HomeMy WebLinkAbout2007 01 22 Informational 500 Current Planning Projects
COMMISSION AGENDA
ITEM 500
INFORMATIONAL
January 22,2007
Meeting
MGR.DEPT
Authorization
REQUEST: Community Development Department is advising the City Commission of the
status of various current planning projects.
PURPOSE: This agenda item is to update the Commission on the status of current planning
projects.
CONSIDERATION:
(1) Blackstone Subdivision - On August 2, a large-scale comprehensive plan amendment
package was received from Samuel Bowman for 31.45 acres (Donald Weaver property),
located east of Barrington Estates and west of DeLeon Street. The applicant wishes to amend
the Future Land Use designation from Seminole County Rural 3 to City of Winter Springs Low
Density Residential (as many as 3.5 D.D. per gross acre) as the first step to developing an
approximately 70 D.U. single family residential subdivision. The large scale FLU amendment
was approved by the Commission on October 23 for Rural Residential, instead of Low Density
Residential. The applicant subsequently withdrew his application. per 11/13/06 agenda
(1A) Don King Concrete - Revised final engineering plans for a new 10,000 SF office
building behind the existing office (a converted home) on the 2.5 acre site, along the north side
of SR 434, between Barrington and the Barkley Reserve, were submitted on February 27 and
reviewed at the March 21 staff review (re-submittal reviewed at May 16 staff review). The site
plan was approved, subject to conditions, at the November 27 Commission meeting. A
preconstruction conference was held on December 6, 2006, and the site clearing has been
accomplished. per 01/08/07 agenda.
(2) Jetta Point Park - On August 14, PBS&J submitted a conditional use (CU) application, on
behalf of Seminole County, for a combination active and passive park at Jetta Point, located on
the south side of SR 434, adjacent to the south-bound on-ramp for the Greeneway (417). The
CD public hearing on September 7 at the BOA was postponed to the October 5 meeting, at the
applicant's request. The City sponsored a workshop/neighborhood meeting at City Hall with
Seminole County and the nearby residents on October 2. On October 9, the Commission
provided formal direction to staff regarding processing the County's request. The large scale
comp plan amendment was postponed from the October 4 LP A meeting to a special October
January 22, 2007
Information Item 500
Page 2
16 LPA meeting, but was subsequently withdrawn. Ordinance No. 2006-19, which allows
public recreation facilities as permitted uses within the C-I and PUD zoning districts had 1st
reading on October 23, 2nd reading on November I, and was adopted on November 13. per
12/11/06 agenda
(2A) Vista Willa - A concept plan for two (2) 39,500 square foot office buildings (now 39,900
SF each) on 9.17 acres within the Tuscawilla PUD, located on the south side ofSR 434,
between the Hess station and the Greeneway, was received June 8 and received a concept
approval on August 22, 2005. The plans for phase I and a development agreement were
approved at the January 23 City Commission meeting. A preconstruction meeting was held
February 8. A groundbreaking ceremony was held on March 8. The aesthetic review was
approved at the April 24 Commission meeting. Phase II final engineering plans were reviewed
at the May 2 staff review; revised plans were submitted on May 18 for phase II; revised plans
for Phase II are scheduled for the August 28 Commission. The power company had not
provided a lighting plan, so RSH, the project design engineers, have submitted an overall site
lighting plan. At its June 12 meeting, the City Commission amended the DA to allow the
building permit to be issued prior to submittal of the lighting plan (lights to be operational
before CO). Phase II final engineering was approved on September 7. At its September 25
meeting, the Commission approved a Landscape Construction & Maintenance agreement with
the FDOT for landscape and sidewalk maintenance associated with the office center. Utilities
are nearly complete, minus any above-ground items (e.g. back-flow preventers, services), due
to building construction. Development agreement modification requests were approved by the
Commission 12/11/06. Meters were located close to SR 434, inconsistent with the engineering
and building plans. The applicant has proposed providing a decorative wall and signage in
front of the meters. per 01/22/07 agenda
(3) Oviedo Marketplace - Notice was provided on April I, 2005, of the Notice of a Proposed
Change (NOPC # 5386) for the Oviedo Marketplace [Mall] development of regional impact
(DRI). The 431.2 acre DRI is located among 3 jurisdictions (218.6 acres in Oviedo, 163 acres
in unincorporated Seminole County, and 49.6 acres in Winter Springs). The NOPC is
proposed to allow 180 town home units to replace 10,000 SF of retail in Parcel 13 (within
Oviedo, but adjacent to Winter Springs - Tuscawilla Units 7 & 13). The build-out date for the
entire DRI is being extended from 12/31/05 to 12/31/07. Pursuant to a May 9,2005, City
Commission directive to staff, notification was sent to the owners of 103 properties within the
City of Winter Springs. The NOPC for the Oviedo portion was approved by the Oviedo City
Commission on Monday, September 19, 2005. The NOPC to change the Winter Spings
portion of the DRI from 160,000 square feet of commercial to 131,000 square feet of
office/commercial and 132 townhomes was heard at the February I P & Z meeting (2-2 vote)
and was approved for 100 townhome units at the March 27 Commission meeting. Staff is
working with The Viera Company and two developers on an amendment to the Planned Unit
Development master plan for Parcel 14 to allow development pursuant to the latest NOPe. On
November IS, the Inwood Holding Group submitted conceptual plans for an office center,
without the master plan for Parcel 14. These were reviewed at a December 12 staff review.
The PUD amendment was subsequently provided and received a recommendation for
approval at the January 3 P&Z meeting and is scheduled for the January 22 Commission
meeting along with a proposed lot split to divide the 15.1 acres into 2 parcels the office
site and a residual. The office center plans are still in staff review. per 01/22/07 agenda
January 22, 2007
Information Item 500
Page 3
(4) Colonial Bank - Final site/civil plans were approved at the March 13 Commission
meeting. A pre-construction meeting was held on March 16. An aesthetic review package was
approved at the April 24 Commission meeting. On June 12, the Commission approved a
development agreement modification addressing signage. The Commission validated the site
to be in substantial conformance with the approved final engineering plans at its September 25
meeting. At its October 9 meeting, the Commission authorized PEC to design intersection and
traffic signal improvements at the SR 434Nistawilla Drive intersection. per 10/23/06 agenda
(4A) Seminole Trail Animal Hospital- Dr. Williams, DVM, submitted a combined
preliminary and final engineering/site plan along with a lot split application on December 1,
2005. The site plan was reviewed at the December 20 staff review. The final engineering/site
plan and aesthetic review were approved at the April 24 City Commission meeting. A
preconstruction conference was held on April 25. The proposed lot split was approved at the
July 24 Commission meeting. At its January 8, 2007, meeting, the Commission validated
the rmding that the site had been built in substantial accordance with the rmal
engineering plans. The applicant now proposes two 6-foot tall monument signs - one for
each lot. per 01/22/07
(5) ICI Homes - 480 condo units. 80,000 SF of office. A Large Scale Future Land Use change
was transmitted to DCA on October 25, 2004. The adoption hearing amending the Future
Land Use map was held January 24,2005. Staff met with ICI representative on August 4,
2005, to discuss rezoning, height, and site plan issues. per 08/22/05 agenda
(6) Tuscawilla Square - The final engineering/site plan was approved on February 28, 2005.
The aesthetic review was approved at the May 9 City Commission meeting and a pre-
construction was held on May 18. At its June 13, 2005, meeting, the City Commission
approved funding $174,454.00 for the Gary Hillery Drive reconstruction. No funding was
approved for entrance features. Staff is working with the developer to resolve the issue of the
large wall-oriented electrical meter banks, visible from Winter Springs Boulevard and Gary
Hillery Drive. Staff is compiling a "punch-list" of items to be resolved. On August 7, the
applicant provided staff with a rendering of proposed changes to the existing Tuscany
Restaurant. The Commission validated the site to be in substantial conformance with the
approved final engineering plans and authorized reimbursement of$165,613.50 for Gary
Hillery Drive improvements at its September 11 meeting. Site work has been completed and
accepted by the City. Building #1 has received a Certificate of Completion and work continues
to finalize Building #2. per 11/27/06 agenda
(7) Winter Springs Town homes (AKA Sonoma Pointe or Sonesta Pointe) - Preliminary
plans for approximately 436 town-homes on 40 acres within the Town Center were received
from Engle Homes on July 2,2004, and were reviewed at the July 20 staff review. The City
Commission approved a concept plan at its August 9, 2004, meeting and refined it at its
September 27 meeting. The City Attorney noted that the concept plan, as proposed, would
require a development agreement or special exception or both. The 40 acres has been acquired
without platting. The applicant has hired a new design team and met with staff on May 31 and
July 8, 2005 to summarize outstanding issues. On August 29, staff received an aesthetic
review package. The state required a letter from the City's Local Planning Agency, stating that
January 22, 2007
Information Item 500
Page 4
crossing the Cross-Seminole Trail with underground utility lines is consistent with the City's
Comprehensive Plan (approved at the December 6,2005 LP A/P&Z meeting). The incomplete
combined preliminary and final engineering plan submittal was reviewed at the February 7
staff review. An aesthetic review package was reviewed at the April 24 and May 8
Commission meetings, but a decision was deferred over diversity of units as well as the alley
sides of the units. The aesthetic review was approved at the August 28 Commission meeting.
A final engineering plan was resubmitted on September 20 and was reviewed at the October 3
staff review. A request for an early work permit was heard at the September 25 meeting, but a
decision was deferred until more information is provided regarding specimen tree preservation.
The applicant withdrew the early work permit request. The applicant resubmitted for an early
work permit and provided the additional information requested by the Commission. This
permit was approved by the Commission at the 11/13/06 Regular City Commission meeting.
The final engineering plans and the Development Agreement were approved at the December
11,2006, Commission meeting. per 01/08/07 agenda
(8) JDC Calhoun/. Construction continues. City records indicate the following businesses are
locating or have located in the JDC Calhoun Town Center:
Building 1 - Tijuana Flats, an insurance agency, Cristiano's, Barnie's, Toastisimo's
restaurant, and Giancarlo' s;
Building 2 - Marble Slab Creamery, James Doran office, Home Town Mortgage, Isis, a
barber, Dr. Herba's Chiropractic office, and The Party Store;
Building 3 - Beef O'Brady's restaurant and an insurance company.
Building 8 - Leslie Pool Supply, a dentist, and a tanning salon, Edward Jones; Century 21
offices;
Building 9 - Red Bug Cleaners, E-Nails, Great Clips, Famous Uncle AI's Hotdogs, and
Subway;
Building 10 - Washington Mutual;
Building 11- State Farm, H & R Block, Rachel Nicole's Salon, Shape Xpress, and a dentist;
Building 12 - Publix;
Building 13 - Winter Springs Liquors, Mailboxes, Etc;
Building 14 - China Feast and a sushi restaurant; and
Building 15 - Wendy's.
Building 16 - a dance studio, a health-food store, a pet supply, and Merle Norman
On January 24,2005, the City Commission approved final engineering plans from Lochraine
Engineering for the northeast portion of the JDC site (that area north of Tree Swallow Drive
and east of Cliffrose Drive including buildings 3, 4, & 16). A pre-construction meeting was
held on March 15, 2005, for the 2 acre portion ofthe approximately 15 acre site. Revised final
engineering plans for this 2 acres were approved at the April 25 City Commission meeting. A
third iteration of the final engineering plan was approved at the September 26, 2005
Commission meeting.
Building elevations for Building 3 (2 story & 15,620 SF) were approved at the May 9,2005,
City Commission meeting. Building plan issues regarding a fire riser room location and the
location of the 2 internal stairways were resolved at the October 10, 2005, Commission
meeting. Water line conflict held up construction of Building 3. Building 3 is currently being
January 22, 2007
Information Item 500
Page 5
repainted to match the colors approved with the aesthetic review. An interior build-out for a
Beef 0' Bradys has been submitted and staff believes they and the applicant have resolved
the major inconsistencies with the Town Center Code. A discrepancy (between the
approved engineering plans and the architectural plans) has been discovered between the
rmished Door elevation and adjacent sidewalk along Tree Swallow Drive. The approved
plans depict a stem retaining wall at the building with a 12 foot wide sidewalk paved
from the building to the curb. Staff is working with the design team to resolve this 1.5'
elevation issue.
Building 4 (combination 7,800 SF first floor retail and restaurant with second and third floor
residential condominiums with a fourth floor penthouse suite - 15 residential units) was
approved for aesthetic review on September 12,2005, although the Commission voted to have
the applicant come back to show a combination of 2, 4, and 6 foot deep balconies. The
approved distance"between buildings 3 and 4 was amended from 20' I" to approximately 16'
at the September 11 Commission meeting. Revised building plans were submitted on
September 20 and October 12. Meeting Florida Building Code requirements for fourth floor
roof access, within the parameters of the approved aesthetic review, appears to be the primary
hurdle at this point. The applicant has satisfied all outstanding conditions for the issuance of a
building permit. The plans, as permitted, provide this access. The applicant is in the process
of addressing the aesthetic changes to the building. These changes will not affect the building
construction until the building is at the fourth floor level. The building plans will be brought
back to the Commission if additional aesthetic review is necessary because of the stairway
access to the roof. The contractor has encountered compaction issues at the Building 4
site and is considering various engineering alternatives.
Building elevations for Building 16 (11,095 SF) were approved with conditions at the June 13,
2005, City Commission meeting; revisions with a trellis at the west end and other minor
modifications were approved on September 12, 2005. Vertical construction continues. A
major restaurant is considering locating in the east end of the building (closest to Tuskawilla
Road). On July 10, 2006, the Commission approved a minor modification to the west end of
Building 16, to remove one door and move another door at the west end of the building
(adjacent to the circle). The applicant has requested a Certificate of Completion for the
shell. Staff has compiled a list of inconsistencies between the approved aesthetic review
and the building as it was constructed. Building-mounted signage for the proposed dance
studio and Merle Norman have been submitted and received Planning approval.
The Commission approved a concept elevation of Building 17 (a 26 unit residential
condominium) at the September 12, 2005, meeting, noting that a number of site issues (e.g.
parking, access, and the space adjacent to the traffic circle) must be resolved with the site plan.
An aesthetic review package for a pergola (along with a dumpster enclosure for Building 16),
located on the Building 17 site, adjacent to the circle, has been submitted. The concept site
plan and a development agreement were approved at the October 10, 2005, meeting. A third
modification of the applicable development agreement was received without a fee on March 2.
Both the re-plat and modification were addressed at the March 7 staff review. The re-plat was
approved at the April 10 Commission meeting and has been recorded. A revised Building 17
site plan and aesthetic review were approved at the August 28 Commission, subject to
conditions. A ground-breaking ceremony was held on-site on September 28 and the site work
January 22, 2007
Information Item 500
Page 6
has proceeded to the point that the underground utilities are in place and the parking lot
is ready to be paved. The incomplete building plans that were submitted on October 12 had
aesthetic modifications to the roof-line, first floor elevation along Cliff Rose Drive (labeled
Big Cypress), and the relief at the rear entrance to the building. At a special November 1
meeting the Commission approved the lower first floor elevation along Cliff Rose Drive. The
issues of maintaining the approved roofline and providing access to and from the fourth story
roof as well as HV AC placement are being studied. Staff awaits a complete building plans
re-submittal. per 01/22/07 agenda
At the January 8, 2007, meeting, the Commission authorized awarding the contract for
the Blumberg Boulevard Median and Trail Improvement Project to Southeast
Enviroscape, Inc. per 01/22/07 agenda
(8 A) Town Center Phase lIThe Doran team met with staff on June 2, 2005, to outline their
plans for 331 apartment and condominium units, 43,000 square feet of retail, 354 structured
parking spaces (multi-level parking garage), and surface parking (on-street and parking lots) on
the east side of Tuskawilla Road. An updated projection by the development team on August
11 divided their proposed development east of Tuskawilla Road into Phase II A and lIB, with
no vertical construction east of the trail bridge, due to wetland issues. Phase II A plans were
submitted on February 7 for 33,452 square feet of retail and 292 residential units on 7.75 acres.
The plans were reviewed at the March 7 staffreview. The build-out for phases II A and lIB
totals 400,000 square feet of retail, 300,000 square feet of office, and 700 residential units,
with 2 and possibly 3 parking structures. A Phase II development agreement (DA) was
approved by the City Commission on October 17, 2005, requiring the buildings in Phase II to
be 6 stories high. The DA has conflicting language on building height. Staffis working to
resolve the conflict and the DA will be amended to include language allowing building heights
up to 6 stories. The site plan and aesthetic review package were reviewed at a special April 11
staff review. A site development permit agreement to clear the Phase II A site was approved at
the April 24 Commission meeting. A first round of aesthetic review comments has been
submitted to the applicant. The aesthetic review for Phase IIA was approved at the June 12
Commission meeting. The Phase IIA final engineering was approved at the July 10
Commission meeting, subject to conditions and the up-coming implementation agreement. per
07/24/06 agenda
(9)Artesian Park (formerly Lincoln Park) - A concept plan for 106 (was 113) town homes on
the 8 acre site, located on the south side of Orange Avenue, between Jesup's Landing (185
units on 17.15 acres) and Tuskawilla Trace, was approved, subject to conditions by the City
Commission on March 14,2005. The plan depicted roadway connections with Jesup's
Landing, use ofthe shared alley with Jesup's Landing, 2 boulevards with water features in the
medians, some town homes around a plaza, and some town homes with small back yards and
detached garages. On July 27, the applicant submitted a modified concept plan that included
only one boulevard with a median water feature. The revised concept plans were approved at
the October 10, 2005, meeting. Final engineering/subdivision plans were submitted on
November 21 and were reviewed at the December 6 staff review. Dover Kohl, staff, and the
applicant's team have been trying to best address the concept oflive-work units, raised door-
yards, and courtyards at grade (since the applicant has determined that the Brownstone concept
is financially impractical for this site, due to the amount of fill material that would need to be
January 22, 2007
Information Item 500
Page 7
imported). Revised final engineering plans, a traffic analysis, a stormwater report, a geo-
technical report, revised potable water calculations, by-laws, articles of incorporation, and an
ecological report were submitted on March 20 and were addressed at the May 2 staff review.
The applicant's team met with engineering staff on June 9 to discuss the adjacent deep muck
issue and other pertinent construction issues. The final engineering plans were approved at the
June 12 Commission meeting, subject to staff conditions and a development agreement. The
development agreement is proposed to be presented for approval concurrent with the aesthetic
review by the Commission. per 09/25/06 agenda.
(10) Jesup's Landing (previouslyBarclay II and then Jessup Reserve) - 185 Units. At its
October 11, 2004, meeting, the City Commission approved a concept plan for as many as 207
town house units with rear-loaded 2 car garages and 128 on-street parking spaces on 17.15
acres along the south side of Orange A venue. A development agreement and revised concept
plan for 185 units were approved at the February 28 City Commission meeting. On May 9 the
City Commission approved the Town Center Phase I Site Development Permit Agreement.
The final engineering/subdivision plans were approved at the June 27 City Commission
meeting. The aesthetic review was approved at the September 26,2005, City Commission
meeting. Revisions to the final engineering plans (addressing specimen trees, bus shelter, &
lift station) were approved at the October 10, 2005, meeting. The final plat for Jesup's
Landing was approved at the 11/14/05 City Commission meeting. On November 30, staff met
with both the Jesup's Landing and Artesian Park development teams, to discuss the shared
alley easement that both subdivisions will use. The Jesup's Landing final plat revision was
approved by the City Commission at the January 9 meeting, to incorporate minor
modifications, based on discussions and negotiations between the two developers and the City,
regarding an easement along the project's eastern property line. Porch and stoop
encroachments into common areas may require another re-plat, as in Jesup's Reserve. At its
July 10 meeting, the Commission reviewed information on the proposed use of "geo-foam"
underneath four buildings to address the muck situation. The applicant subsequently notified
staff that it will not pursue the geo-foam option, opting instead for surcharging.
On March 27,2006, the Commission voted to appropriate $821,382 for the design and
construction of Orange Avenue, from Tuskawilla Road to Central Winds Park (Jesup's
Landing and Artesian Park are both dependent upon reconstruction of Orange Avenue - a
preconstruction conference for Orange Avenue was held on May 3,2006. At its July 10,
2006, meeting, the Commission denied a request to extend the Orange A venue reconstruction
approximately 145 feet west ofthe approved western bounds of construction. Staffhas noted
issues regarding the installation oftrees in the ROW to the contractor. per 01108/07 agenda
(11) Highlander Property (aka Jesup's Reserve and Barclay Town Center) -161 units. A
concept plan was approved on August 23, 2004, for as many as 170 town home units on 11
acres of what was then an unincorporated county enclave, located between Tuskawilla Trails
and SR 434. An Annexation and Pre-development Agreement was approved at the September
20, 2004, City Commission meeting. Reynolds, Smith and Hills (RSH) met with staff on
October 12 for a pre-application meeting. The property was annexed on October 25,2004.
The Future Land Use designation was changed to Town Center. A revised concept plan for
160 units was approved at the March 28, 2005, Commission meeting. Final
engineering/subdivision plans were approved on August 8, 2004, in conjunction with a
January 22, 2007
Information Item 500
Page 8
development agreement modification. Site work had begun prior to final engineering
approval, pursuant to the Site Development Permit Agreement approved by the City
Commission on May 9, 2005. The aesthetic review was approved at the September 26, 2005,
City Commission meeting. The final plat for Jesup's Reserve was approved at the November
14,2005, City Commission meeting. The plat and restrictive covenants have been recorded.
Crews have completed the potable, sanitary, and storm water system to include the offsite
system along Nature's Way and are constructing the stabilized road base and curbing. Vertical
construction is under way. The temporary sales trailer has been moved into place at the
northeast comer of the site. A development agreement modification was approved at the April
10 Commission meeting. Staff has been working with Levitt to resolve aesthetic issues with
window placement and landscaping. The replat of the subdivision was approved at the
December 11 City Commission and recorded on January 5, 2007. On January 8, the
Commission scheduled a workshop for Tuesday January 30 (6:30 PM), to discuss options
for a buffer between Tuskawilla Trails and Jesup's Reserve. per 01122/07 agenda.
(1J-A) West End Professional Center - A concept plan for the West End Center was approved
by the Commission on February 27,2006. The applicant proposes 2 nearly identical3-floor
office buildings (separate phases), totaling 48,780 SF, on 2.37 acres located within the Town
Center, on the south side ofSR 434, between Jesup's Reserve and the entrance to Tuskawilla
Trails. The aesthetic review package was submitted on March 14 and the site plan was
submitted on March 17. The aesthetic review was held at the April 4 staff review (site plan on
April 18). The aesthetic was approved by the City Commission on June 26, 2006. The
Commission approved the final engineering/site plan at its August 14,2006, meeting, subject
to conditions and a development agreement. A preconstruction meeting was held on
September 15 and a meeting between staff and J Raymond was held on October 11 to discuss
comments regarding the building plans. The Development Agreement modification was
approved at the January 8, 2007, Commission meeting, to allow the applicant the option of
providing 6 seat-walls or a sculpture or fountain and 4 seat-walls. per 01122/07 agenda
(12) Tuskawilla Office Park - Certificates of occupancy have been issued for buildings 1,4-
8, and 11. A new contractor has been hired for Building 10 and a new building permit was
issued March 13,2006. A final engineering/site plan and aesthetic review for a 10,798 SF 2
story office building with 4 garaged parking spaces and 9 exterior on-site parking spaces was
approved at the April 24 Commission meeting. A building permit has been issued for and
construction has commenced on the final building along Tuskawilla Road. Building plan
issues related to later stages of construction are still being addressed between staff and the
architect. Signage for the existing building along Tuskawilla Road is being discussed
between the owner and staff. per 01/22/07 agenda
(J3) Villa Grande - On September 12, the City Commission approved a concept plan for 152
residential condominiums (estimated to be 1,260 - 1,800 square feet each) on 4.75 acres within
the Town Center, between City Hall and Doran Drive. The project is comprised of 5
residential buildings, each with first floor parking and residences above. Two of the buildings
have 3 floors of residences above parking, two have 4 floors of residences above parking, and
one has 5 floors of residences above parking. A separate club-house is provided along Doran
Drive, at the terminal vista at the west end of Blumberg Boulevard. A preliminary
engineering/site plan was approved at the April 10 Commission meeting. A development
January 22, 2007
Information Item 500
Page 9
agreement and the final engineering plan were approved at the July 24 Commission meeting.
An aesthetic review was approved at the August 28 Commission meeting. Staff has been
notified that Lecesse has withdrawn. On October 30, a pre-application meeting was held with
another developer, interested in retail or mixed use development on the site. per 11/13/06
agenda
(14) Lake Jesup Shores - Preliminary engineering/subdivision plans for 68 (now 80 units)
townhomes on 8.7 acres within the Town Center, across SR 434 from Heritage Park, were
received on March 24 and were reviewed by staff on April 12, 2005. Revised preliminary
engineering plans were to be reviewed at a special May 19 staff review, was deferred at the
applicant's request. On June 16, the City Manager and staff met with the property owner, Tom
Daly, and the builder to discuss the outstanding issues. A meeting was then held in South
Miami among the applicant, the City Manager, and Dover Kohl and Partners on July 15. On
August 29, Dover Kohl and Partners notified staff that a subsequent iteration that had recently
been provided to them was a major improvement over the earlier designs, but still had certain
front-back issues. Ryland Homes is the prospective builder and the subdivision is planned by
the Daly Design Group. A preliminary engineering re-submittal for 80 units was received on
October 3, 2005, and was reviewed at the November 1 staff review (subsequent iteration was
provided to Dover Kohl and Partners). A revised plan was approved at the April 10
Commission meeting. No development agreement has been provided to address the
inconsistencies between the plans and the Town Center Code. Staff met with the applicant's
team on April 25 to address architectural embellishment requirements; staff met again with the
applicant, an aesthetic review package was provided and reviewed, and comments have been
provided back to the applicant on June 9. Staff met with Pete Leerdam (Euro-Capital
Partners) and a Ryland Homes representative on June 22, discussing the provision and timing
of the adjacent Central Winds Parkway and Old SR 434 reconstruction, as it relates to Lake
Jesup Shores. On August 15, final engineering/subdivision plans and an aesthetic review
package for 76 town home units in 18 buildings were submitted and were reviewed at the
September 5 staff review. The aesthetic review resubmittal has been sent to Dover Kohl as
well as distributed for further staff review. The aesthetic review was denied by the City
Commission at the November 13 Commission meeting. The Commission agreed to give the
developer 90 days to resubmit the aesthetic review under the same application. per 11/27/06
agenda
(15) AmSouth Bank - On August 15, conceptual plans were submitted for a 3,820 SF bank
building with 4drive-thru lanes on the 1.7 acre site at the NE comer of Parks tone Boulevard
and SR 434 (reviewed at the September 5 staff review). Final engineering plans were
submitted on October 17 and were reviewed at the November 7 staff review. An additional
review was held on November 28. The plans received a recommendation for approval,
subject to conditions, at the January 3 P&Z meeting and are scheduled for January 22
Commission meeting. per 01/22/07 agenda
(15A)Landings at Parkstone - 104 Town Home units. A PUD master plan amendment,
preliminary subdivision plan, and final subdivision plan were approved by the City
Commission at its July 26, 2004, meeting. On September 1, a revised final engineering plan
was submitted, proposing to re-Iocate the entrance more southerly along Parkstone Boulevard
and lower the approved final grade. A revised Development Agreement (DA), PUD master
January 22, 2007
Information Item 500
Page 10
plan amendment, modified final engineering plans, and aesthetic review were discussed at the
December 13, 2004, Commission meeting and were approved on January 10, 2005. A pre-
construction meeting was held on Monday, February 7 (Blue Ox Construction has been doing
the site work). A request by Morrison Homes to amend the DA to allow construction of
model units before platting was approved on May 23. The final plat and HOA documents were
approved on August 8, 2005, and have been recorded. The DA was amended at the January 9
meeting, to accommodate the proposed back porches that face the SR 434 ROW. The models
are being converted to residences. The construction trailer is still in place, but the sales trailer
has been removed. Two (2) 3-unit buildings are to be built in their places. The pool area still
needs to be completed. Seven units had received certificates of occupancy as of January
10. per 01122/07 agenda
(16) SR 434 Retail (a.k.a. Villagio) The Flower Shop, Bicycle Shop, Spring Liquor Store,
Curves Ladies Fitness, Spring Nails, Trustco bank and a cellular telephone company office are
the current tenants. The City Commission validated that the project is built in substantial
accordance with the approved final engineering plans and accepted the water and sanitary
sewer infrastructure for ownership and maintenance at the April 11, 2005, meeting. On
September 25, the Commission approved a DA modification to allow the 6,000 SF restaurant
space in the NW end of the main building to locate 2 building-mounted multi-tenant signs
higher than 14' above the sidewalk. The unoccupied out-building has been issued a certificate
of completion. per 11 /27/06 agenda
(17) Stonebridge Construction(a.k.a. KAI Reserve) - A request for conditional use to
construct multi-family housing on 1.7 acre site in C-l zoning, located on south side ofSR 434,
just west of intersection with SR 419, was postponed at the December 12 City Commission
meeting. Staff was directed to investigate the possibility that the unimproved Celery Avenue
could connect to Hayes Road, the traffic impacts of various types of development, the potential
ramifications of piecemeal development, and the fiscal impact on the City of converting
commercially designated property to multi-family residential. The conditional use was
approved at the January 23 City Commission meeting. The applicant's request to modify the
existing conditional use was denied at the April 24 Commission meeting. Preliminary plans
were submitted May 16 and reviewed at the staff review on June 6; an incomplete re-submittal
was provided to the City on October 9. A second staff review was help on October 31, 2006
and comments were provided to the applicant. Landscape and irrigation plans were provided
on December 6, 2006 in partial fulfillment of staff comments. Staff has scheduled a meeting
for February 6 with the applicant, to help get the project moving again. per 01122/07
Agenda
(17-A) Talis Crossing Subdivision - On December 13, 2005, staff received a subdivision plan
to create 4 lots from a vacant and treed 9.07 acre tract along Fisher Road (also abuts Tusca
Trail- a private roadway). The property abuts the southern edge of Dunmar Estates to the
north and unincorporated Seminole County, to the east. A 175 foot wide Florida Power
Corporation easement extends generally north and south through the property. The plan was
approved at the April 24 Commission meeting. A pre-construction meeting was held on
October 23. per 11/13/06 agenda.
January 22, 2007
Information Item 500
Page 11
(18)) Starlight Baptist Church - On November 1, Starlight Baptist Church submitted a
conditional use application to expand their existing facility on Hayes Road and a site plan for
the expansion. The site plan and conditional use applications were reviewed at the November
22 staff review. The Church was asked to provide additional information before being
scheduled for the Board of Adjustment. Revisions were submitted on March 16 and discussed
at the April 4 staff review. Comprehensive plan issues (e.g. provision of sidewalks), stabilized
grass parking, bus parking, and overnight lodging of visiting ministers in campers, buses, or
RVs are being addressed with the City Attorney. A variance application and fee to allow
grassed parking was received on May 12. The conditional use and variance requests were
heard at a special June 15 BOA meeting and approved at the July 10 City Commission
meeting, subject to conditions. A final engineering/site plan was submitted on August 22 and
was discussed at the September 26,2006, staff review. A draft development agreement has
been received with payment and is now being reviewed by staff. The City Engineer has
provided comments to the applicant's traffic/parking study. per 01/22/07 agenda
(19 Medallion Convenience Store (a.k.a. Hayes Road Plaza) - Final engineering/site plans
were submitted for a convenience store and car wash at the SW comer of SR 434 and Hayes
Road, on March 24, 2004. This site is adjacent to the intersection that was demonstrated to
need an east-bound right-hand auxiliary turn lane. On February 22, a concept plan for a 20,100
SF strip center on the 1.99 acre site was submitted and addressed at the March 7 staff review.
A preliminary site plan for a combination of 14,288 square feet of retail and 2,840 square
feet of restaurant received a recommendation for approval, subject to conditions, at the
January 3 P&Z meeting and is scheduled for the January 22 Commission meeting. per
01/22/07 agenda
(20) Public Works Site - Final engineering plans for the City Public Works complex on Old
Sanford-Oviedo Road were received on December 23,2004, and reviewed at the January 11,
2005, DRC. A concept plan was provided to the City Commission as an informational item at
the January 10, 2005, City Commission meeting. A revised site plan was reviewed at the July
5 staff review. A subsequent meeting was held between Public Works staff, CPH, and the site
engineer. The site plan was approved at the September 26, 2005, City Commission meeting.
At its January 23 meeting, the City Commission authorized a contract with Ruby Builders for
construction ofthe site and certain buildings. Four buildings are under construction to the
interior finish stage. per 01/08/07 agenda
(21) Miller School Supply - Final engineering/site plans were submitted January 27,2005 for
a 10,028 square foot retail building on approximately 1.25 acres of wooded vacant land along
the south side ofSR 434, immediately west of the Cumberland Farms and the G-Man
Restaurant (formerly Papa Tony's). Final engineering/site plans were approved at the May 9
City Commission meeting. An aesthetic review was approved at the June 27 City Commission
meeting. A development agreement to allow the proposed building mounted sign with a 6' tall
apple was approved at the July 11, 2005, City Commission meeting. A pre-construction
meeting was held on December 12,2005. The building appears very close to completion. per
01/08/07 agenda
(22) Jordan Lot Split - On November 16,2005, James and Jacqueline Jordan requested a lot
split, to divide a 3.12 acre lot with an existing home at 125 E. Panama Road into 1.07 and 2.05
January 22, 2007
Information Item 500
Page 12
acre lots. The request was heard at the January 3 staff review. The Jordans have subsequently
(July 12) met with staff to discuss moving forward with the lot split. per 07/24/06 agenda
(23) Venetian Village (formerly the Badcock Shopping Center) - The final site plan,
development agreement, and a general depiction of signage were approved at the June 28,
2004, City Commission meeting. The site plan expired on June 28, 2005. On August 8, 2005,
the City Commission approved two 6-month extensions, extending the site plan. The
development agreement was amended to extend approval to July 28, 2006, for work to
commence. A pre-construction conference was held on July 11, a permit application package
was submitted on July 24 for the wall along the north perimeter ofthe site, and a 6-month
extension for the site plan and development agreement approved on July 24. Clearing occurred
for the wall along the rear of the site. Staff has been working with the contractor to help
him submit a complete building permit application package. per 01122/07 agenda.
(24) Excelsior Office Park (formerly Bonyadi Properties) - Final engineering plans for a
7,101 SF,2 story, office building on a ~ acre lot at the NE comer of Moss Road and Excelsior
Parkway were submitted on May 21, 2004, and were reviewed at the June 8, 2004, DRC. A
resubmittal was received on or about February 28 and was reviewed at the March 29,2005,
DRC. American Civil Engineering met on February 21 with staff to discuss the potential
provision of 5 small office buildings along the north side of Excelsior Parkway. Preliminary
engineering plans were submitted on September 13 and reviewed at the October 3 staff review.
An aesthetic review package was submitted on October 25 and went to the November 7 staff
review. per 01l08/07agenda
(25) Saratoga Condominiums (aka Moss Road Town homes) - 84 units. At its April 12,
2004, meeting, the City Commission approved the Metropolis Homes conditional use
application and concept plan to build as many as 84 condominiums and commercial
development on an "L" shaped 9.10 acre site fronting on both SR 434 and Moss Road, adjacent
to the Bank of America and Victorio's Pizza. On September 20, the City Commission
approved a 6 month extension for the conditional use. Ordinance No. 2004-49 extended the
initial approval of a conditional use from 6 months to 2 years. Preliminary site plans and a
draft development agreement were submitted to the City on April 15 and reviewed at the May
3 staff review. On July 21, the BOA recommended approval for a waiver of the 2 car garage
requirement for condominiums at this site (proposing 1 covered space per unit). The waiver
request was heard on August 22 and was approved at the October 10 Commission meeting. On
August 26, the applicant submitted final engineering plans which were reviewed on September
20. Revised plans were submitted November 2 and were reviewed at the November 22 staff
review. Final engineering plans and a 6 month extension of the conditional use were both
approved at the April 24 Commission meeting (site plan approval was subject to conditions).
A pre-construction meeting was held on August 1. Site work is under way, but no
underground installations have begun. The applicant has petitioned to have a utility easement
vacated and met with staff on December 26 to address aesthetic review. per 01/08/07 agenda
(26) Moss Road International Office Complex - Final engineering plans were submitted on
January 19 for the existing 2.5 acre former State Farm office site, at the SE comer ofSR 434
and Moss Road, and the adjacent 0.65 acre vacant wooded lot. The plan is to use the existing
State Farm building and share the large parking area with 2 additional office buildings on what
January 22, 2007
Information Item 500
Page 13
is now the adjacent vacant property. Final engineering plans and a development agreement
were approved at the May 9 City Commission meeting. A plat to reconfigure the 2 lots was
approved on August 22, 2005. A pre-construction conference was held on June 2 and clearing
began on June 29. The utility crew has returned to the site. The sanitary sewer has been
completed from the "tie in" to the City system to the last "man-hole." A building permit was
issued for the Omei Kung Fu Academy on September 15, 2005. An aesthetic review ofthe
signage was approved at the February 13 Commission meeting. The City Commission resolved
the inconsistencies between the development agreement and the aesthetic review at the March
13 City Commission meeting. A second modification to the development agreement was
approved at the April 24 Commission meeting. per 05/08/06 agenda
(27) Crockett Corner (formerly Fox Run) Subdivision Plan - On August 14, final
engineering plans for Crockett Comer were submitted. This was previously called Fox Run
when it was initially submitted on March 26, 2002, as a preliminary subdivision plan. This s-
lot residential subdivision on 1.28 acres at the west end of Panama Circle was initially
reviewed at the April 2, 2002, staffreview. StafIreview was held on September 5. A revised
submittal was reviewed at the December 19 staff review. per 01/08/07 agenda
(28) The Senior Center - On November 30, staff received a substantially incomplete final
engineering/site plan submittal for the proposed Senior Center improvements. The submittal
was discussed at the December 19 staff review with the consulting engineer and architect and
again among staff on December 27. At its January 8 meeting, the Commission, by
consensus, agreed with the proposed plan with the addition of a porte cochere and some
roof-line embellishments. per 01/22/07 agenda
(29) Harbor Winds (a.k.a. Big Cypress) - 62 Units. The conditional use for town-homes on
the 15 acres east of the Golf Terrace Apartments approved at the August 9,2004, City
Commission meeting for a maximum of94 unit (6.27 d.u./acre). Ordinance No. 2004-49
extended the approval of a conditional use from 6 months to 2 years. Final engineering plans
for 62 units were approved on August 22,2005. A pre-construction conference was held on
August 31, 2005. The plat and restrictive covenants were approved, subject to conditions at
the April 10 Commission meeting. A performance bond was received on April 17. A
modification to add a 10' easement across the front of each lot was approved at the May 8
Commission meeting and the plat and HOA documents were recorded on May 9. There are
approximately 8 buildings that are under construction. per 01108/07 agenda.
(30) Ditmer Large Scale Comprehensive Plan Amendment - The Keewan Real Property
Company has filed a large scale comprehensive plan amendment for 4 parcels totaling
approximately 47.27 acres, located south of Shepard Road and east of US 17-92, to change the
Future Land Use designation from Industrial to Medium Density Residential (3.6 - 9.0
d.u./acre). The properties have C-2 and PUD zoning (no development agreement). The City
Commission voted to transmit the amendment to DCA at the February 13 meeting. The
proposed amendment (Winter Springs 06-1) was transmitted to the Florida Department of
Community Affairs (DCA) on February 17 (received on February 20). The DCA's ORC
report was received on April 24. The City Commission adopted the amendment at its June 12
meeting. The applicant proposes to construct 334 town-homes on the site (tentatively named
Winter Place). Two associated FLU amendments (3 parcels) were approved on first reading on
January 22, 2007
Information Item 500
Page 14
June 26 and for second reading on July 24, subject to passage of the adjacent large scale
amendments. On August 3, the City received notification from the DCA that the amendment
had been found in compliance. A challenge to the comp plan amendment was announced at
the September 25 Commission meeting and an expedited hearing was held at City Hall on
November 28. On January 3, 2007, an administrative law judge fIled a Recommended
Order, recommending that the DCA enter a Final Order determining that the plan
amendment identified in Ordinance No. 2005-29 is in compliance. per 01/22/07 agenda
(31) Nursery Road (Phil Reece) - The final engineering/site plan was approved at the March
8, 2004, City Commission meeting and a preconstruction meeting was held on March 30. The
City Commission approved the aesthetic review ofthe first new building at its July 12, 2004,
meeting. The City Commission validated staff s recommendation that the site was built in
substantial accord with the approved final plans and accepted the potable water and sanitary
sewer at its June 27, 2005, meeting. Staff met with Mr. Reece on November 7 to begin to
determine a signage plan for the site. The aesthetic review of building # 5 was approved at the
November 28 City Commission meeting and the building is under construction and nearing a
Certificate of Occupancy. At its July 10, 2006, meeting, the Commission validated the
findings that the Phase IIB-l improvements are constructed in substantial accord with the final
engineering plans. The applicant is preparing to replace the building where Hub Cap Daddy is
presently located and update signage. The aesthetic review for buildings 1 and 4 were
approved at the August 14 Commission. per 08/28/06 agenda
(32) Penev Auto Shop - A preliminary engineering/site plan was submitted on August 19,
2005, for a 2,100 square foot shop on a 0.29 acre undeveloped and treed site, located on the
south side ofSR 434, approximately 800 feet east of US 17-92. The site has C-2 zoning, a
Commercial FLU designation, and is located within the SR 434 Redevelopment Overlay
Zoning District. City of Winter Springs potable water and sanitary sewer do not appear to be
located within close proximity of the site. The site plan was reviewed at the September 6 staff
review. A re-submittal without the applicant's responses to staff comments was received on
October 3,2005, and reviewed at the October 18 staff review. A resubmittal was received on
January 21 for staff review. per 02/13/06 agenda
SR 434 VillaIle Walk Proiect - On September 1, 2006, Vila and Son Landscaping completed
the installation of replacement Magnolia trees that recently perished while under warranty to
Seminole County pursuant to the SR 434 Access Management Project (Village Walk).
Pursuant to commitments made by Vila and Son to Seminole County and the City of Winter
Springs, staff expects replacements of shrub and ground cover materials in the near future. On
September 10, 2006, staff ordered from The TruGreen Companies a condition report and
preventative chemical application program consisting of pesticides, a fungicide and a
fertilization package; to be applied to all Magnolia trees in the Village Walk Project the week
of September 18, 2006. On October 4, staff sent sub-contractor Vila and Son Landscaping
and primary contractor AP AC communication that all dead or missing plant material must be
replaced, pursuant to the 2-year job warranty -Vila and Son completed the warranty plant
replacement. Staffhas received bids for and has begun embellishing select locations
throughout the Village Walk with additional plant material (e.g. medians, roadsides, and
around the 2 gazebos). Pine bark mulch has been installed in all these planting beds.
January 22, 2007
Information Item 500
Page 15
Staff budgeted for additional plant installations throughout the Village Walk area beginning
October 1, 2006 to enhance the project by providing a balance of evergreen material and a
variety of additional perennial color that will manifest evenly throughout the year.
Landscaping enhancements have been added at the following locations: both gazebos,
Edgemon & SR 434, Devon & SR 434, Fairfax & SR 434, Bombay & SR 434, and Algiers &
SR 434. per 01108/08 agenda
TOWN CENTER
PROJECT DEVELOPER TYPE # OF UNITS ACRES
J esup' s Landing Levitt & Sons Townhomes 185 17.2
J esup Reserve Levitt & Sons Townhomes 161 11
Sonesta Pointe Engle Homes Townhomes 408 40
Lake J esup Shores Ryland Homes Townhomes 76 8.7
Artesian Park VHB Townhomes 103 8.0
Villa Grande LeCesse Condominiums 152 4.75**
Doran (Bldgs. 4 & 17) JDC (Doran) Condominiums 41 0.81
Doran Phase II-A JDC (Doran) Condominiums 312 7.75
Total 1,438 98.21
REMAINDER
PROJECT DEVELOPER TYPE # OF UNITS ACRES
Barclay Reserve Ashton Woods Townhomes 88 7.4
To Be Named ICI Condo 480+/- 40
Heritage Park Centex Townhomes 158 14.5 *
Harbor Winds Morrison Homes Townhomes 62 15
Landings at Parkstone Morrison Homes Townhomes 104 12
Saratoga Condos Metropolis Condos 84 9.1
KAI Reserve KAI Properties Townhomes 15 1.7
Winter Place Keewin Properties Townhomes 334 47.3 *
Crocket Comer SFR 5 1.28
TOTAL 1,330 148.28
* Future Land Use Amendment only. No site or subdivision plan submitted for either the
ICI or Keewin projects. Although as many as 100 residential units could be constructed
at the Winter Springs portion of the Oviedo Marketplace, no concept plan, site plan, or
subdivision plan has been provided.
** Staff has been told that Lecesse has withdrawn the Villa Grande project.
Board of Adjustment
(33) The Grove - On December 12, The Grove Counseling Center submitted a conditional use
(CD) to expand the existing facility on Old Sanford-Oviedo Road. This is the first step to
allow a new classroom building to be constructed on part of the existing parking lot. After the
CD, a site plan may be submitted. When the site plan is approved, a building permit may be
January 22, 2007
Information Item 500
Page 16
submitted. The CD received a recommendation for approval at the January 4 BOA
meeting and is scheduled for the January 22 Commission meeting. per 01/22/07 agenda
FUNDING: None required
RECOMMENDATION: None required
ATTACHMENTS:
Map Locations
Student Generation Rates
COMMISSION ACTION:
CITY OF WINTER SPRINGS MASTER PLANNING MAP
City of Winter Springs
TOWN CENTER