Loading...
HomeMy WebLinkAboutMonthly ReportTLBD Reports for 3/18/03 meeting By Kangee LIGHTIl~iG /FLORIDA POWER/PROGRESS ENERGY 3/14/b3 Friday 8:OOpm All light operating No complaints LIGHTING /LANDSCAPE 3/~In3 Friday 10:00am Lights Unlimited tmuble shooting Main Entry WS Bivd. - Several repaired, All lights functioning at this time Seneca WS Blvd. All but one light water problems Repaired one Holding repair on remainder/parts All other Entries Holding repair for parts REPORT: Weather proof ballasNs impracticaU won't fit aver boroes and costs a~ociated. Replace ballast's with coil on coil type ballast's and seal boxes with silicone and port in line fuses m prevent tripping breakcrs and killing all the lights recommends this as the best gams plan. Presently mooch sand in sc~v holds that are keeping boxes from sealing well. Only repaired will receive line fuses at this time (materials costs about S 10 ea). This will reduce time to trouble shot in the ftrture and keelr remaining lights functioning when only erne has a problem. We will address function and location of other emry lights once moisdue and soooum problems are solved Work to contimre on Wed. am 3/19. 3/17Jn3 Moruday 10:00am Lights Unlimited- call All Envies Parts in: Ballasts (12 or so) Fuses (20 or so) Sponges Air Cylinders Silicone REPORT: Work still scheduled for Wed am 3/19/n3 IRRIGATION All Entries and Blvd Kangee a~ P & L cumer~ly working a~n list of items to be Repaired as well as adjustments and arty changes to be made. 3/06 and 3/10 lists oompiloctbpr walk thru with Kangee, Alan, City support and P bt L Contractor and crew. Emergency breaks addressod by city and ooanpleted by 3/13. List available. LANDSCAPING /Fertilization and Pest Control Main Eatry Down lire on North side -City notified 3/14 Froffiage Rd Adding an to temporary oontracx with P 8c L They were unable to address an 3/12 or 3/13 Seneca WS Blvd Lots of water -City still addressing Only a small part of this problem can be solv~od With piamud irrigation changes. Seneca I.ettcring installed, dead shrubs to be removed And replaood as well ae matching sides Trottwood P 8t L failed to mow behind South sign - They were notified to r+etutn WS BLVD Down limb at island 9 -City notified 3/14 Truck stnx~c limb -request city to trim trees Tuscora Ant pile in tier being addressed Lar~ana to be trimmed Kangee ranaved 5 Indian Hawthorn so that HOA contractor may enter east pound for maim. Vistawilla True in 8ront of east sign to be trimmed Dead foliage to be removed acid counted/oontracwr Shetland/Citnrs City has been working hard to address drainage Problems -work continues on this erary REPORT: So far, P & L have shown great response on items of concern. 3/18/03 - Working toremove and count dead plants. They da report that many of the azaleas at the fi~ emry -south are still alive and will most h'kely rebound with 'may Tamed ligrrstnum~s. Reports to be faxed on fertilization and pest control that has been used over past two weeks along Blvd. And at fi+ont entry so far. Work continua. Weeds have been addressed in most areas. Recounts on plants replacements and costs to follow with next t+eport Some areas of sight concerns are being addressed this week. 3/19/03 List available. HARDSCAPE MAIIVTENANCE FrontEntry - 3/12/03 Mallard treated walls for mold, mildew and algae 3/18/03 Touch-up perfornrod Report to follow on renro~val of water deposits arui rdations On addressing drairwge ofbeds. All other Entries One estim~e in on cleaning remaining walls of TLBD To be addressed with reanoval of deposits WS BLVD Bridges City has had both bridges and their side walks sand blasted for unsightliness and, age of barriers. 3/12/03 and 3/13/03 FOUNTAINS Thursday 3/13/()3 Florida Water Features to remove sand accumulatiod in waterfall Tiers and basin in order for us do better monitor source of sand if improved water visibility is desinpd, recommendation for a filter Has been made. ~h pond~waber pomp seems to mn oorninuously. contr~t°r presently cleaninS on Tvesaays ana chedang again ~ Thursday or Friday for oar woekend operation. Filter trends to clog easily and pump surges until debris is removed. Crack on side and~botbom on North pond presently being monitored for any changes in size.