Loading...
HomeMy WebLinkAbout2005 07 06 Regular 500 Approval of Final Engineering/Site Plan for the Belle Avenue WarehousePLANNING & ZONING AGENDA ITEM 500 July 6, 2005 Meeting MGR. /Dept. REQUEST: Community Development Department requesting the Planning and Zoning (P&Z) Board consider and approve a final engineering/sitepfan for the Belle Avenue Warehouse. PURPOSE: The purpose of this Agenda Item is to request that the P&Z recommend that the City Commission approve a final engineering/sitepfan for this 1.174-acre site. The site has an Industrial Future Land Use designation and is within the Commerce Center [Commercial] zoning district. APPLICABLE LAW: Chapter 5, City Code. Chapter 9, City Code. Chapter 16, City Code. Chapter 20, City Code. CONSIDERATIONS: The site is located on the east side of Belle Avenue, generally southwest of the Winter Springs Elementary School and due west of the Walden Terrace residential subdivision. The area north of the site is part of the Commerce Center, the areas west and south of the site are within the City of Casselbenry and have Industrial zoning. There are no known environmental issues associated with this site. The site is presently developed with 3 masonry residential structures, a pool, and one approximately 2,730 square foot metal building. The 3 residential structures and the pool will be demolished. The existing metal building will remain as part of the site. Water and sanitary sewer will be provided by the City of Winter Springs. Storm-water management is provided by 2 ponds - at in the east and one at the west end of the site. July 6, 2005 P&Z Item 500 Page 2 of 2 Section 9-277 (28) of the City Code requires 1 parking space for each 4 employees in this type of facility. There are estimated to be a total of 39 employees (10 required spaces), for which 18 parking spaces are provided. Three of these 18 spaces are handicap accessible. Signage is provided consistent with section 16-86 of the City Code. RECOMMENDATION: Staff recommends that the P&Z Board recommend the City Commission approve the attached final engineering/site development plan. ATTACHMENTS: A Final Engineering/Site Plans P&Z ACTION: 2