Loading...
HomeMy WebLinkAbout2000 02 28 Consent A Fire/Public Safety Impact Fee Fund . . . COMMISSION AGENDA ITEM A CONSENT INFORMATIONAL PUBLIC HEARING REGULAR x February 28, 2000 Meeting MGR Authorization . REQUEST: Fire Department requesting authorization for expenditures from the FireIPublic Safety Impact Fee Fund balance. PURPOSE: The purpose of this Commission item is to gain Commission authority to authorize expenditures from the FireIPublic Safety Impact Fee Fund balance for an amount not to exceed $6,069,00 for the removal of vegetative debris and importation of structural fill to the future Fire Station site on Highway 434 adjacent to the Creeks Run subdivision, CONSIDERATIONS: The future Fire Station site on Highway 434 adjacent to the Creeks Run subdivision contained vegetative debris and the ground level was much lower than the adjacent property including the newly constructed Highway 434. The City through the Public Works Department had been attempting to remove much of the debris due to complaints of citizens in the Creeks Run subdivision but the remaining material was too large for the Cities equipment to handle, The contractor of the Highway 434 project, Hubbard Construction Company was closing out their project and the Public WorkslUtility Director Kipton Lockcuffnegotiated the removal of the vegetative debris and importation of 2,502 cubic yards of clean structural fill material at the Fire Station site, The proposed cost was for hauling and personnel time, the fill material was offered at no cost thus saving approximately $2,000.00 in future expenses, This project had to occur simultaneous with the Highway 434 project closeout and was determined to be in the best interest of the City to proceed with the work, . . . February 28, 2000 Consent Agenda Item "A" Page 2 To utilize current budgeted funds for other anticipated Public WorkslUtilities projects it was determined that this project met the intent of the FirelPublic Safety Impact Fee to provide site development for the future Fire Station property, This work would reduce future expenditures on this site for debris removal and fill material that would eventually be required when developed. Also, this project would improve the ability to maintain the site, and eliminate standing water complaints from adjacent residents, The Fire Department would request consideration and authorization by the City Commission for approval of funds not to exceed $6,069,00 from the FirelPublic Safety Impact Fee Fund balance, The current balance of the FirelPublic Safety Impact Fee Fund is $280,488,00 FUNDING: The funding was not requested or approved in this current year budget, but due to the consideration of the debris removal to eliminate complaints and abilitY to fill the property with material that was readily available the Fire Department is requesting funding for an amount not to exceed $6,069.00 from the FirelPublic Safety Impact Fee Fund balance, RECOMMENDATION: It is recommended that the City Commission authorize funding for this project not to exceed $6,069,00 from the FirelPublic Safety Impact Fee Fund balance for vegetative debris removal and importation of structural fill material for the future Fire Station site on Highway 434, IMPLEMENTATION SCHEDULE: Work is already complete; this request is for consideration for funding from the FirelPublic Service Impact Fee Fund balance, ATTACHMENTS: 1, Memo/Quote from Hubbard Construction Company COMMISSION ACTION: . HE Hubbard Construction Company January 4, 2000 10246-103 Mr, Kipton D. Lockcuff, P,E. Public Works! Utility Director 1126 East SR 434 Winter Springs, Florida 32708 Subject: Structural Fill at Future Fire Station and WWTF Dear Mr, Lockcuff: . During the week of December 13, 1999, Hubbard Construction Company removed ten loads of vegetative debris and imported 2502 CY of clean structural fill to your future Fire Station location. In addition, 216 CY of clean structural fill were delivered to the WasteWater Treatment Facility. Once importation ceased, erosion control fencing (silt fence) was placed at the eastern end of the fill operation. Although we had expected to break both curb and sidewalk, none was damaged. Landfin fees and trucking charges have been passed directly, while standard fees for loading debris and soil has been included in these charges. Please note that no mark-up has been charged. Attached you will find a detailed breakdown of all costs associated with this operation. Please issue a check in the amount of$6,435.11 as shown on the enclosures, Should you have any questions or require more infonnation,please contact me at 265-7288, Sincerely, ~RCTlONCO~ANY Bunker Hill, E.!. Project Engineer . Enclosures CC: Philip Gordon! Rob Brown Contracts! Job File! Reading P.o, Box 547217 · Orlando, FL 32854-7217 · (407) 645-5500 . FAX (407) 623-3865 " . I 1'1 ,. ,,.. , HUBBARD CONSTRUCTION COMPANY S.R. 434 . PROJECT #10246 1/5/005:13 PM This pricing is for Removal of Vegetative Debris and importation of Structural Fill to the location of the future Fire Station and the Winter Springs Wastewater Treatment Facility. , Summary LABOR & EQUIPMENT $6,340,01 ..5% BOND GRAND TOTAL: $95,10 $6,435.11 . Page 1 of 2 .. HUBBARD CONSTRUCTION COMPANY S. R. 434 PROJECT #10246 1/5/005:13 PM . Labor, Equipment, and Material Charges LABOR & EQUIPMENT (UTILITY CREW): I DESCRIPTION II QTY IIUNITII DURATION II HRL Y CREWII TOTAL I Debris Clearing, Loading, & 1 LS 21.25 Hrs $102,77 $2,183,76 Spotting Trucking 1 LS 93,5 Hrs $37.50 $3,506.25 Dump Fees 1 LS 10 Lds $65.00 $650,00 IISUBTOTAL $6,340,01 II Crew Composition and Charges OURL Y UTILITY CREW DESCRIPTION I QTY IluNITl1 U/P II TOTAL I FOREMAN 0.5 EA $29,85 $14,93 LOADER OPERATOR 1 EA $17,92 $17.92 LABORER - MUL TI-SKILLED 1 EA $16.45 $16.45 25% Labor Mark-Up SUBTOTAL $49,30 ' I DESCRIPTION II QTY IluNITl1 U/P II TOTAL I LOADER 1 EA $49.27 $49.27 4 x2 RANGER 0,5 EA $8.40 $4,20 7.5% Equipment Mark-Up SUBTOTAL $53.47 IIHOURL Y TOTAL: $102,7711 . Page 2 of 2