 22,000 $ 22,000 water spigots ea 8 $ 1,800 $ 14,400 $ 14,400 subtotal $ 51 ,400 $ 36,400 $ 7,500 $ 7,500 construction subtotal $ 1,164,672 $ 203,900 $ 481,820 $ 489,142 design contingency 5% $ 58,234 $ 10,195 $ 24,091 $ 24,457 fees and permits 10% $ 116,467 $ 20,390 $ 48,182 $ 48,914 contractor oh&p 14% $ 163,054 $ 28,546 $ 67,455 $ 68,480 project total $ 1,502,427 $ 263,031 $ 621,548 $ 630,993 --:;. PAW PARK OPERATIONS PLAN PROJECTED MAINTENANCE, MATERIALS, AND OTHER EXPENDITURES RECOMMENDED LEVEL OF SERVICE TASKS X MAN HOURS X RATE PER HOUR = LABOR COST 1. MOWING, EDGING, WEED-EATING, BLOWING: 2 PEOPLE X 4 MAN-HOURS EACH = 8 MAN HOURS - 2 TIMES PER WEEK = 16 TOTAL MAN-HOURS PER WEEK X 4 WEEKS = 64 MAN HOURS PER MONTH X $ 10.00 PER HOUR = $ 640.00 X 12 MONTHS = $ 7,680.00 PER YEAR. 2. TRASH PICKUP AND REMOVAL: 2 PEOPLE X 1 MAN-HOUR EACH = 2 MAN HOURS PER DAY X 7 DAYS PER WEEK = 14 MAN HOURS PER WEEK X 52 WEEKS = 728 MAN-HOURS PER WEEK X $ 10.00 PER HOUR = $ 7,280.00 PER YEAR. 3. FACILITY CLEAN UP: WASH DOWN PAVILIONS, BENCHES, TRAIL PATH AND DO RESTROOM MAINTENANCE DAILY, 2 PEOPLE X 1,25 MAN-HOURS EACH = 2.50 MAN-HOURS PER DAY X 7 DAYS PER WEEK = 17.50 MAN-HOURS PER WEEK X 52 WEEKS PER YEAR = 910 MAN HOURS PER YEAR X $10.00 PER HOUR = $ 9,100.00. 4. FERTILlZATION/WEED CONTROL: APPLICATIONS TO BE DONE QUARTERLY, 4 ACRES AT 1-ACRE PER HOUR X 1 PERSON = 4 HOURS PER APPLICATION X 4 APPLICATIONS PER YEAR = 16 MAN HOURS PER YEAR X $ 10.00 PER HOUR = $160,00 PER YEAR (APPLICATION ONLY), 5. INSECT CONTROL: (MOLE CRICKETS, SOD WEBWORMS, CHINCH BUGS, FLEAS, TICKS, FIREANTS) 1-PERSON DONE Bl-MONTHLY 1 HOUR PER ACRE TO APPLY X 4 ACRES = 4 MAN HOURS EVERY OTHER MONTH = 24 MAN HOURS PER YEAR X $ 10.00 PER HOUR = $ 240.00 PER YEAR (APPLICATION ONLY). 6. IRRIGATION SYSTEM CHECK AND MAINTENANCE: 1 PERSON, 1 TIME PER MONTH -1.50 MAN-HOURS PER CHECK = 18 MANHOURS PER YEAR X $ 10.00 PER HOUR = $ 180.00 PER YEAR (P.M. WORK ONLY DOES NOT INCLUDE REPAIRS). TOTAL DOLLAR AMOUNT OF LABOR COST FOR MAINTENANCE! OPERATIONS PER YEAR = $ 24,640.00. .... '. 0uswbiirt rY/A. Chut (JL 1 M IO!J4jO) i I I I l. _ _ __,____ __. ..___.__ -_ I _ _ __"__ -.J ,-.;;a MATERIALS AND OTHER EXPENDITURES COST PER YEAR 1. JANITORIAL SUPPLIES: TRASH BAGS, CLEANING SUPPLIES, PAPER SUPPLIES, ECT. $ 3,000.00 PER YEAR (EXAMPLE COST - 12 TRASH RECEPTACLES EM PIED 2 TIMES PER DAY = 24 TRASH BAGS PER DAY X 7 DAYS = 168 BAGS PER WEEK X 52 WEEKS = 8,738 BAGS PER YEAR DIVIDED 100 BAGS PER CASE = 87.36 CASES PER YEAR X 22.50 PER CASE + $ 1,965.60 JUST FOR TRASH BAGS. 2. IRRIGATION SUPPLIES: MATERIALS SUCH AS PVC, GLUE, CLEMENT, SPRINKLER HEADS, PVC FITTINGS, PVC PIPE, TELFON TAPE, VALVES AND SOLENOIDS = $ 1,000.00 PER YEAR. 3. UTILITIES: ELECTRICITY, WATER AND SEWER, DUMPSTER FEES = $ 5,500.00 PER YEAR. 4. EQUIPMENT MAINTENANCE: MOWER BLADES, WEED-EATER STRING, FILTERS, OIL, BELTS, ETC. = $ 1,200.00 PER YEAR. 5. FERTILlZER/WEED CONTROL: APPLIED 4 TIMES PER YEAR AT A RATE 1.5 TONS PER 4 ACRES X $ 600.00 PER TON = $ 900.00 PER APPLICATION X 6 = 3,600.00 PER YEAR (PRODUCT ONLY). . 6. INSECT CONTROL: APPLIED 6 TIMES PER YEAR AT A RATE OF 1.5 TONS PER 4 ACRES = $ 600.00 PER TON = $ 900.00 PER APPLICATION X 6 = $ 5,400.00 PER YEAR (PRODUCT ONLY). TOTAL COST OF MATERIALS AND OTHER EXPENDITURES = $ 18,700.00 PER YEAR. TOTAL LABOR COST AND OTHER EXPENDITURES = $ 24,640.00 PER YEAR. TOTAL PROPOSED MAINTENANCE/OPERATION BUDGET = $ 43,340.00 PER YEAR. WORKING WITH LOCAL ADVOCACY GROUPS AND FINDING CORPORATE SPONSORSHIP ARE OPTIONS TO HELP DEFRAY SOME OF THE MAINTENANCE AND OPERTIONAL AND OPERATIONAL COSTS OF A DOG PARK.